Sewer Size
(inches)
|
Minimum Slope in Feet
per 100 Feet
|
---|---|
8
|
0.50
|
10
|
0.35
|
12
|
0.30
|
14
|
0.17
|
15
|
0.15
|
16
|
0.14
|
18
|
0.12
|
21
|
0.10
|
24
|
0.08
|
Size of Pipe (Diameter)
(inches)
|
Depth to Flowline
(feet)
|
Overall Width of Permanent Easement (pipe in center of easement)
(feet)
|
---|---|---|
8 to 24
|
0 to 12.0
|
15
|
12.1 to 20.0
|
20
| |
> 20.0
|
ES approval req.
| |
Greater than 24
|
Any depth
|
ES approval req.
|
Plan and Profile Sheets Plan:
| |||
---|---|---|---|
Yes
|
No
|
N/A
| |
Scale shown (1" = 40' horizontal, 1" = 4' vertical
for undeveloped areas, 1" = 20' horizontal, 1" = 4' vertical
for developed areas).
| |||
North arrows shown.
| |||
Line types defined (if not in standards).
| |||
Easements shown with book/page numbers.
| |||
Names shown of all landowners affected by project.
| |||
Manholes not shown in detention. If detention is necessary,
specify manhole above detention rim and grading around manhole.
| |||
New easements dimensioned and properly described.
| |||
Length of sewer main is to be measured from inside wall of manholes
(not center to center of manholes).
| |||
Stationing of manholes and casing ends shown.
| |||
All other existing and proposed utilities and structures appear
to be shown.
| |||
Stationing in fifty-foot intervals.
| |||
Main placed in center of parkway where possible, otherwise is within an easement or right-of-way. Easements should conform to Subsection (E)(2)(d)(9).
| |||
Manholes shown to not be within existing or proposed sidewalks
unless approved by City of Battlefield.
| |||
State plane coordinates on manholes and angles at manholes shown
with bearing reference.
| |||
Station, size, and length of service lateral and tee shown.
Tee and lateral shown to be perpendicular to main within easement
or R/W.
| |||
All end-of-line manholes shown to be fifteen (15) feet past
property line.
| |||
If adding manhole to existing sewer, the immediate upstream
and downstream manhole elevations shown as shot in field, and any
service laterals shown.
|
Profile:
| |||
---|---|---|---|
Yes
|
No
|
N/A
| |
Stationing shown.
| |||
Scale shown (1" = 40', 1" = 4' for undeveloped areas,
1" = 20', 1" = 4' developed areas).
| |||
Stationing and elevation of manholes and casing ends shown.
| |||
All other existing and proposed utilities and structures to
be shown.
| |||
Pipe slope, material, and size is shown.
| |||
Z-Lok connection specified where incoming or outgoing pipe grade
is greater than ten percent (10%) and manhole should have five tenths
(0.5) feet of fall through invert.
| |||
Four (4) feet of cover maintained over all mains.
| |||
Plot minimum finished floor elevation at station shown on plan
and show Lot number, size, and length of lateral.
| |||
SDR 21 PVC pipe used if less than eighteen (18) inches clearance
between top of sanitary sewer and bottom of storm sewer. Sewer pipe
may be required to be installed in steel casing or by bridging (SAN-33).
| |||
SDR 21 PVC pipe present from MH to MH if sanitary sewer less than eighteen (18) inches vertical clearance of a water main. Also, note the special testing procedures shown. [See Subsection (E)(2)(e)(2).]
| |||
Sewer main in steel casing if ground cover of eighteen (18)
inches impossible to attain; concrete encasement acceptable at creek
crossings.
| |||
Note to place fill prior to sewer installation shown where fill
proposed to attain four (4) feet of cover.
| |||
Distance between manholes centers less than four hundred (400)
feet.
| |||
Minimum slope for eight (8) inch main five-tenths percent (0.5%).
| |||
Concrete anchors along main shown if slope exceeds fifteen percent
(15%) (see SAN-32[7]).
| |||
Trench seal specified on both sides of creek crossings (see
SAN-21[8]).
| |||
Bank and channel protection specified at creek crossing.
| |||
Casing and boring details shown with a minimum boring slope
of one percent (1%).
| |||
If utilizing existing sewer, all existing and proposed service
connections are shown, and all manhole lid and flow line elevations
are given.
|
Station Name & I.D. No. (Obtain from City)
Sewage Pumping Station
City of Battlefield
No Trespassing
In Case of Emergency or Alarm
Please Call (417) 883-5840 or 911
|
Vrmin = (T x Q) ÷ (4)
| ||
Where:
| ||
Vrmin
|
=
|
Required minimum pump cycle volume between pump-on and pump-off,
gallons
|
T
|
=
|
Required time between pump starts, minutes
|
Q
|
=
|
Pump discharge capacity, gallons per minute
|
Paving and Storm Drainage Improvements
for
(Name of Subdivision)
a Subdivision in the City of Battlefield, Missouri
|
A)
|
Title block, showing the name of the proposed project, drawing
title, and drawing number.
|
B)
|
Name, address, and telephone number of the consultant.
|
C)
|
Seal of responsible design professional.
|
D)
|
A scale for each plan or detail.
|
E)
|
A north arrow for all full or partial site plans and maps.
|
F)
|
The Missouri One Call utility locates symbol on all drawings
involving earthwork.
|
A)
|
General project information.
|
B)
|
Site boundary and dimensions.
|
C)
|
Grading plan.
|
D)
|
Plan of proposed storm drainage facilities.
|
E)
|
Sediment and erosion control plan (SECP).
|
F)
|
Profiles for storm drainage improvements.
|
G)
|
Details of stormwater facilities.
|
A)
|
Location map at a scale of 1" = 2,000' (one inch equals two
thousand feet), showing streets and roads of collector or greater
classification and municipal boundaries within one thousand (1,000)
feet of the site.
|
B)
|
General Notes. See Figure SS-2.[14]
|
C)
|
Name, address, and telephone number of developer.
|
D)
|
Index to drawings.
|
E)
|
Benchmark data.
|
F)
|
Legal description of property.
|
G)
|
Key to symbols used in the drawings.
|
H)
|
Location plan.
|
A)
|
Beginning at each point of discharge from the site, the storm
drainage system shall be organized into a system of "lines" for identification
of profiles. Storm drainage lines shall be numbered in consecutive
order, beginning with the number one (1). Inlets, outlets, junction
structures, and other points of reference shall be designated by letters
beginning at the downstream-most point in each line with the line
number followed by the reference letter, beginning with the letter
"A"; i.e., 1-A, 1-B, etc. Each line shall extend from the downstream
point of discharge to the upstream-most element in the line, and shall
include "non-constructed" elements, such as natural channels.
|
A)
|
Where the difference in grade between the centerline and the
edge of the easement in which the proposed improvement is located
is one (1) foot or more, additional existing grade and/or finish grade
profile lines may also be required along the easement lines. Additional
profile lines shall be labeled as to location.
|
A)
|
General project information.
|
B)
|
Site boundary and dimensions.
|
C)
|
Grading plan.
|
D)
|
Plan of proposed storm drainage facilities.
|
E)
|
Sediment and erosion control plan (SECP).
|
F)
|
Profiles for storm drainage improvements.
|
G)
|
Details of stormwater facilities.
|
Table 1: Rainfall Depth-Duration-Frequency Relationships from
NOAA Atlas 14 Volume 8 Version 2, Precipitation-Frequency Atlas of
the United States, Midwestern States.
| |||||||
---|---|---|---|---|---|---|---|
Duration
|
Depth of Precipitation (in)
| ||||||
1-year
|
2-year
|
5-year
|
10-year
|
25-year
|
50-year
|
100-year
| |
5 min.
|
0.38
|
0.43
|
0.53
|
0.61
|
0.72
|
0.81
|
0.90
|
10 min.
|
0.55
|
0.63
|
0.77
|
0.89
|
1.05
|
1.18
|
1.31
|
15 min.
|
0.67
|
0.77
|
0.94
|
1.08
|
1.28
|
1.44
|
1.60
|
30 min.
|
0.98
|
1.14
|
1.39
|
1.60
|
1.89
|
2.12
|
2.33
|
1 hr.
|
1.29
|
1.50
|
1.84
|
2.14
|
2.55
|
2.88
|
3.21
|
2 hr.
|
1.60
|
1.86
|
2.30
|
2.67
|
3.21
|
3.64
|
4.08
|
3 hr.
|
1.79
|
2.08
|
2.58
|
3.01
|
3.63
|
4.14
|
4.67
|
6 hr.
|
2.19
|
2.51
|
3.09
|
3.60
|
4.35
|
4.97
|
5.64
|
12 hr.
|
2.67
|
3.02
|
3.65
|
4.22
|
5.06
|
5.77
|
6.52
|
24 hr.
|
3.16
|
3.60
|
4.35
|
5.01
|
5.98
|
6.77
|
7.60
|
48 hr.
|
3.65
|
4.23
|
5.19
|
6.00
|
7.14
|
8.04
|
8.95
|
72 hr.
|
4.01
|
4.63
|
5.65
|
6.51
|
7.70
|
8.64
|
9.59
|
Table 2: Rainfall Intensity-Duration-Frequency Relationships
from NOAA Atlas 14 Volume 8 Version 2, Precipitation-Frequency Atlas
of the United States, Midwestern States
| |||||||
---|---|---|---|---|---|---|---|
Duration
|
Intensity of Precipitation (in/hr)
| ||||||
1-year
|
2-year
|
5-year
|
10-year
|
25-year
|
50-year
|
100-year
| |
5 min.
|
4.56
|
5.16
|
6.36
|
7.32
|
8.64
|
9.72
|
10.80
|
10 min.
|
3.30
|
3.78
|
4.62
|
5.34
|
6.30
|
7.08
|
7.86
|
15 min.
|
2.68
|
3.08
|
3.76
|
4.32
|
5.12
|
5.76
|
6.40
|
30 min.
|
1.96
|
2.28
|
2.78
|
3.20
|
3.78
|
4.24
|
4.68
|
1 hr.
|
1.29
|
1.50
|
1.84
|
2.14
|
2.55
|
2.88
|
3.21
|
2 hr.
|
0.80
|
0.93
|
1.15
|
1.34
|
1.61
|
1.82
|
2.04
|
3 hr.
|
0.60
|
0.69
|
0.86
|
1.00
|
1.21
|
1.38
|
1.56
|
6 hr.
|
0.37
|
0.42
|
0.52
|
0.60
|
0.73
|
0.83
|
0.94
|
12 hr.
|
0.22
|
0.25
|
0.30
|
0.35
|
0.42
|
0.48
|
0.54
|
24 hr.
|
0.13
|
0.15
|
0.18
|
0.21
|
0.25
|
0.28
|
0.32
|
48 hr.
|
0.08
|
0.09
|
0.11
|
0.13
|
0.15
|
0.17
|
0.19
|
72 hr.
|
0.06
|
0.06
|
0.08
|
0.09
|
0.11
|
0.12
|
0.13
|
Table 3
Cumulative Storm Rainfall (%) for Given Storm Type
| ||||
---|---|---|---|---|
Cumulative Storm Time
(%)
|
First Quartile
(Duration £ 6 hours)
|
Second Quartile
(6 < Duration £ 12 hours)
|
Third Quartile
(12 < Duration £24 hours)
|
Fourth Quartile (Duration > 24 hours)
|
0%
|
0%
|
0%
|
0%
|
0%
|
5%
|
16%
|
3%
|
3%
|
2%
|
10%
|
33%
|
8%
|
6%
|
5%
|
15%
|
43%
|
12%
|
9%
|
8%
|
20%
|
52%
|
16%
|
12%
|
10%
|
25%
|
60%
|
22%
|
15%
|
13%
|
30%
|
66%
|
29%
|
19%
|
16%
|
35%
|
71%
|
39%
|
23%
|
19%
|
40%
|
75%
|
51%
|
27%
|
22%
|
45%
|
79%
|
62%
|
32%
|
25%
|
50%
|
82%
|
70%
|
38%
|
28%
|
55%
|
84%
|
76%
|
45%
|
32%
|
60%
|
86%
|
81%
|
57%
|
35%
|
65%
|
88%
|
85%
|
70%
|
39%
|
70%
|
90%
|
88%
|
79%
|
45%
|
75%
|
92%
|
91%
|
85%
|
51%
|
80%
|
94%
|
93%
|
89%
|
59%
|
85%
|
96%
|
95%
|
92%
|
72%
|
90%
|
97%
|
97%
|
95%
|
84%
|
95%
|
98%
|
98%
|
97%
|
92%
|
100%
|
100%
|
100%
|
100%
|
100%
|
Table 4
| |
---|---|
Watershed Size
|
Minimum Recommended Duration
|
< 160 acres
|
30 min
|
160 acres to < 1 sq. mi.
|
1 hr.
|
1 sq. mi. to < 4 sq. mi.
|
2 hr.
|
4 sq. mil to < 8 sq. mi.
|
3 hr.
|
8 sq. mi. to < 16 sq. mi.
|
6 hr.
|
16 sq. mi. to < 32 sq. mi.
|
12 hr.
|
> 32 sq. mi.
|
24 hr.
|
NOTE: Topographic information (five-foot contour intervals)
is available for certain portions of the area around the City of Springfield
on the 1976 Springfield Planning Area maps. These maps should be used
in determining off-site drainage areas, where more detailed maps are
not available. Where no other topographic maps having sufficient detail
to determine the drainage area in question are available, aerial photo
maps available from the County Assessor's office should be used
with drainage area limits and paths of flow determined in the field.
|
Regardless of the data used, it is the designer's responsibility
to field verify that the drainage areas used are reasonably accurate.
|
Q = CIA, where:
| ||
Q
|
=
|
peak runoff rate for a design storm of recurrence interval,
T, in cubic feet per second (cfs)
|
C
|
=
|
dimensionless runoff coefficient; recommended runoff coefficient values are given in Subsection (F)(3)(h)(3). The value used shall be the composite value based upon the type of surface coverage in the drainage area for the runoff condition being considered.
|
I
|
=
|
average rainfall intensity for a storm of recurrence interval,
T, over a duration equal to or greater than the time of concentration
for the contributing drainage area.
|
A
|
=
|
tributary watershed area in acres
|
The time of concentration utilized shall be determined for conditions
under which the peak flow rate is calculated, i.e., pre-project conditions
for the pre-project peak flow rate and post-project conditions for
the post-project peak flow rate, etc.
| ||
The general procedure for Rational Method calculations for a
single watershed is as follows:
| ||
1.
|
Delineate the watershed boundary and calculate its area.
| |
2.
|
Define and measure the flow path from the upper-most portion
of the watershed to the design point.
| |
3.
|
Calculate the slope for the flow path.
| |
4.
|
Calculate time of concentration, tc.
| |
5.
|
Find the rainfall intensity, i, for the design storm using the
calculated tc as the duration.
| |
6.
|
Determine the runoff coefficient, C.
| |
7.
|
Calculate the peak flow rate from the watershed.
|
where:
| |||
tc
|
=
|
time of concentration in minutes
| |
L
|
=
|
length of travel in feet
| |
S
|
=
|
slope of the flow path from the remote part of the basin to
the calculation point divided by the horizontal distance between the
two points (ft./ft.)
| |
The Kirpich equation is most applicable for undeveloped watersheds
with well-defined channels, bare-earth overland flow, or flow in mowed
channels. The following adjustment factors are recommended for other
conditions (Chow et al. 1988):
| |||
•
|
For flow in natural grassed channels, multiply by 2.
| ||
•
|
For overland flow on concrete or asphalt surfaces, multiply
by 0.4.
| ||
•
|
For concrete channels, multiply by 0.2.
| ||
where:
| |||
Nk
|
=
|
coefficient of roughness, presented in Table 5 below
| |
L
|
=
|
overland flow length (ft), maximum of 100 feet for undeveloped
areas and 100 feet for developed areas
| |
S
|
=
|
average overland slope (ft/ft)
| |
Total time of concentration can be found using the following
equation:
| |||
Table 5
| |
---|---|
Surface Type
|
Nk
|
Smooth impervious surface
|
0.05
|
Smooth bare packed soil, free of stones
|
0.10
|
Poor grass, cultivated row crops, or moderately rough bare surfaces
|
0.20
|
Pasture or average grass cover
|
0.40
|
Deciduous timberland
|
0.60
|
Conifer timberland, deciduous timberland with deep forest litter,
or dense grass cover
|
0.80
|
Table 6: Runoff Coefficients
| |
---|---|
By Surface Type - Use as Basis for Computation of Composite
Runoff Coefficients
| |
Surface Type
|
Runoff Coefficients
|
Asphalt, concrete pavement, roofs
|
0.95 to 1.0
|
Gravel surfaces, compacted
|
0.85 to 0.95
|
Gravel surfaces, not compacted
|
0.50 to 0.70
|
Parks, golf courses, farms
|
0.10 to 0.20
|
Lawns, pastures, hayfields
| |
Flat (< 2% slopes)
|
0.10 to 0.15
|
Average (2% to 7% slopes)
|
0.15 to 0.20
|
Steep (> 7% slopes)
|
0.20 to 0.30
|
Woods
|
0.05 to 0.15
|
Composite Coefficients for Single-Family Residential Areas
| |||
---|---|---|---|
Surface Type
|
Runoff Coefficients
| ||
Average lot size, 1/4 acre
|
Flat (<2% slopes)
0.35 to 0.45
|
Average (2% to 7% slopes)
0.40 to 0.50
|
Steep (>7% slopes)
0.45 to 0.55
|
Average lot size, 1/3 acre
|
Flat (<2% slopes)
0.30 to 0.40
|
Average (2% to 7% slopes)
0.33 to 0.43
|
Steep (>7% slopes)
0.40 to 0.50
|
Average lot size, 1/2 acre
|
Flat (<2% slopes)
0.25 to 0.35
|
Average (2% to 7% slopes)
0.30 to 0.40
|
Steep (>7% slopes)
0.36 to 0.46
|
Average lot size, 1 acre
|
Flat (<2% slopes)
0.20 to 0.25
|
Average (2% to 7% slopes)
0.25 to 0.30
|
Steep (>7% slopes)
0.60 to 0.38
|
Average lot size, 3 acres
|
Flat (<2% slopes)
0.10 to 0.20
|
Average (2% to 7% slopes)
0.13 to 0.24
|
Steep (>7% slopes)
0.25 to 0.33
|
Note: The ranges of C values presented in Table 6 above are
typical for return periods of two (2) years to ten (10) years and
assume average antecedent moisture conditions. Higher values are appropriate
for larger design storms.
|
Table 7: Multiplier for larger design storms
| |
---|---|
Recurrence Interval (years)
|
Adjustment Multiplier
|
25
|
1.1
|
50
|
1.2
|
100
|
1.25
|
U.S. Army Corps of Engineers HEC-HMS Flood Hydrograph Package.
|
Soil Conservation Service TR-55 and TR-20
|
Kinematic Wave Method
|
Other methods may be used upon written approval of the City
of Battlefield, provided that they are documented in accepted engineering
literature and are used within the limitations stated. Methods used
for distribution of rainfall, determining precipitation losses, accounting
for channel and reservoir storage effects, etc., shall be as prescribed
in the literature for the selected method.
|
Table 8: Curve Number based on Hydrologic Soil Group
| ||||
---|---|---|---|---|
Cover Description
|
Curve numbers for hydrologic soil group
| |||
Cover type and hydrologic condition
|
A
|
B
|
C
|
D
|
Idle lands (not yet developed)
| ||||
Pasture, grassland, or range - continuous forage for grazing:
| ||||
Good condition (ground cover >75% and only occasionally grazed)
|
39
|
61
|
74
|
80
|
Meadow - continuous grass, protected from grazing, and generally
mowed for hay
|
30
|
58
|
71
|
78
|
Woods-grass (50%-50%) combination, orchard or tree farm Other
combinations can be calculated as composite of pasture and woods Good
condition
|
32
|
58
|
72
|
79
|
Woods
Good condition (i.e., woods are protected from grazing, and
litter and brush adequately cover the soil)
|
30
|
55
|
70
|
77
|
Farmsteads - buildings, lanes, driveways, and surrounding lots
|
59
|
74
|
82
|
86
|
Table 9: Weighted Curve Number for watersheds with multiple
soil types
| |||||
---|---|---|---|---|---|
Cover Description
|
Curve numbers for hydrologic soil group
| ||||
Cover type and hydrologic condition
|
Average percent impervious area
|
A
|
B
|
C
|
D
|
Fully developed urban areas (vegetation established)
| |||||
Open space (lawns, parks, golf courses, cemeteries, etc.)
| |||||
Good condition (grass cover >75%)
|
39
|
61
|
74
|
80
| |
Fair condition (grass cover 50% to 75%)
|
49
|
69
|
79
|
84
| |
Poor condition (grass cover less than 50%)
|
68
|
79
|
86
|
89
| |
Impervious areas
| |||||
Paved parking lots, roofs, driveways, compacted
gravel, etc.
(excluding right-of-way)
|
98
|
98
|
98
|
98
| |
Small open spaces within development or ROW:
|
72
|
82
|
87
|
89
| |
Streets and roads:
| |||||
Paved; curbs and storm sewers (including right-of-way)
|
90
|
93
|
95
|
97
| |
Paved; open ditches (including right-of-way)
|
83
|
89
|
92
|
93
| |
Gravel (including right-of-way)
|
76
|
85
|
89
|
91
| |
Dirt (including right-of-way)
|
72
|
82
|
87
|
89
| |
Urban districts:
| |||||
Commercial and business
|
85%
|
89
|
92
|
94
|
95
|
Industrial
|
72%
|
81
|
88
|
91
|
93
|
Residential districts by average lot size:
| |||||
1/8 acre or less (townhouses)
|
65%
|
77
|
85
|
90
|
92
|
1/4 acre
|
38%
|
61
|
75
|
83
|
87
|
1/3 acre
|
30%
|
57
|
72
|
81
|
86
|
1/2 acre
|
25%
|
54
|
70
|
80
|
85
|
1 acre
|
20
|
51
|
68
|
79
|
84
|
2 acres
|
12%
|
46
|
65
|
77
|
82
|
Developing urban areas:
| |||||
Newly graded areas (pervious areas only, no vegetation)
|
77
|
86
|
91
|
94
|
Table 10: USGS Regression Equations
| |
---|---|
Recurrence Interval
|
USGS Regression Equation
(Q = estimated peak flow rate [cfs], A = drainage area [mi2], I = impervious area in percent)
|
2-year
|
Q2= 188DRNAREA0.599100.014IMPLNLCD01
|
5-year
|
Q2= 352DRNAREA0.592100.011IMPLNLCD01
|
10-year
|
Q2= 484DRNAREA0.594100.010IMPLNLCD01
|
25-year
|
Q2= 671DRNAREA0.599100.008IMPLNLCD01
|
50-year
|
Q2= 826DRNAREA0.604100.008IMPLNLCD01
|
100-year
|
Q2= 991DRNAREA0.608100.007IMPLNLCD01
|
500-year
|
Q2= 1420DRNAREA0.619100.006IMPLNLCD01
|
Table 11: City Street Inundation Criteria
| ||||
---|---|---|---|---|
Street Classification
|
Minor Storm (2-year)
|
Major Storm (100-year)
| ||
Local
|
•
|
No flow from 1 side of street to another
|
•
|
No curb overtopping
|
•
|
No curb overtopping
| |||
•
|
Inlets spaced for a maximum spread of 8 feet from curb face
with 1 clear 10-foot travel lane
| |||
Collector
|
•
|
No flow from 1 side of street to another
|
•
|
No curb overtopping
|
•
|
No curb overtopping
| |||
•
|
Inlets spaced for a maximum spread of 8 feet from curb face
with on 12-foot travel lane clear for residential collectors, and
2 10-foot travel lanes clear for non-residential collectors
| |||
Arterial
|
•
|
No flow from 1 side of street to another
|
•
|
No curb overtopping
|
•
|
No curb overtopping
| |||
•
|
For secondary arterials, inlets spaced for a maximum 12-foot
spread with 2 12-foot travel lanes open
| |||
•
|
For other arterials, inlets spaced for a maximum 6-foot spread
with 1 full lane and 1 8-foot lane clear in both directions
|
Curb opening inlets may be constructed of either precast or
cast-in-place concrete. Cast-in-place concrete construction shall
meet the requirements of Chapter VII of the City of Springfield Technical
Specifications or Public Works Construction.
|
A)
|
Open side drop inlets are intended for use in locations where
open drainage channels, ditches, or swales terminate and flow enters
the storm drain system, and flows range from ten (10) cubic feet to
one hundred (100) cubic feet per second. These inlets are preferred
in order to minimize the risk of persons being swept into an open
storm drain entrance.
|
B)
|
This inlet has a four-foot by four-foot exterior dimension and
a maximum capacity of about eighteen (18) cfs per opening at a maximum
allowable depth of two (2) feet. The designer must stipulate on the
drawing the number of open sides to be provided, i.e., Type DI-1 w/2
sides open, etc. Interception capacity data for standard DI-1 inlets
are shown in Figure SS-16.[21]
|
C)
|
Where additional capacity is needed, larger inlet structures
can be used, provided dimensions are detailed on the drawings and
interception capacity calculations are submitted. The maximum allowable
opening height is six (6) inches. For greater opening heights, a horizontal
bar shall be placed across the opening at maximum six-inch intervals.
|
A)
|
Grated area inlets may be provided in parking lots and lawn
areas. The maximum ponding depth over grated inlets shall be twelve
(12) inches for the major (100-year) storm. Concrete dimensions and
reinforcement requirements for the inlet structure and the type of
grate and frame to be used shall be specified in the drawings. Gratings
shall be bicycle safe.
|
B)
|
It is recommended that a one-and-one-half-inch depression be
provided for area inlets in paved parking areas to minimize standing
water (see Figure SS-17[22]). It is also recommended that a reinforced concrete paving
apron be provided for two (2) feet around the inlet to prevent pavement
failure and subsequent water ponding around the inlet.
|
Other types of inlets will not be permitted unless approved
by the City of Battlefield.
|
Table 12: Minimum Easement Widths
| |
---|---|
Inside Horizontal Dimension
(inches)
|
Minimum Easement Width
(feet)
|
15 to 48
|
15
|
54 to 72
|
17.5
|
84 and 96
|
20
|
Over 96
|
Approval required
|
Material
|
Symbol
|
Standard
|
---|---|---|
Reinforced concrete round pipe
|
RCP
|
ASTM C-79, C1 III
|
Reinforced concrete elliptical pipe
|
RCEP
|
ASTM C-507
|
Reinforced concrete pipe-arch
|
RCPA
|
ASTM C-478
|
Precast concrete flared end sections
|
FES
|
ASTM C-76
|
Corrugated, galvanized steel round pipe
|
CMP
|
ASTM A-760/AASHTO M-36
|
Corrugated, galvanize steel pipe-arch
|
CMPA
|
AASHTO M-167
|
Galvanized steel flared end sections
|
FES
|
ASTM A-760
|
Corrugated polyethylene pipe
|
CPP
|
ASTM D-1248
|
Cast-in-place reinforced concrete box culverts
|
RCB
|
MODOT Spec.
|
Precast concrete box culvert
|
RCB
|
ASTM-789
|
Pipe Diameter
(inches)
|
Minimum Inside Diameter of Manhole
(feet)
|
---|---|
15 to 24
|
4
|
27 to 42
|
5
|
48
|
6
|
24 to 66
|
8
|
> 66
|
Special junction structure
|
Pipe Diameter
(inches)
|
Minimum Inside Width of Junction Box
|
---|---|
15 to 30
|
4 feet
|
36 to 42
|
5 feet
|
48
|
5 feet 6 inches
|
54
|
6 feet
|
60
|
6 feet 6 inches
|
66
|
7 feet
|
72
|
7 feet 6 inches
|
>72
|
Special approval required
|
Utility
|
Minimum Distance From Outside Edge Of Pipe To Centerline
(feet)
|
---|---|
Storm sewer
|
Inside diameter of largest pipe*
|
Sanitary sewer
|
5
|
Water, gas, electric line, or other utility
|
5
|
*
|
Or greater, if needed to allow proper placement and alignment
of flared end sections
|
A)
|
Total drainage area less than one (1) square mile: 25-year (4%
AEP) storm.
|
B)
|
Total drainage area one (1) square mile or more: 100-year (1%
AEP) storm.
|
C)
|
In cases where no overland relief area is provided for the difference
between the 25- and 100-year storm, storm sewers shall be designed
to convey the 100-year storm.
|
where:
| ||
Q
|
=
|
rate of flow, cubic feet per second
|
n
|
=
|
Manning's roughness coefficient
|
A
|
=
|
cross sectional area of flow, square feet
|
P
|
=
|
wetted perimeter, feet
|
R
|
=
|
hydraulic radius = A/P, feet
|
S
|
=
|
slope
|
Material
|
n Value
|
---|---|
Reinforced concrete culvert (pipe or box)
|
0.013
|
CMP 2-2/3 in x 1/2 in. annular corrugations
|
0.021(1)
|
CMP 3 in x 1 in. annular corrugations
|
0.027(1)
|
Structural plate CMP 6 in. x 2 in. annular corrugations (5 feet
dia.)
|
0.033
|
Polypropylene pipe
|
0.012
|
PVC (private development only)
|
0.012
|
HDPE (private development only)
|
0.012
|
(1)
|
Manning's n for helically corrugated CMP may be less in
certain conditions.
|
where:
|
Contraction coefficient, Kc = 0.5 (for
square edge conditions)
|
where:
|
Expansion coefficient, Ke = 1.0
|
Type of Entrance
|
Entrance Coefficient, Ke
|
---|---|
1. Pipe entrance with headwall
| |
Grooved edge
|
0.20
|
Rounded edge (0.15D radius)
|
0.15
|
Rounded edge (0.25D radius)
|
0.10
|
Square edge (cut concrete and CMP)
|
0.40
|
2. Pipe entrance with headwall and 45° wingwall
| |
Grooved edge
|
0.20
|
Square edge
|
0.35
|
3. Headwall with parallel wingwall spaced 1.25D apart
| |
Grooved edge
|
0.30
|
Square edge
|
0.40
|
4. Projecting entrance
| |
Grooved edge
|
0.25
|
Square edge
|
0.50
|
Sharp edge, thin wall
|
0.90
|
where:
| ||
Kc
|
=
|
contraction loss coefficient
|
V1
|
=
|
velocity upstream of the expansion (ft/s)
|
V2
|
=
|
velocity downstream of the expansion (ft/s)
|
In general, Kc = 0.5Ke.
|
D2/D1
|
Angle of Cone
| ||||||
---|---|---|---|---|---|---|---|
10°
|
20°
|
45°
|
60°
|
90°
|
120°
|
180°
| |
1.5
|
0.17
|
0.40
|
1.06
|
1.21
|
1.14
|
1.07
|
1.00
|
3
|
0.17
|
0.14
|
0.86
|
1.02
|
1.06
|
1.04
|
1.00
|
Table 13: Storm Recurrence Intervals
| ||
---|---|---|
Criterion
|
Criterion Value
|
Design Storm Recurrence Interval
|
Drainage area above culvert
|
Less than 1 square mile
|
25-year
|
1 square mile or greater
|
100-year
| |
Roadway classification
|
Smaller than secondary arterial
|
25-year
|
Secondary arterial or greater
|
100-year
|
NOTES:
| ||||
1.
|
For all roadways, culvert sizing should accommodate the design
storm and also allow for one (1) foot of freeboard below the sag in
the roadway or below the low chord of a bridge structure, whichever
results in a lower water surface elevation (W.S.E.).
| |||
2.
|
For safety purposes, roadway culverts sized for the 25-year
event should also be checked for the 100-year flow. If, during the
100-year event, flow overtops the roadway, then the velocity and depth
must meet the following criterion:
| |||
a.
|
V * D is less than or equal to 4, where:
| |||
i.
|
V = Velocity of flow in water overtopping roadway (ft/sec)
| |||
ii.
|
D = Depth of flow overtopping roadway (ft)
| |||
b.
|
If V * D is greater than 4, then the culvert capacity must be
increased until V * D < 4 for the 100-year event.
|
Mannings Equation:
| ||
where:
| ||
Q
|
=
|
flow rate or discharge (cfs)
|
n
|
=
|
Manning roughness coefficient (unitless)
|
A
|
=
|
cross sectional area of flow (sq ft)
|
R
|
=
|
hydraulic radius (ft)
|
S
|
=
|
longitudinal slope (unitless)
|
Continuity Equation:
| ||
Q = v1A1 = v2A2
| ||
where:
| ||
Q
|
=
|
flow rate or discharge (cfs)
|
v
|
=
|
velocity (ft/sec)
|
A
|
=
|
cross sectional area of flow (sq ft)
|
Energy Equation:
| ||
where:
| ||
v
|
=
|
velocity (ft/sec)
|
g
|
=
|
gravitational acceleration (32.2 ft/sec2)
|
p
|
=
|
pressure (lb./ft2)
|
y
|
=
|
specific weight of water (62.4 lb./ft3)
|
(Note: p/y = pressure head or depth of flow)
| ||
z
|
=
|
height above datum (ft)
|
•
|
Depth of headwater
|
•
|
Inlet edge configuration
|
•
|
Cross sectional area
|
•
|
Barrel shape (i.e., circular, elliptical, rectangular, etc.)
|
With inlet control, the culvert barrel usually flows only partially
full. Inlets control for culverts occurs under 2 conditions:
| |
1.
|
Unsubmerged Inlet - The headwater depth is not sufficient to
submerge the top of the culvert, and the culvert invert slope is supercritical.
This is the less common condition of inlet control.
|
2.
|
Submerged Inlet - The headwater submerges the top of the culvert,
and the pipe does not flow fully. This is the more common condition
of inlet control.
|
•
|
Depth of headwater
|
•
|
Inlet edge configuration
|
•
|
Cross sectional area
|
•
|
Culvert shape
|
•
|
Barrel slope
|
•
|
Barrel length
|
•
|
Barrel roughness
|
•
|
Depth of tailwater
|
Outlet control for culverts occurs under 2 conditions:
| |
1.
|
Partially Full Conduit - The headwater depth is insufficient
to submerge the top of the culvert, and the culvert slope is subcritical,
resulting in the culvert flowing partially full. This is the less
common condition of outlet control.
|
2.
|
Full Conduit - The culvert flows full along its length. This
is the more common condition of outlet control.
|
where:
| ||
Q
|
=
|
flow rate or discharge (cfs)
|
C
|
=
|
contraction coefficient (dimensionless)
|
A
|
=
|
cross sectional area (ft2)
|
g
|
=
|
acceleration due to gravity, 32.2 (ft/sec2)
|
H
|
=
|
total head (ft)
|
He
|
=
|
head loss at entrance (ft)
|
Ke
|
=
|
entrance loss coefficient (see table below)
|
v
|
=
|
average velocity (ft/sec)
|
Entrance Coefficient
| ||
---|---|---|
Type of Entrance
|
Entrance Coefficient, Ke
| |
1. Pipe entrance with headwall
| ||
Grooved edge
|
0.20
| |
Rounded edge (0.15D radius)
|
0.15
| |
Rounded edge (0.25D radius)
|
0.10
| |
Square edge (cut concrete and CMP)
|
0.40
| |
2. Pipe entrance with headwall and 45° wingwall
| ||
Grooved edge
|
0.20
| |
Square edge
|
0.35
| |
3. Headwall with parallel wingwall spaced 1.25D apart
| ||
Grooved edge
|
0.30
| |
Square edge
|
0.40
| |
4. Projecting entrance
| ||
Grooved edge
|
0.25
| |
Square edge
|
0.50
| |
Sharp edge, thin wall
|
0.90
|
where:
| ||
Hf
|
=
|
frictional head loss in culvert barrel (ft)
|
n
|
=
|
Manning roughness coefficient (unitless)
|
L
|
=
|
culvert length (ft)
|
R
|
=
|
hydraulic radius (=A/p) (ft)
|
A
|
=
|
cross sectional area of culvert barrel (ft2)
|
p
|
=
|
wetted perimeter of barrel (ft)
|
v
|
=
|
average velocity (ft)
|
g
|
=
|
acceleration due to gravity, 32.2 (ft/sec2)
|
•
|
Select a culvert shape, type, and size with a particular inlet
end treatment.
|
•
|
Determine a headwater depth for both inlet and outlet control
given the design discharge, the grade and length of culvert, and the
depth of water at the outlet (tailwater).
|
•
|
Compare the largest depth of headwater (as determined from either
inlet or outlet control) to the design criteria. If the design criteria
are not met, continue trying other culverts.
|
•
|
Estimate the culvert outlet velocity. Determine if there is
a need for any special features such as energy dissipators, riprap
protection, fish passage, trash/safety rack, etc.
|
The hydraulic design of culverts can be achieved using several
different methods, including the following described in this Subsection:
capacity charts, nomographs, and computer applications.
|
•
|
List design data: Q (cfs), L (ft), invert elevations in and
out (ft), allowable Hw (ft), mean and maximum
flood velocities in natural stream (ft/sec), culvert type and entrance
type for first (1st) selection.
| |
•
|
Determine a trial size by assuming a maximum average velocity
based on channel considerations to compute the area, A = Q/V.
| |
•
|
Find Hw for trial size culvert for inlet
control and outlet control. For inlet control, connect a straight
line through D and Q to scale one (1) of the Hw/D scales and project horizontally to the proper scale, compute Hw, and, if too large or too small, try another size before
computing Hw for outlet control.
| |
•
|
Next, compute the Hw for outlet control.
Enter the graph with the length, the entrance coefficient for the
entrance type, and the trial size. Connect the length scale and the
culvert size scale with a straight line, pivot on the turning line,
and draw a straight line from the design discharge on the discharge
scale through the turning point to the head scale (head loss, H).
Compute Hw from the equation:
| |
Hw = H + ho -
Ls
| ||
where:
| ||
Hw
|
=
|
headwater depth (ft)
|
H
|
=
|
head loss (ft)
|
ho
|
=
|
tailwater depth or elevation at the outlet of a depth equivalent
to the location of the hydraulic grade line (ft)
|
L
|
=
|
length of culvert (ft)
|
s
|
=
|
slope of culvert (ft/ft)
|
For Tw greater than or equal to the top
of the culvert: ho = Tw
| ||
ho
|
=
|
critical depth (ft)
|
dc
|
=
|
critical depth (ft)
|
D
|
=
|
culvert diameter (ft)
|
Tw
|
=
|
tailwater depth (ft)
|
If Tw is less than dc, the nomographs cannot be used, see Hydraulic Design of Highway
Culverts (FHWA 2005a) for critical depth charts.
|
Table 14: Entrance Coefficients.
| ||
---|---|---|
Type of Entrance
|
Entrance Coefficient, Ke
| |
1. Pipe entrance with headwall
| ||
Grooved edge
|
0.20
| |
Rounded edge (0.15D radius)
|
0.15
| |
Rounded edge (0.25D radius)
|
0.10
| |
Square edge (cut concrete and CMP)
|
0.40
| |
2. Pipe entrance with headwall and 45° wingwall
| ||
Grooved edge
|
0.20
| |
Square edge
|
0.35
| |
3. Headwall with parallel wingwall spaced 1.25D apart
| ||
Grooved edge
|
0.30
| |
Square edge
|
0.40
| |
4. Projecting entrance
| ||
Grooved edge
|
0.25
| |
Square edge
|
0.50
| |
Sharp edge, thin wall
|
0.90
|
Circular culvert outlets figure parameters:
| ||
•
|
Q = design discharge (cfs)
| |
•
|
Dc = diameter of circular culvert (ft)
| |
•
|
Yt = tailwater depth (ft)
| |
Circular culvert outlets figure notes:
| ||
•
|
Valid for Froude parameter for circular culvert (Q/Dc2.5) = 6 or less.
| |
•
|
In cases where Yt is unknown or a hydraulic
jump is suspected downstream of the outlet, use Yt/Dc = 0.40.
| |
•
|
The rock size requirements shown on the figure above were determined
assuming that the flow in the circular culvert is not supercritical.
In cases where the flow is supercritical, calculate Da using the equation below and substitute Da for Dc:
| |
where:
| ||
•
|
the maximum value of Da shall not exceed
Dc
| |
•
|
Da = parameter to use in place of Dc when flow is supercritical
| |
•
|
Dc = diameter of circular culvert (ft)
| |
•
|
Yn = normal depth of supercritical flow
in the culvert
|
Rectangular culvert outlets figure parameters:
| ||
•
|
Q = design discharge (cfs)
| |
•
|
W = width of rectangular conduit (ft)
| |
•
|
H = height of rectangular conduit (ft)
| |
Rectangular culvert outlets figure notes:
| ||
•
|
Valid for Froude parameter for rectangular culvert (Q/WH1.5) = 8.0 or less.
| |
•
|
In cases where Yt is unknown or a hydraulic
jump is suspected downstream of the outlet, use Yt/H = 0.40.
| |
•
|
The rock size requirements shown on the figure above were determined
assuming that the flow in the rectangular culvert is not supercritical.
In cases where the flow is supercritical, calculate Ha using the equation below and substitute Ha for H:
| |
where:
| ||
•
|
the maximum value of Ha shall not exceed
H
| |
•
|
Ha = parameter to use in place of H when
flow is supercritical
| |
•
|
H = height of rectangular culvert (ft)
| |
•
|
Yn = normal depth of supercritical flow
in the culvert
|
Lp = length of protection (ft)
|
W = width of the conduit in (ft) (use diameter for circular
conduits)
|
Yt = tailwater depth (ft)
|
Ɵ = the expansion angle of the culvert flow
|
Q = design discharge (cfs)
|
V = the allowable non-eroding velocity in the downstream channel
(ft/sec)
|
At = required area of flow at allowable
velocity (ft2)
|
•
|
Circular culverts
| |
○
|
Lp should not be less than 3 Dc.
| |
○
|
Lp should not be greater than 10 Dc whenever the Froude parameter (Q/Dc2.5) is less than 6.0.
| |
○
|
If the Froude parameter is greater than 6.0, increase the maximum
Lp required by 1/4 Dc for each whole number by which the Froude parameter is greater than
6.0.
| |
•
|
Rectangular culverts
| |
○
|
Lp should not be less than 3H.
| |
○
|
Lp should not be greater than 10H whenever
the Froude parameter (Q/WH1.5) is less
than 8.0.
| |
○
|
If the Froude parameter is greater than 8.0, increase the maximum
Lp required by 1/4 H for each whole number
by which the Froude parameter is greater than 8.0.
|
where:
|
D = hydraulic depth (feet) = A/T
|
A = cross sectional area of design flow (square feet)
|
V = average channel velocity (feet/second)
|
g = acceleration due to gravity (32.2 ft/s2)
|
T = top width of flow (feet)
|
For supercritical flow, Fr > 1
|
For subcritical flow, Fr < 1
|
For critical flow, Fr = 1
|
•
|
Steady flow - conditions at any point in a stream remain constant
with respect to time (Daugherty and Franzini 1977).
|
•
|
Unsteady flow - flow conditions (e.g., depth) vary with time.
|
•
|
Uniform flow - the magnitude and direction of velocity in a
stream are the same at all points in the stream at a given time (Daugherty
and Franzini 1977). If a channel is uniform and resistance and gravity
forces are in exact balance, the water surface will be parallel to
the bottom of the channel for uniform flow.
|
•
|
Varied flow - discharge, depth, or other characteristics of
the flow change along the course of the stream. For a steady flow
condition, flow is termed rapidly varied if these characteristics
change over a short distance. If characteristics change over a longer
stretch of the channel for steady flow conditions, flow is termed
gradually varied.
|
For the purposes of open channel design, flow is usually considered
steady and uniform. For a channel with a given roughness, discharge,
and slope, there is only one (1) possible depth for maintaining a
uniform flow. This depth is the normal depth. When roughness, depth,
and slope are known at a channel section, there can only be one (1)
discharge for maintaining a uniform flow through this Subsection.
This discharge is the normal discharge.
|
Average Roughness Coefficients
| |||
---|---|---|---|
Channel Lining
|
Minimum
|
Average
|
Maximum
|
Earthen
|
0.020
|
0.025
|
0.300
|
Mowed grass
|
0.025
|
0.030
|
0.035
|
Grass - not mowed
|
0.030
|
0.035
|
0.040
|
Grass with brush/trees
|
0.040
|
0.050
|
0.060
|
Cobble bottom, grass/root side
|
0.030
|
0.040
|
0.050
|
Concrete - smooth
|
0.012
|
0.013
|
0.015
|
Concrete - rough
|
0.015
|
0.017
|
0.020
|
Riprap d50 6 inches
|
0.032
|
0.035
|
0.038
|
Riprap d50 9 inches
|
0.035
|
0.038
|
0.040
|
Riprap d50 12 inches
|
0.380
|
0.040
|
0.042
|
Riprap d50 18 inches
|
0.040
|
0.042
|
0.044
|
Riprap d50 24 inches
|
0.042
|
0.044
|
0.047
|
Grouted boulders
|
0.025
|
0.032
|
0.400
|
A)
|
Flow velocity is lower.
|
B)
|
Flow depth is greater.
|
C)
|
Hydraulic losses are lower.
|
D)
|
Erosive power is less.
|
E)
|
Behavior is easily described by relatively simple mathematical
equations.
|
F)
|
Surface waves can propagate upstream.
|
A)
|
Flow velocity is higher.
|
B)
|
Flow depth is less.
|
C)
|
Hydraulic losses are higher.
|
D)
|
Erosive power is greater.
|
E)
|
Surface waves propagate downstream only.
|
•
|
Vegetated channels where:
| |
○
|
Baseflow exists.
| |
○
|
High peak runoff from developed areas may cause erosion of vegetated
areas.
| |
○
|
1-year flow exceeds 5 cfs (for unreinforced grass only).
| |
•
|
All types of channel linings in locations where erosion could
potentially occur, such as downstream of point discharges.
|
If conditions warrant a low-flow channel, the low-flow channel
shall be designed to convey the 1-year flow under fully developed
watershed conditions. Variations from this design must be justified
by the hydrologic characteristics of the site.
|
Low-flow channel requirements vary by channel type, as listed
below:
| |
•
|
In naturalized channels, low-flow channels typically are unlined.
Depending on the projected stresses, riffle areas may require some
reinforcement.
|
•
|
In engineered grass-lined channels, riprap, boulders, or a soil-riprap
mix for the low-flow channel lining can provide a stable, vegetated
low-flow channel. Soil and riprap should be mixed prior to placement
for these low-flow channels. Vegetated portions of the channel can
remain dry and easy to mow and maintain.
|
•
|
In engineered channels that are not grass-lined, low-flow channels
may consist of riprap, boulders, or concrete, depending on site conditions.
|
Types of trickle channels are as follows:
|
where:
|
τ = unit shear stress (pounds per square foot)
|
λ = unit weight of water = 62.4 pounds per cf
|
s = channel slope (feet per foot)
|
d = distance from the water surface to the channel lining at
the point of interest (feet)
|
Critical Sheer Stress
| |
---|---|
Granular Material
|
Critical Sheer Stress (τC)
(pounds per square foot)
|
Boulders (100 cm) (39 in)
|
20.295
|
Boulders (75 cm) (30 in)
|
15.222
|
Boulders (50 cm) (20 in)
|
10.148
|
Boulders (25.6 cm) (11 in)
|
5.196
|
Riprap (6-8 in)
|
3.132
|
Cobbles (6.4 cm) (2.5 in)
|
1.299
|
Cobbles and shingles
|
1.100
|
Cobbles and shingles, clear water
|
0.910
|
Coarse sand (1 mm) (0.4 in)
|
0.015
|
Coarse gravel, non-colloidal (GW), clear water
|
0.300
|
Coarse gravel, non-colloidal (GW)
|
0.670
|
Gravel (2 cm) (0.78 in)
|
0.406
|
Fine gravel
|
0.320
|
Fine gravel, clear water
|
0.075
|
Fine sand (0.125 mm) (0.005 in)
|
0.002
|
Fine sand (0.125 mm) (SP)(0.005 in)
|
0.002
|
Fine sand (SW), (SP), colloidal
|
0.075
|
Fine sand, colloidal, (SW), (SP), clear water
|
0.027
|
Graded loam to cobbles, non-colloidal (GM)
|
0.660
|
Graded loam to cobbles, non-colloidal (GM), clear water
|
0.380
|
Graded silts to cobbles, colloidal (GC)
|
0.800
|
Graded silts to cobbles, colloidal (GC), clear water
|
0.430
|
Fine-Grained Material
|
Critical Sheer Stress (τC)
(pounds per square foot)
|
---|---|
Resistant cohesive (CL), (CH)
|
1.044
|
Stiff clay, very colloidal (CL)
|
0.460
|
Stiff clay, very colloidal (CL), clear water
|
0.260
|
Moderate cohesive (ML-CL)
|
0.104
|
Ordinary firm loam (CL-ML)
|
0.150
|
Ordinary firm loam (CL-ML), clear water
|
0.075
|
Alluvial silts, colloidal (CL-ML)
|
0.460
|
Alluvial silts, colloidal (CL-ML), clear water
|
0.260
|
Alluvial silts, non-colloidal (ML)
|
0.150
|
Alluvial silts, non-colloidal (ML), clear water
|
0.048
|
Sandy loam, non-colloidal (ML)
|
0.075
|
Sandy loam, non-colloidal (ML), clear water
|
0.037
|
Silt loam, non-colloidal (ML)
|
0.110
|
Silt loam, non-colloidal (ML), clear water
|
0.048
|
Shales and hardpans
|
0.670
|
Other Materials
|
Critical Sheer Stress (τC)
(pounds per square foot)
|
---|---|
Jute net
|
0.460
|
Plant cuttings
|
2.090
|
Well established dense vegetation to the normal low water
|
2.160
|
Geotextile (synthetic)
|
3.010
|
Large Woody Debris
|
3.130
|
NOTES:
| |
For non-cohesive soils, the table values are based on spherical
particles and Shields Equation (see Equation OC-8).
| |
For cohesive soils, the values are based on limited testing
as reported in Chow (1988) and U.S. Department of Agriculture Agricultural
Research Service (USDA ARS) (2004).
| |
Material type abbreviations:
| |
Agriculture Agricultural Research Service (USDA
ARS) (2004)
| |
Material type abbreviations:
| |
GW - Gravel, well graded
|
GC = Clayey gravel
|
SP - Sand, poorly graded
|
CL - Clay
|
SW - Sand, well graded
|
CH - Clay, high plasticity
|
GM - Silty gravel
|
ML - Silt
|
Channel Type
|
Minimum Velocity
(2-year check)
(ft/s)
|
Maximum Velocity
(25-year check)
(ft/s)
|
---|---|---|
Grass, seed, and mulch
|
2
|
4
|
Grass, sod
|
2
|
6
|
Grass, TRM
|
2
|
8
|
Grass, prevegetated TRM
|
2
|
10
|
Manufactured hard lining
|
4
|
12
|
Riprap
|
4
|
12
|
Concrete
|
4
|
18
|
where:
| ||
Δy
|
=
|
difference in water surface elevation between the inner and
outer banks of the channel in the bend (resulting from superelevation)
(ft)
|
V
|
=
|
mean flow velocity (ft/s)
|
T
|
=
|
top width of the channel under design flow conditions (ft)
|
G
|
=
|
gravitational constant = 32.2 ft/s2
|
rc
|
=
|
radius of curvature (ft)
|
1.
|
Construction of such a facility would, due to timing of outflows,
have an adverse effect on downstream properties by increasing peak
rates of runoff, as demonstrated by engineering computations.
|
2.
|
The developer enters into a written agreement with the County
and affected property owners to provide storm drainage improvements
downstream of the development in lieu of constructing on-site detention
facilities as set forth below.
|
3.
|
Due to the small size of the development, it can be demonstrated
that the detention facility would result in no beneficial effect to
downstream properties. Detention basins having a required volume of
five thousand (5,000) cubic feet or less are considered as providing
only marginal benefits.
|
In Cases 1 and 3 above, the City may, in the future, impose
a fee in lieu of detention to be utilized for maintenance or improvement
of storm drainage facilities in the same watershed in which the proposed
development is located.
|
Detention requirements cannot be waived if there are residential
or other structures downstream of the site which have a high flooding
risk.
|
Table 15: Discharge Coefficients for Broad-Crested Weirs
| |||
---|---|---|---|
Depth
(ft.)
|
Coefficient for 6" thick wall
|
Coefficient for 8" thick wall
|
Coefficient for 12" thick wall
|
0.20
|
2.80
|
2.77
|
2.69
|
0.25
|
2.83
|
2.79
|
2.70
|
0.30
|
2.86
|
2.80
|
2.71
|
0.40
|
2.92
|
2.84
|
2.72
|
0.50
|
3.00
|
2.90
|
2.74
|
0.60
|
3.08
|
2.95
|
2.75
|
0.70
|
3.19
|
3.03
|
2.80
|
0.75
|
3.25
|
3.08
|
2.83
|
0.80
|
3.30
|
3.12
|
2.85
|
0.90
|
3.31
|
3.16
|
2.92
|
1.00
|
3.32
|
3.20
|
2.98
|
1.25
|
3.32
|
3.25
|
3.11
|
1.50
|
3.32
|
3.29
|
3.24
|
1.75
|
3.32
|
3.31
|
3.27
|
2.00
|
3.32
|
3.32
|
3.30
|
2.50
|
3.32
|
3.32
|
3.31
|
>2.50
|
3.32
|
3.32
|
3.32
|
Q = 0.86H + (3.65w + 5.82z)H1.5
| ||
where:
| ||
Q
|
=
|
flow rate in cubic feet per second
|
H
|
=
|
upstream head (ponded depth above slot invert plus any velocity
head) in feet
|
H = 6 feet maximum
| ||
w
|
=
|
slot invert width perpendicular to flow, in feet
|
0.333 < w < 2.0 feet
| ||
z
|
=
|
slope of slot sides expressed in terms of z horizontal to 1
vertical
|
0 < z < 0.6
|
•
|
The first one-half (1/2) inch of runoff from the directly connected
impervious area (DCIA) in the development; or
|
•
|
The runoff resulting from total rainfall depth of one (1) inch
in twenty-four (24) hours over the entire development.
|
WQCV = (P)(Rv)(A)
| ||
where:
| ||
WQCV
|
=
|
water quality capture volume (ft3)
|
P
|
=
|
rainfall depth (ft) = 1 inch for new development or 0.5 inch
for redevelopment
|
Rv
|
=
|
volumetric runoff coefficient = 0.5 + 0.009I
|
I
|
=
|
percent impervious cover (in percent, e.g., 80% = 80) (for redevelopment,
use 100%)
|
A
|
=
|
total site area for new development or impervious area for redevelopment
(acres)
|
WQCV = (P)(weighted Rv)(A)
|
where:
|
WQCV = water quality capture volume (ft3)
|
P = rainfall depth (ft) = 1 inch
|
Weight Rv = [(Rv1 * A1) + (Rv2 * A2)+. . . (Rvi * Ai)]/A
|
Rvi = volumetric runoff coefficient for
cover type i
|
Ai = area of cover type i (acres)
|
A = total site area (acres)
|
Table 16: Volumetric Runoff by type of cover
| |||||||
---|---|---|---|---|---|---|---|
Flat roofs and large unpaved parking lots
|
Pitched roofs and large impervious areas (large parking lots)
|
Small impervious areas and narrow streets
|
Urban pervious areas
|
Forest cover
| |||
Hydrologic Soil Group B
|
Hydrologic Soil Groups C and D
|
Hydrologic Soil Group B
|
Hydrologic Soil Group C
|
Hydrologic Soil Group D
| |||
0.84
|
0.97
|
0.7
|
0.11
|
0.21
|
0.03
|
0.4
|
0.5
|
Table 17: Typical Runoff percentages for SCMs
| |
---|---|
SCM
|
Runoff Reduction
|
Vegetated filter strip
| |
Natural area
|
50% to 75%
|
Lawn/landscaping
|
25% to 50%
|
Grass channel (meeting minimum residence time)
|
10% to 20%
|
Pervious pavement
|
45% to 75%
|
Bioretention
|
40% to 80%
|
Extended dry detention basin
|
0% to 15%
|
Extended wet detention basin
|
0%
|
Constructed wetland pond
|
0%
|
Green roof
|
45% to 60%
|
Proprietary SCMs
|
Based on site specific design
|
Rainwater harvesting
|
40%; may be higher based on site specific design
|
Natural area conservation
|
% based on calculated WQCV credit [see Subsection (F)(8)(b)]
|
Natural area restoration
|
% based on calculated WQCV credit [see Subsection (F)(8)(b)]
|
Tree preservation
|
% based on calculated WQCV credit [see Subsection (F)(8)(b)]
|
Tree planting
|
% based on calculated WQCV credit [see Subsection (F)(8)(b)]
|
Table 18: Effectiveness of SCMs
| ||||
---|---|---|---|---|
SCM
|
Sediment/Solids
|
Nutrients
|
Total Metals
|
Bacteria
|
Vegetated filter strip
|
Good
|
Moderate
|
Good
|
Poor
|
Grass channel
|
Good
|
Moderate
|
Good
|
Poor
|
Pervious pavement
|
Very good
|
Good
|
Good
|
Unknown
|
Bioretention
|
Very good
|
Moderate
|
Good
|
Moderate
|
Extended detention basin
|
Good
|
Moderate
|
Moderate
|
Poor
|
Retention pond
|
Very good
|
Moderate
|
Moderate
|
Moderate
|
Constructed wetland pond
|
Very good
|
Moderate
|
Good
|
Poor
|
Green roof
|
Unknown
|
Unknown
|
Unknown
|
Unknown
|
Proprietary SCMs
|
Variable
|
Variable
|
Variable
|
Variable
|
Table 19: Key processes by SCM
| ||||||||
---|---|---|---|---|---|---|---|---|
SCM
|
Hydrologic Processes
|
Treatment Processes
| ||||||
Peak
|
Volume
|
Physical
|
Chemical
|
Biological
| ||||
Flow Attenuation
|
Infiltration
|
Evapo-transpiration
|
Sedimentation
|
Filtration
|
Straining
|
Adsorption/Absorption
|
Biological Uptake
| |
Grass channel
|
I
|
S
|
I
|
S
|
S
|
P
|
S
|
S
|
Vegetated filter strip
|
I
|
S
|
I
|
S
|
S
|
P
|
S
|
S
|
Green roof
|
P
|
S
|
P
|
N/A
|
P
|
N/A
|
I
|
P
|
Pervious pavement
|
P
|
P
|
N/A
|
S
|
P
|
N/A
|
N/A
|
N/A
|
Bioretention
|
P
|
P1
|
S
|
P
|
P
|
S
|
S2
|
P
|
Extended detention basin
|
P
|
I
|
I
|
P
|
N/A
|
S
|
S
|
I
|
Retention pond
|
P
|
I
|
P
|
P
|
S
|
S
|
P
|
P
|
NOTES:
| ||||||||
P = Primary; S = Secondary; I = Incidental; N/A = Not Applicable
| ||||||||
1
|
Depending on presence and design of an underdrain
| |||||||
2
|
Depending on soil media
|
A)
|
Location and limits of the area of the sinkhole depression as
determined by field surveys or other reliable and accurate methods
(location of sinkholes based solely upon USGS 7-1/2 Minute Series
Quadrangle Maps will not be considered sufficient unless field verified).
|
B)
|
Location and elevation of the sinkhole eye or low point.
|
C)
|
Topographic contours at maximum intervals of one (1) foot (larger
contour intervals may be used if deemed sufficiently accurate), and
spot elevations sufficient to determine the low point on the sinkhole
rim and the profile of the potential overflow area.
|
D)
|
Minimum elevation at which floodwaters can gain entry to any
existing structures located within or on the sinkhole rim.
|
E)
|
Elevation of any roadway located within or adjacent to the sinkhole.
|
A)
|
The post-development sinkhole flooding area shall be contained
within a drainage easement restricting structures; and
| ||||
B)
|
Any flow leaving the proposed development shall be contained
within a drainage easement until it reaches the receiving sinkhole.
This easement shall contain the runoff from the critical storm event
with an annual exceedance probability of one percent (1%). The critical
storm event is defined as the storm event with an annual exceedance
probability of one percent (1%) that produces the highest peak flow,
regardless of duration.
| ||||
C)
|
Where it is not possible for a drainage easement to contain
the sinkhole flooding area, it must be shown that:
| ||||
1)
|
The proposed development will not cause a rise in the flood
elevation within a reasonable tolerance [one-tenth (0.1) ft]; or
| ||||
2)
|
The impacts of both the proposed development and any future
developments in the watershed will not impact any existing structures
or improvements and will not increase the flooding elevation by more
than one (1) foot. The increase in the flooding elevation shall be
distributed proportionately based on watershed size, e.g., if the
development is twenty percent (20%) of the watershed then they can
increase the flooding elevation by twenty percent (20%) of one (1)
foot or two tenth (0.2) feet. This can be determined by calculating
the runoff rates and volumes from the entire watershed, assuming fully
developed conditions based on current zoning and potential future
land use and calculating the resulting water surface elevation (WSE).
| ||||
3)
|
The following alternatives, listed in order by preference, may be used individually or in combination, if needed, to comply with Subsection (F)(1)(c)(2)(b)(iii)(ii)(A) or (B):
| ||||
1.
|
Stormwater control measures (SCMs) that reduce runoff volume
such as bioretention, pervious pavements, etc. Small-scale, distributed
practices are preferred over centralized, large-scale practices in
karst areas.
| ||||
2.
|
Detention Storage. Since traditional detention storage has little
to no impact on the volume of runoff from a site, it is seldom the
solution for impacting the WSE of an adjacent sinkhole. However, in
the case where detention is warranted, the following conditions must
be met:
| ||||
a.
|
It must be shown that the peak basin outflow is less than the
existing peak rate of runoff from the site and less than the discharge
rate of the sinkhole. (See below.)
| ||||
b.
|
Compensatory Excavation Within The Sinkhole Flood Area. Karst
features can have a significant, and often unknown, impact on subsurface
hydrology and groundwater quality. Therefore, compensatory excavation
within the sinkhole flooding area will generally not be permitted.
In rare cases, where there are exceptional conditions, alternative
measures, such as compensatory excavation, may be permitted with the
approval of the City Engineer and Building Inspector, provided the
following conditions are satisfied:
| ||||
i.
|
Such alternative creates no adverse impact on groundwater, sinkhole
stability, flood conditions, or other properties. If, at the City's
discretion, excavation to the sinkhole has the potential to cause
an adverse impact, the City may deny the request to excavate within
the sinkhole.
| ||||
ii.
|
A comprehensive erosion and sediment control plan is developed
to keep sediment confined to the excavation site. This plan would
likely include additional control measures and inspection beyond the
scope of a traditional plan.
|
A)
|
A minimum of five (5) feet above the flooding elevation where
there is no overflow from the sinkhole from the critical flood event;
or
|
B)
|
One (1) foot above the flooding elevation determined by the
overflow elevation calculated for the critical flood event, whenever
the difference between the topographic rim and flooding elevation
is less than five (5) feet.
|
A)
|
Areas with one hundred (100) feet of private water supply wells.
|
B)
|
Areas with three hundred (300) feet of public water supply wells.
|
C)
|
Areas within five hundred (500) feet of springs used for public
or private water supply.
|
D)
|
Areas within one thousand (1,000) feet of caves providing habitat
to rare or endangered species such as the Ozark cavefish.
|
The distances listed above may be extended in any instance where
the recharge area for a well, spring, or cave has been determined
by studies by a qualified engineer or geologist.
|
A)
|
Residential developments on sewer, provided directly connected
impervious areas discharging to the sinkhole is less than one (1)
acre.
|
B)
|
Parks and recreation areas.
|
C)
|
Low-density commercial and office developments provided directly
connected impervious areas discharging to the sinkhole is less than
one (1) acre.
|
D)
|
Discharge from land disturbance areas less than one (1) acre.
|
A)
|
Concentrated discharge from streets, parking lots, roofs and
other directly connected impervious areas having an area greater than
one (1) acre and less than five (5) acres.
|
B)
|
Multi-family residential developments and higher intensity office
developments provided the directly connected impervious areas discharging
to the sinkhole is less than five (5) acres.
|
C)
|
Discharge from land disturbance areas greater than one (1) acre
and less than five (5) acres.
|
A)
|
Collector streets in industrial and manufacturing zones, all
arterial streets, and highways.
|
B)
|
Railroads.
|
C)
|
Concentrated discharge from streets, parking lots, roofs and
other directly connected impervious areas having an area greater than
five (5) acres.
|
D)
|
Commercial, industrial, and manufacturing areas in Zoning Districts
"C-2," and M-1."
|
E)
|
Individual wastewater treatment systems.
|
F)
|
Commercial feedlots or poultry operations.
|
G)
|
Discharge from graded areas greater than five (5) acres.
|
A)
|
Sediment And Erosion Control.
| |
1)
|
Existing ground cover shall not be removed within twenty-five
(25) feet of the sinkhole flooding area, and a silt barrier shall
be erected and maintained around the outer perimeter of the buffer
area. Vegetative cover must be of sufficient quality and density to
provide desired filtration.
| |
2)
|
A ditch check(s) will be required at each point where concentrated
flow is discharged into the sinkhole.
| |
B)
|
Permanent Management Measures.
| |
1)
|
Where flow into the sinkhole occurs as sheet flow, water quality
requirements can be satisfied by maintaining a permanent vegetative
buffer area with a minimum width of twenty-five (25) feet around the
sinkhole flooding area.
| |
2)
|
Concentrated flows may be discharged into the sinkhole through
grassed swales and channels designed for non-erosive velocities. Temporary
erosion control measures such as sodding, or erosion control blankets
shall be provided.
|
A)
|
Sediment And Erosion Control. A sediment basin will be required
at each point where concentrated flows are discharged into the sinkhole.
|
B)
|
Permanent Management Measures. Extended wet or dry detention
basins shall be provided at all points of concentrated discharge.
Other Best Management Practices may be specified, provided that their
performance is equal to that of extended detention basins.
|
A)
|
Sediment And Erosion Control. A sediment basin will be required
at each point where concentrated flows are discharged into the sinkhole.
Specific limits may be placed on the area which can be graded at any
one (1) time and on the length of time allowed from initial disturbance
to stabilization.
|
B)
|
Permanent Management Measures. Runoff from all areas must pass
through extended wet or dry detention basins. Other Best Management
Measures may be specified, provided that their performance is equal
to that of extended detention basins.
|
Table 20: Minimum Easement Widths
| |
---|---|
Inside Horizontal Dimension
(inches)
|
Minimum Easement Width
(feet)
|
15 to 48
|
15
|
54 to 72
|
17.5
|
84 and 96
|
20
|
Over 96
|
Approval required
|
A)
|
Lot grading done as a part of an overall subdivision plan to
make lots buildable or prepare lots for sale is not exempt.
|
Slope of Cleared Area
|
Maximum width upslope of dike/silt fence
(feet)
|
---|---|
2% to 5%
|
100
|
5% to 20%
|
50
|
> 20%
|
25
|
L = KA
|
where:
|
L = Length of vertical curve
|
A = Algebraic difference in grades
|
K = Determined by following table:
|
Table of "K" Values
| ||
---|---|---|
Type
|
Crest
|
Sag
|
Arterial
|
61
|
79
|
Collector
|
44
|
64
|
Local non-residential
|
19
|
37
|
Local residential
|
12
|
26
|
Type
|
Minimum centerline radii
(R)
|
Maximum super elevation
(E)
|
---|---|---|
Arterial
|
R = 600 feet
|
E=0.04
|
Collector
|
R = 400 feet
|
E=0.03
|
Local non-residential
|
R = 300 feet
|
E=0.02
|
Local residential
|
R = 175 feet
|
E=0.02
|
*
|
Minimum length of super elevation runout = 100 feet
|
Type
|
Intersecting Residential Local
(feet)
|
Street Non-Residential Local and Collector
(feet)
|
---|---|---|
Arterial
|
30
|
50
|
Collector
|
20
|
30
|
Local residential
|
15
|
20
|
Local non-residential
|
20
|
30
|
Type
|
Distance
(feet)
|
---|---|
Arterial
|
325
|
Collector
|
250
|
Local non-residential
|
200
|
Local residential
|
150
|
Type
|
Distance
(feet)
|
---|---|
Arterial
|
500
|
Collector
|
450
|
Local non-residential
|
300
|
Local residential
|
250
|
Street Right-Of-Way And Construction Requirements
| ||||||
---|---|---|---|---|---|---|
Boulevard
(feet)
|
Primary Arterial
(feet)
|
Secondary Arterial
(feet)
|
Collector
(feet)
|
Non-Residential Local
(feet)
|
Residential Local
(feet)
| |
Right-of-way - normal
|
120
|
110
|
80
|
65
|
60
|
50
|
Pavement width - normal (feet)
|
68
|
68
|
46
|
35
|
35
|
32
|
Sidewalk requirements**
|
As needed
|
Both sides
|
Both sides
|
Both sides
|
1 side
|
1 side
|
Minimum centerline radius
|
To be designed
|
To be designed
|
600
|
400
|
300
|
175
|
*
|
Widening flared to the leaving side of opposite approaches.
| |||||
**
|
Except in certain zoning districts, see Subdivision Regulations.
|
Right-Of-Way Triangle Requirements
| |||||||
---|---|---|---|---|---|---|---|
Intersection Of/With
|
Expressway
|
Primary Arterial
|
Secondary Arterial
|
Collector
|
Non-Residential Local
|
Residential Local
|
Marginal Access
|
Expressway
|
A
|
A
|
A
|
B
|
B
|
B
|
B
|
Primary arterial
|
A
|
A
|
A
|
B
|
B
|
C
|
C
|
Secondary arterial
|
A
|
A
|
B
|
B
|
C
|
D
|
D
|
Collector
|
B
|
B
|
B
|
C
|
C
|
D
|
D
|
Non-residential local
|
B
|
B
|
C
|
C
|
C
|
D
|
E
|
Residential
|
B
|
C
|
D
|
D
|
D
|
E
|
E
|
Marginal access
|
B
|
C
|
D
|
D
|
E
|
E
|
E
|
KEY:
| |||||||
A: 100' X 100' ROW triangle w/separate right turn
lanes
| |||||||
B: 30' X 30' ROW triangle w/50' corner radii
| |||||||
C: 10' X 10' ROW triangle w/30' corner radii
(or 15' ROW radius)
| |||||||
D: 10' X 10' ROW triangle w/20' corner radii
(or 15' ROW radius)
| |||||||
E: No ROW triangle w/15' corner radii
|
Study Tiers Thresholds Transportation Impact Study:
| |
•
|
Preliminary transportation assessment (Optional).
|
•
|
Transportation impact study: Level I - under 100 peak hour trips,
or fewer than 50 new dwelling units.
|
•
|
Transportation impact study: Level II - 100 to 499 peak hour
trips.
|
•
|
Transportation impact study: Level III - 500 to 999 peak hour
trips, or change in access to primary arterial or higher-class road
(<1,000 peak hour)
|
•
|
Transportation impact study: Level IV - 1,000 or more peak hour
trips.
|
_____
|
Sidewalks shown in plan and profile on at least one (1) side
of residential streets and on both sides of collector and arterial
streets (Check Subdivision Regulations for exceptions).
|
_____
|
Sufficient field data is shown for unimproved streets to determine
probable future grade of street curb and sidewalks are designed accordingly.
|
_____
|
Typical cross sections shown with plan and profile.
|
_____
|
Outside edge of sidewalk is placed one (1) foot inside of right-of-way
line.
|
_____
|
1/2-inch expansion joints are indicated on the plans.
|
_____
|
Sidewalk minimum width - sixty (60) inches minimum thickness
of four (4) inch [or six (6) inch when sidewalk crosses a residential
driveway or eight (8) inch when sidewalk crosses a commercial driveway
or alleys] placed on four (4) inches of compacted base stone extending
six (6) inches beyond the edges of the walk.
|
_____
|
Sidewalk cross slope not greater than 1:50 [two percent (2%)].
|
_____
|
All ramp slopes are a maximum of 1:12.
|
_____
|
Maximum rise for any length of run is thirty (30) inches.
|
_____
|
Level landing areas provided at top and bottom of each run.
|
_____
|
Detectable warning system indicated on all curb ramps.
|
_____
|
Curb ramps provided wherever sidewalk crosses a curb.
|
_____
|
Minimum width of curb ramp is sixty (60) inches.
|
_____
|
Accessible crossing area indicated on any raised island crossing.
|
_____
|
Hand railing indicated where elevation change between sidewalk
and adjacent grade is thirty (30) inches or more.
|
_____
|
Drainage from properties adjacent to the sidewalk does not discharge
a concentrated flow across the surface of the sidewalk and the grades
of the sidewalk ramps do not allow areas of surface ponding.
|
_____
|
Curb and gutter is provided for on all improved streets.
|
_____
|
Street profile shows centerline elevations.
|
_____
|
Curb cross section shows curb height and width six (6) inches.
|
_____
|
Gutter thickness is shown as six (6) inches for local residential
streets.
|
_____
|
Gutter thickness is shown as eight (8) inches for non-residential
local streets and collector residential streets.
|
_____
|
Curb and gutter are constructed on four (4) inches Type I rolled
stone base extending a minimum of one (1) foot behind the curb.
|
_____
|
Total curb and gutter width are shown as two (2) feet six (6)
inches.
|
_____
|
Gutter cross slope is one (1) inch/ft (except at ramp areas).
|
_____
|
One-half (1/2) inch expansion joints indicated at all driveways
and at intervals of not more than (200) two hundred feet.
|
Table for determining the driveway grade for various street
classifications.
| |||
---|---|---|---|
Street Classification
|
Approach Grade
|
Maximum Grade Back of Sidewalk
|
Slope 10 feet of R/W
|
Major arterial
|
2% to 4%
|
4%
|
-2% to 6%
|
Secondary arterial
|
2% to 5%
|
5%
|
-3% to 7%
|
Collector
|
2% to 6%
|
6%
|
-4% to 8%
|
Non-resident local
|
2% to 8%
|
8%
|
-6% to 10%
|
Access on Street
|
Expressway
(feet)
|
Primary Arterial
(feet)
|
Secondary Arterial
(feet)
|
Collector
(feet)
|
Residential Local
(feet)
|
Driveway
(feet)
| |
---|---|---|---|---|---|---|---|
Expressway
|
Approach
|
Not permitted
|
Not permitted
|
Not permitted
|
Not permitted
|
Not permitted
|
Not permitted
|
Exit
|
Not permitted
|
Not permitted
|
Not permitted
|
Not permitted
|
Not permitted
|
Not permitted
| |
Primary arterial
|
Approach
|
350*
|
300*
|
250*
|
200
|
200
|
440
|
Exit
|
250
|
200
|
200
|
200
|
200
|
200
| |
Secondary arterial
|
Approach
|
300*
|
250*
|
200*
|
150
|
150
|
220
|
Exit
|
150
|
150
|
150
|
150
|
150
|
220
| |
Collector
|
Approach
|
250*
|
200*
|
150*
|
100
|
100
|
100
|
Exit
|
100
|
100
|
100
|
100
|
100
|
100
| |
Residential local
|
Approach
|
150
|
100
|
70
|
50
|
20
|
20
|
Exit
|
70
|
50
|
30
|
30
|
20
|
20
|
*
|
Where a median is on the street, the recommended access restrictions
for the approach side are the same as for the exit side.
|
_____
|
Existing and proposed driveway locations must be indicated on
the plans.
|
_____
|
All driveway dimensions including slope and elevations/contours
are shown.
|
_____
|
Locations of access drives, alleys, and intersections within
two hundred fifty (250) feet of site and across the street are shown.
|
_____
|
Driveway approach is located forty (40) feet beyond the end
of a raised median.
|
_____
|
Show that driveway approaches do not interfere with any existing
parking meters, signs, traffic control devices, plantings, cables,
poles, guys, water mains, gas mains, or other public utilities.
|
_____
|
Show that all landscaping within five (5) feet of the street
does not affect sight distance at the driveway.
|
_____
|
Copy of approved joint driveway approach agreement filed in
the Greene County Recorder's office.
|
_____
|
Width of residential driveway approach at right-of-way line
is not less than twelve (12) feet or more than twenty-two (22) feet.
The width of commercial driveway approach at the right-of-way line
is not less than twenty-six (26) feet or more than forty-five (45)
feet.
|
_____
|
Approach not within four (4) feet of a drop inlet or other drainage
structure or pedestrian ramp.
|
_____
|
Approach grade of driveway does not exceed the maximum allowed
per the street classification.
|
_____
|
Nearest right-of-way of alley: ten (10) feet.
|
_____
|
Nearest edge to property line: five (5) feet.
|
_____
|
If corner lot, nearest edge to nearest right-of-way of intersecting
street: twenty (20) feet.
|
_____
|
Approach skewed to not less than sixty (60°) between street
right-of-way line and the edge of the driveway approach.
|
_____
|
Radius of driveway approach not extended beyond the projection
of the adjacent property line.
|
_____
|
Radius of driveway return is designed for the classification
of street and type of vehicle use.
|
_____
|
Expansion joints indicated.
|
_____
|
Cross slope of sidewalk area within the driveway must not exceed
1:50 [two percent (2%)].
|