[Adopted by the Township Committee of the Township of Holland 7-6-2010 by Ord. No. 2010-12A. Amendments noted where applicable.]
[Amended 2-15-2011 by Ord. No. 2011-2; 3-4-2014 by Ord. No. 2014-3; 12-6-2016 by Ord. No. 2016-6; 8-21-2018 by Ord. No. 2018-09; 11-7-2019 by Ord. No. 2019-20; 6-15-2021 by Ord. No. 2021-10; 12-6-2022 by Ord. No. 2022-21; 5-2-2023 by Ord. No. 2023-07; 12-19-2023 by Ord. No. 2023-19; 6-5-2024 by Ord. No. 2024-09; 11-6-2024 by Ord. No. 2024-18; 2-18-2025 by Ord. No. 2025-02; 7-1-2025 by Ord. No. 2025-11; 12-2-2025 by Ord. No. 2025-19]
A. 
The following schedule consists of fees for the various applications, licenses, permits, activities and services required or provided for under Township ordinances, rules and regulations as included in this Code. Specific regulations, application procedures and requirements, conditions and approval provisions with respect to which each fee is required may be found in the pertinent chapter of this Code referred to below.
Chapter of Code/Type of Application, License, Permit, Activity or Service
Fee
Chapter 3, Charges for Copies of Township Records
1 to 10 pages
$0.75 per page
11 to 20 pages
$0.50 per page
Over 20 pages
$0.25 per page
Chapter 5, Construction Permit Prior Approval Fee
Prior approval certificate
$25
Chapter 32, Police and Public Safety, Department of
Police report fees
Reports released at police headquarters:
First 10 pages
$0.75 per page
Next 10 pages
$0.50 per page
Over 20 pages
$0.25 per page
Reports mailed:
Up to 5 pages
$10
Each additional page
$0.50 per page
Legal discoveries of case records, regardless of the number of copies
Minimum prepayment of $15, which will be applied to the total cost
Photographs
Reprints from negatives
$1 per print
Copy of a print with no negative
$2.50 per print
Copy of a print with negative
$5 per negative, plus $1 per print
Videos and audio tapes
Video copy
$50 each
Audio tape copy
$20 each
Typed statements
Up to 5 pages
$10
Each additional page
$0.50
Storage of vehicles and large equipment
Storage charge
$25 every 24 hours
Outside jobs and/or road jobs
See § 32-13F
Outside jobs for volunteer and nonprofit organizations, when the activity is designed to benefit the Holland Township community
See § 32-13G
Outside jobs or road jobs that entail the use of a police vehicle
See § 32-13H
Chapter 43, Alcoholic Beverages
Annual club license
$188
Annual plenary retail distribution license
$2,500
Aqnnual plenary retail consumption license
$2,500
Chapter 68, Dogs and Other Animals
Article II, Dogs
Annual license and registration
Sum of $12, including the following:
License fee
$12
Additional annual license and registration fee for any dog of reproductive age which has not had its reproductive capacity permanently altered through sterilization
$3
Annual license fee for kennel
10 or fewer dogs
$10
More than 10 dogs
$25
Annual license fee for pet shop
$0
Annual license fee for shelter or pound
$0
Additional fee for delinquent licenses
$10
Maintenance fee for seized dog
$10
Chapter 72, Driveways
Driveway permit
Existing driveway modified solely by repaving an already paved driveway with no change in driveway location or elevation
$25
Existing driveway modified solely by paving the existing stone or other surface of an existing driveway with no change in the driveway location or elevation
$100
New driveway construction or horizontal or vertical relocation of an existing driveway
$300
Reissuance fee: Where a previously issued driveway permit is requested to be amended, changed, or modified at the owner's request, a permit reissuance fee shall be paid
$100
Deposit, also to be paid as required by § 72-3E
$500
Chapter 76, Street Opening Permits
Application fees
0 to 50 square feet of disturbance
$50
51 to 300 square feet
$300
Over 300 square feet
$500
Inspection escrows
0 to 50 square feet
$750 per day ($375 per half day)
51 to 300 square feet
$750 per day ($375 per half day)
Over 300 square feet
$750 per day ($375 per half day)
Chapter 85, Fireworks
Application fee
$50
Chapter 89, Garbage, Rubbish and Refuse
Dumpster card
$50 per card
Disposal of passenger car and small equipment tires
$5 per tire
Disposal of SUV and pick-up truck tires
$8 per tire
Disposal of large industrial and farm equipment tires
$20 per tire
Disposal of mattress
$25 per item (mattress and box spring are separate items)
Chapter 100, Land Use
Part 1, Zoning
Industrial use permit special report fee
$250
Wireless telecommunications towers and antennas variance or conditional use permit fees
If no new tower is proposed
$1,000 application charge, plus $2,000 escrow deposit
If new tower is proposed
$5,000 application charge, plus $5,000 escrow deposit
Flood Hazard District development permit
$300 filing fee, plus $1,500 escrow deposit
Zoning permit
$75
Zoning permit solely for freestanding shed with floor area not exceeding 150 square feet or aboveground swimming pool
$25
Part 2, Development Regulations
Land Use application fees
Application
Application fee
Escrow deposit
Appeal of denial of zoning permit
$300
$1,000
Request for zoning interpretation
$300
$3,000
Bulk "C" Variance
$300
$3,000
Bulk "C" Variance —accessory building only
$100
$1,000
Use "D" Variance
$750
$5,000
Conditional use
$750
$5,000
Informal conceptual review/discussion
$300
N/A
Minor subdivision
$750
$5,000
Major subdivision
$1,000
$5,000
Minor site plan
$500
$5,000
Major site plan
$500
$5,000
Stormwater plan reviews
$300
$1,500
Initial inspection deposit (based on total cost of improvements)
Less than $10,000
7%
$10,000 to $50,000
$700, plus 6% of the excess over $10,000
$50,000 to $100,000
$3,100, plus 5% of the excess over $50,000
$100,000 to $200,000
$5,600, plus 4.5% of the excess over $100,000
More than $200,000
$10,000, plus 4% of the excess over $200,000
Witnessing fee for percolation tests
$250 per lot, plus an additional fee of $250 per day where observation of percolation tests on any lot exceeds one day's time
Special meeting fee
$100, in addition the administrative officer may require an additional escrow deposit of up to $1,000 for each special meeting
Construction inspection fee deposit (based on estimated cost of improvements)
Less than $5,000
$350
$5,000 but less than $10,000
$350, plus 5% of excess over $5,000
$10,000 but less than $50,000
$600, plus 4% of excess over $10,000
$50,000 and over
$2,200, plus 3% of excess over $50,000
Part 3, Stormwater Management
Stormwater plan review
$300
Development inspection escrow
$1,500
Chapter 115, Occupancy, Certificates of
First inspection fee
$75
Reinspection fee
$75
Chapter 120, Peddling and Soliciting
License fee
Bond
$1,000
Chapter 135, Sewers
Observation of sewer tests subsequent to initial test
$5
Surcharges for excess constituents
Biochemical oxygen demand (BOD)
$0.25 per pound
Suspended solids
$0.20 per pound
Chlorine demand
$0.20 per pound
Connection or hookup fee
$4,000 times the number of flat rate sewer rental units chargeable to all components of the connection unit to be served
Sanitary sewer rental[1]
$530 per year
Garbage grinder flat-rate sewer rental charge
$3 per quarter per garbage grinder
Fee to restore service
$50
Chapter 140, Soil Removal
Review fees
Applications for less than 500 cubic yards not involving any site work other than the excavation and removal of the material
$100
Applications for less than 500 cubic yards which will involve site work other than the excavation and removal of the material
$100, plus 1% of the cost of additional site work
Applications for 500 cubic yards or more not involving any site work other than the excavation and removal of the material
$300, plus $10 for every additional 500 cubic yards, or portion thereof, of material to be excavated or removed over the first $500
Applications for 500 cubic yards or more involving site work other than the excavation and removal of the material
$300, plus $10 for every additional 500 cubic yards, or portion thereof, of material to be excavated or removed, over the first 500, plus 1% of the cost of the additional site work
Inspection fees
Applications for less than 500 cubic yards not involving any site work other than the excavation and removal of the material
$100
Applications for less than 500 cubic yards which will involve site work other than the excavation and removal of the material
$100, plus 2% of the cost of the additional site work
Applications for 500 cubic yards or more not involving any site work other than the excavation and removal of the material
$100, plus $10 for every additional 500 cubic yards, or portion thereof, of material to be excavated or removed, over the first 500
Applications for 500 cubic yards or more involving site work other than the excavation and removal of the material
$100, plus $10 for every additional 500 cubic yards, or portion thereof, of material to be excavated or removed over the first 500, plus 2% of the cost of the additional site work
Chapter 145, Stormwater Quality
Article X, Tree Removal and Replacement
Application Fees
Category
Tree Removed
(DBH in inches)
Application Fee
1
2.5 (for street trees) or 6 (for non-street trees) to 12.99
$10 per tree
2
13 to 22.99
$20 per tree
3
23 to 32.99
$40 per tree
4
33 or greater
$50 per tree
Non-Replacement Fees
$100 per tree not replaced in accordance with the Tree Replacement Requirements Table in Chapter 145, Article X, Tree Removal and Replacement
Chapter 161, Trailers and Trailer Parks
License fees
$200 yearly, plus the sum of $2 per calendar week or fraction thereof per trailer
[1]
Editor's Note: Ord. No. 2011-2 provided that this fee be effective March 2011, with the quarterly payment due March 1.
B. 
The 2026 fees to be charged by the Riegel Ridge Community Center for memberships, guest, activities, etc., effective January 1st shall be as follows:
Riegel Ridge Community Center
2026 Fees
Fitness Center Membership and Personal Training
Membership Type - Monthly (Perpetual)
Resident/Non-Resident
2026 Resident
2026 Non-Resident
Family
$50
$60
Two Person (same household)
$45
$53
Individual Adult
$27
$34
Young Adult Perpetual (Monthly)
$24
$29
Senior Adult (age 65 and over)
$22
$30
Senior Couple (Primary is age 65 and over)
$30
$36
Membership Type - ANNUAL Resident/Non-Resident
2026 Resident
2026 Non-Resident
Family
$570
$684
Two Person (same household)
$513
$604
Individual Adult
$308
$388
Young Adult
$274
$331
Senior Adult (age 65 and over)
$251
$342
Senior Couple (Primary is age 65 and over)
$342
$410
Increase for 2026: $1 per month Resident/Non-Resident
Increase for Annual Pricing: Monthly Rate x 12 less 5% discount
Personal Training Fee
2026
1 Session
$47
3 Sessions
$137
5 Sessions
$228
10 Sessions
$447
Other RRCC Fees:
Bottled Beverages: $2 to $5
Credit Card Decline Fee: $8
EFT Decline Fee/Returned Check Fee: $20
Family Zumba Glow Party: $5/per person
Fitness Class Drop-In Fee: $12 Non-Resident
Fitness Class Drop-In Fee: $10 Resident
Gymnasium Event rental non-resident: $150
Gymnasium Event Rental Resident: $100
Gymnasium rental non-resident: $25 per rental, per hour
Gymnasium rental Resident: $20 per rental, per hour
Karate: $45/month
Lounge Rental/Tumble Time Party: $400 - Resident (6 hours maximum)
Lounge Rental/Tumble Time Party: $450 Non-Resident (6 hours maximum)
Men's Basketball League: $50/Rental
One Day Fitness Pass: $10 Resident
One Day Fitness Pass: $12 Non- Resident
Open Gym Fee: $5
Parks and Rec Special Event/Bus Trip: $20 to $100
Pickleball Clinic: $50 to $100
Pickleball Individual Lesson: $105/hour
Pickleball Open Play: $5 to $7 per hour
Pickleball Round Robin: $12 (90 minutes)
Pickleball Round Robin: $15 (120 minutes)
Pickleball Two Person Lesson: $55/each person
Pre-Paid Fitness Class Package: $100/10 classes - Resident
Pre-Paid Fitness Class Package: $120/10 classes - Non-Resident
RRCC Special Event: $10 to $50
Soccer Rental: $30
T-Shirt/Sweatshirt: $10 to $25
Tumble Time (Second Child): $3
Tumble Time: $7 per child
Tumble Time Package: $35 (5 Classes)
Tumble Time Package: $15 (Second Child - 5 Classes)
Zumba Kids: $50 to $100/session (Depending on length of session)
Riegel Ridge Summer Camp
2026
Resident Rate, per week
$313
Non-Resident Rate, per week
$369
Resident Increase 10%, Non-Resident Increase 14%
Other Summer Camp Fees:
Before Care: $45 to 50/week
After Care: $45 to 50/week
Field Trips: $20 to $70 (Depending on trip type)
Mini Camp: $20 to $150 (Depending on camp type)
Camp Change week fee: $15 per change
Summer Camp Payment Plan Set-Up Fee: $50
Riegel Ridge Community Pool
2026
Daily Admittance Fee Child/Adult
$12
Daily Admittance Fee Senior
$10
Membership Rates 2026
Resident
Non-Resident
Family - adult + kids to age 23
$489
$646
Individual - age 25 to 64
$209
$219
Two Person
$363
$381
Young Adult - age 13 to 24
$136
$143
Senior - age 65 or over
$113
$128
Senior Couple - age 65 + 1
$209
$236
Increase is 3%
Other RR Community Pool Fees:
Private Swim Lessons: $45/Per Lesson
Group Swim Lessons: $20/Per Lesson
Pool Pavilion Rental, 2 hours: $250 - Resident
Pool Pavilion Rental, 2 hours: $290 - Non-Resident
Aqua Zumba/Fitness Punch Card: $100/10 classes
Pool Special Event Fee: $10 per person