Operating permits
| ||
---|---|---|
Combustible dust-/vapor-producing operations
|
$225
| |
Storage of compressed and liquefied gases
| ||
Up to 10,000 gallons (container water capacity)
|
$225
| |
In excess of 10,000 gallons (container water capacity)
|
$225
| |
Storage of retail sale of propane (exchange) 2,000 gallons or
less
|
$225
| |
Explosive materials
|
$225
| |
Flammable/combustible liquids
| ||
Greater than 55 gallons but less than 1,000 gallons
|
$225
| |
1,000 gallons or greater
|
$300
| |
Flammable finishing
|
$225
| |
Public/private fireworks and pyrotechnic displays
|
$550
| |
Late fee — application received less than 14 days prior
to event
|
$150
| |
Pyroxylin plastics
|
$225
| |
Welding and other hot work
|
$225
| |
Facilities with an H area
|
$225
| |
Aviation facilities
|
$225
| |
Dry cleaning
|
$225
| |
Fruit crop ripening facilities
|
$225
| |
Fumigation and fogging
|
$225
| |
Semiconductor fabrication
|
$225
| |
Lumber and woodworking facilities
|
$225
| |
Organic coating processes
|
$225
| |
Industrial ovens
|
$225
| |
Motor-fuel-dispensing facilities and repair garages
|
$225
| |
High piled storage
|
$225
| |
Tire rebuilding
|
$225
| |
Aerosols
|
$225
| |
Combustible fibers
|
$225
| |
Corrosive material
|
$225
| |
Cryogenic fluids
|
$225
| |
Flammable gases
|
$225
| |
Flammable solids
|
$225
| |
Toxic materials
|
$225
| |
Organic peroxides
|
$225
| |
Oxidizers
| ||
Class 1
|
$225
| |
Class 2
|
$225
| |
Class 3
|
$225
| |
Class 4
|
$225
| |
Unstable Materials
| ||
Class 1
|
$225
| |
Class 2
|
$225
| |
Class 3
|
$225
| |
Class 4
|
$225
| |
Water reactive materials
|
$225
| |
Single event permits
| ||
Open burning, recreational fires, portable fireplaces and bonfires
|
$75
| |
Late fee (Late fee is charged after 4:00 p.m. on the working
day two days before the event. For weekend events, the fee will be
charged after 4:00 p.m. on the Wednesday prior to the event.)
|
$25
| |
Tents, canopies and other membrane structures
| ||
Less than 1,000 square feet
|
$100
| |
1,000 square feet but less than 3,600 square feet
|
$225
| |
3,600 square feet but less than 5,000 square feet
|
$325
| |
5,000 square feet but less than 10,000 square feet
|
$425
| |
10,000 square feet but less than 15,000 square feet
|
$525
| |
15,000 square feet or greater
|
$625
| |
Tents/canopies, commercial-sponsored event sponsored by a business
located outside of the Village of Southampton
|
$1,000
| |
Special event on beach, tent permit
|
$550
| |
Tent late fee (Late fee is charged after 4:00 p.m. on the working
day two days before the event. For weekend events, the fee will be
charged after 4:00 p.m. on Wednesday prior to the event.)
|
$100
| |
Compressed and liquefied gases
| ||
For each temporary installation 2,000 gallons or less
|
$50
| |
TLPG late fee (Late fee is charged after 4:00 p.m. on the working
day two days before the event. For weekend events, the fee will be
charged after 4:00 p.m. on Wednesday prior to the event.)
|
$25
| |
Public assembly annual operating permit
| ||
More than 50 people
|
$225
| |
Permits for system installation: If any fire-protection system
is modified or commencement of any installation is started without
the benefit of applicable fire prevention permit, all fees associated
with said modification or installation will be equal to double the
otherwise applicable fee for all fire-prevention permits
| ||
Plan review for commercial cooking vapor removal system
|
$225
| |
Each additional resubmittal review
|
$75
| |
Each additional acceptance test inspection required until final
approval is granted
|
$150
| |
Plans review for commercial alternative fire extinguishing system
(wet/dry)
|
$225
| |
Each additional resubmittal review
|
$75
| |
Each additional acceptance test inspection required until final
approval is granted
|
$150
| |
Plan review for installation of aboveground/underground LPG
system (one- and two-family exempt)
|
$225
| |
Each additional resubmittal review
|
$75
| |
Each additional acceptance test inspection required until final
approval is granted
|
$150
| |
Plans review for fire sprinkler system (one- and two-family
exempt)
|
$225
| |
Each additional resubmittal review
|
$75
| |
Each additional acceptance test inspection required until final
approval is granted
|
$150
| |
Plan review for automatic fire alarm and detection system
|
$225
| |
Each additional resubmittal review
|
$75
| |
Each additional acceptance test inspection required until final
approval is granted
|
$150
| |
Plan review for carbon monoxide detection/alarm
|
$225
| |
Each additional resubmittal review
|
$75
| |
Each additional acceptance test inspection required until final
approval is granted
|
$150
| |
Plan review for installation of aboveground/underground flammable/combustible
liquid tank
|
$225
| |
Each additional resubmittal review
|
$75
| |
Each additional final inspection required until final approval
is granted
|
$150
| |
Removal of underground flammable/combustible liquid tank
|
$150
| |
Plan review for any "H" occupancy or area
|
$225
| |
Each additional resubmittal review
|
$75
| |
Each additional final inspection required until a final approval
is granted
|
$150
| |
Tenant certificate of occupancy
|
$225
| |
Fire Prevention or Building Department presubmission plan review
|
$225
| |
Should the applicant request an inspection from the Fire Marshal's
office after normal business hours or on weekends, the applicant will
be responsible in paying an additional fee at the rate of $150 per
hour. In the event only a portion of an hour has been completed, it
shall be rounded up to the next full hour. Minimum fee $450. *Subject