An application for a building permit shall comply with the current
version of the Massachusetts State Building Code.
The Selectboard shall set all building, wiring, plumbing and
heating, ventilation and cooling ("HVAC") permit fees.
The following are inspections requiring notification
of the Building Inspector:
A. Inspection of footing and foundation walls before
backfilling.
B. Inspection of framing before drywalling.
C. Inspection of occupancy before entry.
Other permits required for construction are
as follows:
C. Furnace installation permits.