[HISTORY: Adopted by the Board of Supervisors
of the Township of Chestnuthill 10-24-2002 by Ord. No. 2002-03. Amendments noted where applicable.]
GENERAL REFERENCES
098a Flowchart Major SubdivPlanning Commission — See Ch. 20.
Building numbering and street naming — See Ch. 35.
Uniform construction codes — See Ch. 41.
Official Map — See Ch. 72.
Individual sewage disposal systems — See Ch. 88.
Stormwater management — See Ch. 92.
Streets and sidewalks — See Ch. 95.
Zoning — See Ch. 119.












Article I General Provisions
§ 98-1 Title.
§ 98-2 Short title.
§ 98-3 Purpose.
§ 98-4 Applicability.
§ 98-5 Exemptions.
§ 98-6 Interpretation.
§ 98-7 Modifications and exceptions.
§ 98-8 Fees.
§ 98-9 Revisions, alternate plans and resubdivisions.
§ 98-10 Township records.
§ 98-11 Amendments to chapter.
§ 98-12 Appeals to courts.
§ 98-13 Enforcement.
§ 98-14 Violations and penalties.
§ 98-15 Liability.
§ 98-16 Planning Code amendments.
§ 98-17 Land development requirements.
Article II Definitions
§ 98-18 General interpretation.
§ 98-19 Definitions.
Article III Overview of General Procedures
§ 98-20 Purpose.
§ 98-21 General procedure for subdivisions and land developments.
§ 98-22 General plan submission procedures.
§ 98-23 Effect of Official Map.
Article IV Sketch Plan
§ 98-24 Preplan consultation.
§ 98-25 Sketch plan submission requirements.
§ 98-26 Sketch plan review procedures.
Article V Preliminary Plans for Major Subdivisions and Certain Land Developments
§ 98-27 Initial steps.
§ 98-28 Submission and review procedure.
§ 98-29 Preliminary plan requirements.
§ 98-30 Certification.
§ 98-31 Conservation design process.
Article VI Final Plans for Subdivisions and Certain Land Developments
§ 98-32 Applicability.
§ 98-33 Submission and review procedure.
§ 98-34 Final plan requirements.
§ 98-35 Certification.
Article VII Minor Subdivisions, Certain Land Developments and Lot Line Adjustments
§ 98-36 Purpose.
§ 98-37 Official Map determination.
§ 98-38 Submission and review procedure.
§ 98-39 Minor subdivision final plan requirements.
§ 98-40 Lot line adjustments, annexations and minor revisions of approved plans.
§ 98-41 Certification.
§ 98-42 Recording plans.
Article VIII Improvements Guarantees
§ 98-43 Guarantee of improvements installation required.
§ 98-44 Improvements to be provided by applicant.
§ 98-45 Development agreement.
§ 98-46 Performance guarantee.
§ 98-47 Approval of improvements.
§ 98-48 Remedies to effect completion of improvements.
§ 98-49 Maintenance guarantee.
§ 98-49.1 Operation and maintenance of PennDOT-required facilities.
Article IX Recording of Final Plan
§ 98-50 Final plan to be recorded.
§ 98-51 Record plan.
§ 98-52 Effect of recording.
§ 98-52.1 Requirements for as-built plans.
Article X Design Standards and Required Improvements
§ 98-53 Applicability.
§ 98-54 Required improvements.
§ 98-55 Overall requirements.
§ 98-56 Effect of Official Map on improvements.
§ 98-57 Streets.
§ 98-58 Blocks.
§ 98-59 Lots.
§ 98-60 Common open space, recreation areas and fees.
§ 98-61 Stormwater management.
§ 98-62 Sanitary sewage disposal systems.
§ 98-63 Water supply systems, fire hydrants and fire protection.
§ 98-64 Waste dumpsters, utilities and utility easements.
§ 98-65 Access drives and driveways.
§ 98-66 Off-street parking and loading.
§ 98-67 Sidewalks, pathways and driveway aprons.
§ 98-68 Streetlighting.
§ 98-68.1 Control of light and glare.
§ 98-69 Street names.
§ 98-70 Regulatory signs.
§ 98-71 Landscape requirements.
§ 98-72 Monuments and lot pins.
§ 98-73 Curbs.
§ 98-74 Erosion control and grading.
§ 98-75 Lot width modifications; flag lot within a conservation subdivision.
§ 98-76 Conservation open space.
§ 98-76.1 Design standards for development in the GC, VC and LIC Districts.
Article XI Additional Standards for Mobile Home Parks
§ 98-77 Applicability; interpretation.
§ 98-78 Exemptions.
§ 98-79 Other requirements of chapter.
§ 98-80 General standards and requirements.
Article XII Additional Requirements for Camps and Campgrounds