Wastewater discharge permits shall be issued for a specified time period, not to exceed five years. A wastewater discharge permit may be issued for a period less than five years at the discretion of the Executive Director. Each wastewater discharge permit will indicate a specific date upon which it will expire.
Wastewater discharge permits shall include such conditions as are reasonably deemed necessary by the Executive Director to prevent pass-through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, protect ambient air quality and protect against damage to the POTW.
A. 
Wastewater discharge permits must contain the following information:
(1) 
A statement that indicates wastewater discharge permit duration, which in no event shall exceed five years.
(2) 
A statement that the wastewater discharge permit is nontransferable without prior notification to and approval from the PSA, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit.
(3) 
Effluent limits applicable to the user, based on applicable standards in federal, state and local law.
(4) 
Self-monitoring, sampling, reporting, notification and recordkeeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency and sample type, based on federal, state and local law.
(5) 
A statement of applicable civil, criminal and administrative penalties for violation of pretreatment standards and requirements and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state or local law.
B. 
Wastewater discharge permits may, in addition, require the industrial user to comply with the following conditions:
(1) 
Limits on the average and/or maximum rate of discharge, time of discharge and/or requirements for flow regulation and equalization.
(2) 
Limits on the instantaneous, daily and monthly average and/or maximum concentration, mass or other measure of identified wastewater pollutants of properties.
(3) 
Requirements for the installation of pretreatment technology, pollution control or construction of appropriate containment devices, designed to reduce, eliminate or prevent the introduction of pollutants into the POTW.
(4) 
Development and implementation of spill-control plans or other special conditions, including management practices necessary to adequately prevent accidental, unanticipated or routine discharges.
(5) 
The development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW.
(6) 
The unit charge or schedule of industrial user charges and fees for the management of the wastewater discharged to the POTW.
(7) 
Requirements for the installation and maintenance of inspection and sampling facilities and equipment.
(8) 
A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit.
(9) 
Other conditions as deemed appropriate by the Executive Director to ensure compliance with this chapter and state and federal laws, rules and regulations.
Any person, including the industrial user, may petition the PSA to reconsider the terms of a wastewater discharge permit within 10 days of its issuance.
A. 
Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal.
B. 
In its petition, the petitioning party must specify the wastewater discharge permit provisions objected to, the reasons for this objection and the alternative condition, if any, it seeks to place in the wastewater discharge permit.
C. 
The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal.
D. 
If the PSA fails to act within 10 days, the request for reconsideration shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit or not to modify a wastewater discharge permit shall be considered final administrative action for purposes of judicial review.
E. 
Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision must do so by filing a notice of appeal with the PSA Executive Director within 30 days of the PSA's decision and must further comply with Part 2A of the Rules of the Supreme Court of Virginia.
A. 
The Executive Director may modify the wastewater discharge permit for good cause, including but not limited to the following:
(1) 
To incorporate any new or revised federal, state or local pretreatment standards or requirements.
(2) 
To address significant alterations or additions to the industrial user's operation, processes or wastewater volume or character since the time of wastewater discharge permit issuance.
(3) 
A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge.
(4) 
Information indicating that the permitted discharge poses a threat to the POTW, the PSA personnel or the receiving waters.
(5) 
Violation of any terms or conditions of the wastewater discharge permit.
(6) 
Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting.
(7) 
Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13.
(8) 
To correct typographical or other errors in the wastewater discharge permit.
(9) 
To reflect a transfer of the facility ownership and/or operation to a new owner/operator.
B. 
The filing of a request by the permittee for a wastewater discharge permit modification does not stay any wastewater discharge permit condition.
A. 
Wastewater discharge permits may be reassigned or transferred to a new user only if the permittee gives at least 30 days' advance notice to the Executive Director and the Executive Director approves the wastewater discharge permit transfer. The notice to the Executive Director must include a written certification by the new user which:
(1) 
States that the new user has no immediate intent to change the facility's operations and processes.
(2) 
Identifies the specific date on which the transfer is to occur.
(3) 
Acknowledges the new user's full responsibility for complying with the existing wastewater discharge permit.
B. 
Failure to provide advance notice of a transfer renders the wastewater discharge permit voidable on the date of facility transfer.
A. 
Wastewater discharge permits may be revoked for the following reasons:
(1) 
Failure to notify the PSA of significant changes to the wastewater prior to the changed discharge.
(2) 
Failure to provide prior notification to the PSA of changed condition pursuant to § 73-51.
(3) 
Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application.
(4) 
Falsifying self-monitoring equipment.
(5) 
Tampering with monitoring equipment.
(6) 
Refusing to allow the PSA timely access to the facility premises and records.
(7) 
Failure to meet effluent limitations.
(8) 
Failure to pay fines.
(9) 
Failure to pay sewer charges.
(10) 
Failure to meet compliance schedules.
(11) 
Failure to complete a wastewater survey or the wastewater discharge permit application.
(12) 
Failure to provide advance notice of the transfer of a permitted facility.
(13) 
Violation of any pretreatment standard or requirement or any terms of the wastewater discharge permit or the chapter.
B. 
Wastewater discharge permits shall be voidable upon user's nonuse, cessation of operations or transfer of business ownership. All wastewater discharge permits are void upon the issuance of a new wastewater discharge permit.
A significant industrial user shall apply for wastewater discharge permit reissuance by submitting a complete wastewater discharge permit application in accordance with § 73-38 a minimum of 30 days prior to the expiration of the industrial user's existing wastewater discharge permit.
In the event another municipality contributes all or a portion of its wastewater to the POTW, the POTW may require such municipality to apply for and obtain a municipal wastewater discharge permit.
A. 
A municipal wastewater discharge permit application shall include:
(1) 
A description of the quality and volume of the wastewater at the point(s) where it enters the POTW.
(2) 
An inventory of all industrial users discharging to the municipality.
(3) 
Such other information as may be required by the Executive Director.
B. 
A municipal wastewater discharge permit shall contain the following conditions:
(1) 
A requirement for the municipal user to adopt a sewer use ordinance which is at least as stringent as this chapter and local limits which are at least as stringent as those set out in § 73-12.
(2) 
A requirement for the municipal user to submit a revised industrial user inventory on at least an annual basis.
(3) 
A requirement for the municipal user to:
(a) 
Conduct pretreatment implementation activities, including industrial user permit issuance, inspection and sampling and enforcement; or
(b) 
Authorize the POTW to take or conduct such activities on its behalf.
(4) 
A requirement for the municipal user to provide the PSA with access to all information that the municipal user obtains as part of its pretreatment activities.
(5) 
Limits on the nature, quality and volume of the municipal user's wastewater at the point where it discharges to the POTW.
(6) 
Requirements for monitoring the municipal user's discharge.
C. 
Violation of the terms and conditions of the municipal user's wastewater discharge permit shall subject the municipal user to the sanctions set out in Article VIII.