Except where expressly authorized by an applicable
pretreatment standard, no user shall ever increase the use of process
water or in any way attempt to dilute a discharge as a partial or
a complete substitute for adequate treatment to achieve compliance
with the federal, state or local limitations contained in this chapter.
lf dilution is allowed, the industrial wastewater discharge permit
may contain mass limitations regarding materials for which dilution
is allowed.
Each user shall provide protection from accidental discharge of substances regulated by this chapter. Facilities to prevent accidental discharge of prohibited substances shall be provided by and maintained at the owner's or user's own cost and expense. Detailed plans acceptable to the Village and the Board showing facilities and operating procedures to provide this protection shall be submitted to the Village and the Board for review and shall be approved by the Village and the Board before construction of this facility. All existing users shall complete such a plan within six months of the effective date of this chapter. No user who commences contribution to the POTW after the effective date of this chapter shall be permitted to introduce pollutants into the system until accidental discharge procedures have been approved by the Village and the Board. Review and approval of such plans and operating procedures shall not relieve the industrial user from the responsibility to modify the user's facility as necessary to meet the requirements of this chapter or from any of the sanctions set forth in Article
XI of this chapter in event of a violation of the terms of this chapter.