[Adopted 11-12-1984 by Ord. No. 16-84 (Ch. A181 of the 1975 Code)]
[Amended 2-13-1995 by Ord. No. 1-95]
No water connection shall be made except based on an application filed at the Borough Hall. All applications must be accompanied by a fee in the amount of $40.
[Amended 2-13-1995 by Ord. No. 1-95; 9-13-2010 by Ord. No. 10-23]
Where nonmetered water service is authorized in connection with construction work or otherwise, the same shall be billed at the following rates:
A. 
Residential: Application permit fee of $150 and monthly charge of $30.
B. 
Commercial or industrial: Application permit fee of $300 plus a monthly charge of $100.
C. 
Swimming pool from hydrant: such use is prohibited.
D. 
All temporary services must be equipped with a backflow preventer.
[Amended 2-13-1995 by Ord. No. 1-95; 9-13-2010 by Ord. No. 10-23; 11-12-2022 by Ord. No. 22-15]
The Mayor and Borough Council, by resolution, may establish, from time to time, tapping fees payable for tapping onto the main water line for permanent connections, new construction, and any upgrades in size of service, along with other ancillary fees and charges, as follows:
A. 
For a size between 3/4 inch and one inch, tapping fees shall include materials and labor. Upgrades to a water service will be charged as new tap fee to the resident. The resident receives a street opening permit, excavates, and backfills.
B. 
For a size between 1°1/2 inches and two inches, the resident shall obtain necessary permits, furnish a water meter as directed by the Chatham Water Department, excavate, and backfill. The resident has the option of purchasing the water meter from the Borough. The Borough is only supplying the tap, saddle, and corporation. The Borough will not supply the copper line, curb stop, and curb box.
C. 
For a size between three inches and eight inches, all work may be completed by the resident or a builder with permits obtained from, and necessary fees paid to, the Borough. The resident or builder supplies all material, including the water meter as directed by the Chatham Water Department, and performs all work, including excavation and backfilling. All work performed shall be inspected by a Borough representative. Additional fees relating to the supervision and inspection of all such work may also be charged.
D. 
Additional fees may be charged by the Borough for the supervision of all main work, whether such work is new work, repair work, or replacement work, and pressure tests. Said fees may be charged on a per-day or per-hour basis, depending on the scope of the work
E. 
Additional fees may be charged by the Borough for the inspection of all main and service line construction, whether such work is new work, repair work, or replacement work. Said fees may be charged on a per-day or per-hour basis, depending on the scope of the work.
[Amended 2-13-1995 by Ord. No. 1-95]
After any sewer lateral has been laid in an open trench, it must be inspected by an authorized agent before any attempt to close the trench, and the fee for this inspection will be $35, payable before the inspection.
A. 
The Borough reserves a right of entry upon reasonable notice to test and replace all meters during normal business hours.
B. 
For testing a meter at a customer’s request for service size connections of 3/4 inch and one inch, a fee of $25 shall be charged. The fee is subject to refund if the meter is found to have an error in excess of 2%. All service size connections of 1 1/2 inches and larger require that the meter be tested by a private vendor, with such fees to be paid directly from the customer to the private vendor.
[Amended 9-13-2010 by Ord. No. 10-23]
C. 
In replacing water meters which have become frozen or otherwise damaged by other than normal wear and tear, the fee for this service shall be $20, plus the lesser of the cost of the parts required or a new meter.
D. 
The owner shall be responsible for providing reasonable access to the meter, which shall include at least six inches of space at the top and bottom, 10 inches on each side and 24 inches to the front.
E. 
Charges for water meters.
[Added 9-13-2010 by Ord. No. 10-23]
(1) 
The following charges will be assessed for the cost of the water meters installed for any permanent water connections of the following service sizes:
(a) 
Three-fourths inch: $200;
(b) 
One inch: $275;
(c) 
One and one-half inches or larger: current going market price.
(2) 
If the meter is damaged by freezing or any other natural cause or negligent act by the resident or other individual who is an invitee or licensee of the resident, the full cost of the meter shall be paid to the Borough. The full cost of the meter shall also be paid to the Borough for any new construction or rebuilding of a home.
(3) 
The charges in this subsection are subject to modification by the Mayor and Borough Council upon application by the Chatham Water Department, which shall be based upon a reasonable showing of going market rate price fluctuations.
[Amended 7-8-2002 by Ord. No. 02-14]
A. 
Water bills for water consumed shall be rendered to the owner of the premises or his designee quarterly. In the event that a meter is inaccessible for any reason, the consumer shall be responsible for entering the meter reading upon a form provided by the Water Utility and for returning this form to the Water Utility within five days. If the form is not received by the Water Utility within five days and a reading is not phoned to the Water Clerk, the consumer shall be billed using an estimate based upon the average amount of water consumed during the previous four quarters, plus 25%.
B. 
It is the consumer's responsibility to ensure that the Water Utility at least once per year is granted access for actual reading. In the event that the period between actual readings exceeds one year, the owner or his designee will be notified that water service may be terminated until arrangements are made for access to the water meter during normal working hours. If the water is turned off, the consumer shall pay to the Borough the sum(s) Council designates by resolution for such water shutoff.
C. 
(1) 
All water bills shall be due and payable within 30 days of the billing date. In the event that said payment is not made in full within the thirty-day period, then the consumer shall pay to the Borough late charges as Council designates by resolution.
(2) 
In the event that the consumer fails to pay within 60 days, then the consumer shall be subject to the water shutoff program, the rules and regulations for which Council shall designate by resolution.
D. 
The charges hereby imposed shall be payable to the Borough and shall be a lien upon the property connected to the water supply until paid, and the Borough shall have the same remedies for collection thereof, with interest, costs and penalties, as it has by law for the collection of taxes on real estate.
[Amended 2-13-1995 by Ord. No. 1-95; 9-13-2010 by Ord. No. 10-23]
Application for turning water on or off at any location shall be made at the Borough Hall. Water service shall only be turned off by an authorized Borough employee. No fee shall be charged for turning the water off, but the fee for turning water service on again shall be as follows: $35 during business hours; $70 after business hours.
A. 
The state and county highways within the Borough of Chatham are as follows: Main Street, Fairmount Avenue, Passaic Avenue and Watchung Avenue.
B. 
A permit to open a state or county highway must be obtained from the proper authorities by the applicant before any part of the work in connection therewith is commenced by the Water Utility.
[Added 11-10-2003 by Ord. No. 03-24; amended 5-22-2006 by Ord. No. 06-14[1]]
The Council of the Borough of Chatham shall annually adopt by resolution a Policy and Procedures Manual for Water and Sewer Service.
[1]
Editor's Note: This ordinance provided for the relocation of former § 267-9, Application for sanitary sewer connections; fees, and § 267-10, Fees for permanent sewer connections, to Ch. 217, Art. III, and the renumbering of subsequent sections, respectively.
[Added 2-8-2010 by Ord. No. 10-02]
No service charge shall be levied or collected hereunder for any water consumed or used from those properties which are connected to any water connection within the Borough in use by the Borough of Chatham Emergency Squad.