[Amended 3-17-1975 by Ord. No. 454]
A. Where connection with the sanitary sewer system of the Borough is
practicable, the owner, by special arrangement with the Council, shall
install sanitary sewers and sewer laterals in conformity with Borough
specifications for sanitary sewer construction before streets and
roads shown on the plans are constructed. All gas, water, electric
and other mains, pipes and conduits, together with all service connections
or laterals, shall be laid, when the need for the same can be reasonably
anticipated, before the streets and roads shown on the plans are constructed.
B. Where connection to public sanitary sewers is not possible, the subdivider
may install a sewage disposal plant and sanitary sewers connecting
thereto in a manner satisfactory to the State Health Department; such
facilities shall be dedicated to the Borough or shall be operated
in conformance with the regulations of the Pennsylvania Public Utilities
Commission and the State Health Department.
C. Every lot in a subdivision shall be capable of being served by electric,
gas, water, telephone and other utilities as deemed necessary. The
linen plats shall provide easements where required for the installation
of said underground improvements.
D. Where bridges, dams and/or other structures are placed on streams
with a drainage area of 1/2 square mile or larger or where a permit
is required by the Pennsylvania Department of Environmental Regulations,
application should be made to the Department of Environmental Resources,
Harrisburg, Pennsylvania, by the person in interest, and a copy of
such permit shall be filed with the Borough Engineer.
[Amended 3-17-1975 by Ord. No. 454]
A street name sign for each intersection shall be installed.
The subdivider shall provide a cash escrow with the Borough of Baldwin
to guarantee the placement of these signs. The amount of the escrow
shall be determined by the Borough Council by resolutions adopted
from time to time.