Only Town residents, who have applied for and
received the necessary receipt/permit, shall be allowed to dispose
building materials at the Town garage, provided that these materials
originated from a residential dwelling unit located within the corporate
limits of the Town.
[Amended 10-2-2017 by Ord. No. 27-2017]
A. Building
materials, as used in this article, shall be limited to the following:
wood (as used in framing and/or siding), wood moldings, window frames
and glass, plumbing fixtures and piping, plaster, drywall, insulation,
electrical wiring and fixtures, heating fixtures and piping, shingles,
tar paper, gutters (wood and aluminum), doors (wood, aluminum or metal),
auto parts and tires.
B. The maximum-size
vehicle that will be allowed to dispose building materials at the
Town garage is a three-fourths-ton pickup truck. Dump trucks or mason
trucks of any size are expressly prohibited.
The procedures to be followed for the disposal
of building materials at the Town garage are as follows:
A. An application is to be completed and submitted to
the Town Clerk, along with the appropriate fee. This application shall
include, at a minimum, the following information:
(1) Name, address and phone number of applicant (this
must be the owner of the property where the building materials originate).
(2) Description of materials to be disposed.
(3) Quantity of material (truck load, station wagon, pickup
truck load).
(4) Name, address and phone number of person disposing
the building materials (if different than the applicant).
(5) Address of residential dwelling where the building
materials originate.
B. A two-part receipt/permit will be issued by the Town
Clerk's office authorizing the disposal of the building materials
at the Town garage. This receipt/permit is to be signed by the Superintendent
of Public Works (or his designee at the Town garage responsible for
monitoring the dumping of building materials), who will also keep
one copy of the receipt/permit for the Town's records.
C. Hours of operation are to be set by the Superintendent
of Public Works.
Any load of building materials approved for
disposal at the Town garage may be rejected if it is determined that:
A. The load is a larger quantity than specified on the
receipt/permit.
B. The load contains materials not included in §
246-24.
C. The load is determined to have originated from out-of-town.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. I)]
The fee schedule for the dumping of building materials at the Town garage shall be as provided in Chapter
130, Fees, Article
III, Fee Schedule.
Any person who shall violate the provisions of this article shall be liable to the penalty stated in Chapter
1, General Provisions, Article
III, General Penalty.