During any stage of the work, if the Township Engineer and/or Township
of Exeter or their designee determines that the permanent stormwater
management facilities are not being installed in accordance with the
approved stormwater management plan, the Township of Exeter shall
revoke any existing building permits and issue a cease-and-desist
order until a revised stormwater management plan is submitted and
approved except as directed by the Township Engineer and the Township
of Exeter or Conservation District, as specified in this Part 2.