Chapter/Section
|
Type or Purpose/Fee
| |
---|---|---|
Ch. 57, Amusements
| ||
§ 57-7
|
Assembly and public assembly permits:
| |
Capacity in Persons
|
Fee Per Year or Fraction Thereof
| |
0 to 49
|
$175
| |
50 to 100
|
$275
| |
101 to 200
|
$375
| |
201 to 300
|
$475
| |
301 to 400
|
$575
| |
401 to 500
|
$700
| |
501 to 600
|
$800
| |
601 to 700
|
$900
| |
701 to 999
|
$1,000
| |
1,000 to 1,500
|
$1,300
| |
Assessed late fees:
|
30 days late adds 20% of fee due
| |
45 days late adds 25% of fee due
| ||
60 days late adds 30% of fee due
| ||
90 days late adds 40% of fee due
| ||
An additional fee of $100 shall be charged for each 100 persons
or fraction thereof in excess of 1,500
| ||
Special permit fee: $500 for temporary events and ground signs;
$3,000 as required for site plan approval and/or certificate of occupancy
| ||
§ 57-27B
|
Annual license fee, per device: $25; additional $100 for each
premises that contains more than 2 devices
| |
Ch. 65, Building Construction
| ||
§ 65-6A
|
Minimum building permit fee: $100
| |
§ 65-6B
|
For each building permit where construction costs exceed $1,000,
an additional fee of $7 per $1,000 or fraction thereof, in addition
to the original charge of $100, which charge shall be computed up
to a total of $50,000 of building costs, and for each building permit
where construction costs exceed $50,000, an additional fee of $6 per
$1,000 or fraction thereof
| |
§ 65-6C
|
Building permit fees
| |
Type of Building
|
Cost per Square Foot
| |
1-family dwelling
|
$175
| |
Basements and cellars
|
$50
| |
Convert storage space to living space
|
$100
| |
Miscellaneous
|
Cost estimate to be determined by Building Inspector
| |
Detached garage and shed
|
$50
| |
Wood decks
|
$50
| |
Business use, commercial interior alterations
|
$175
| |
Commercial exterior shell
|
$100
| |
§ 65-6E
|
Construction or alteration work:
| |
To demolish a building, unless said demolition is a necessary
part of an alteration for which a permit has been issued:
| ||
Residential: $250
| ||
Commercial: $1,500
| ||
To demolish a swimming pool: $125
| ||
To move a building: $250
| ||
Duplicate certificate of occupancy: $35
| ||
A certificate attesting to disposition of record: $25
| ||
Plumbing: $100 per inspection
| ||
Building permit for other than a single-family residential occupancy:
additional $200 will be charged for the fire prevention permit
| ||
§ 65-6I
|
In each case where a building permit is applied for and the
structure has been erected or erection has been commenced prior to
the application for the building permit, there shall be additional
fees as follows:
| |
Residential: $500
| ||
Commercial: $1,500
| ||
Ch. 82, Electrical Inspection Services
| ||
§ 82-3E
|
Electrical inspectors fee: $250 for each year or part thereof
| |
Ch. 89, Fire Prevention
| ||
§ 89-13
|
Plan review fees (includes 1 inspection):
| |
Type of Plan
|
Fee
| |
Fire alarm
|
$450
| |
Sprinkler system
|
$450
| |
Fixed suppression
|
$450
| |
Fire-stopping
|
$450
| |
Hood system
|
$450
| |
Construction
|
$500
| |
Propane gas (review only)
|
$250
| |
Fireworks (includes on-site)
|
$750
| |
Re-review of plans due to failure
|
$250
| |
Reinspection due to failure
|
$250
| |
§ 89-15A
|
Operating permit fees:
| |
Building Area (square feet)
|
Fee
| |
Up to 1,000
|
$85
| |
1,001 to 3,500
|
$225
| |
3,501 to 5,000
|
$350
| |
5,001 to 10,000
|
$500
| |
10,001 to 15,000
|
$600
| |
15,001 to 20,000
|
$700
| |
20,001 to 30,000
|
$800
| |
30,001 to 40,000
|
$900
| |
40,001 to 50,000
|
$1,000
| |
50,001 to 100,000
|
$1,200
| |
In excess of 150,000
|
$1,500
| |
In excess of 200,000
|
$1,750
| |
Assessed late fees:
|
30 days late: add 20% of fee due
| |
45 days late: add 25% of fee due
| ||
60 days late: add 30% of fee due
| ||
90 days late: add 40% of fee due
| ||
Ch. 121, Peddling and Soliciting
| ||
§ 121-3A
|
Peddling and soliciting licenses: $100
| |
Ch. 134, Sand and Gravel Pits
| ||
§ 134-3H
|
Residential subdivisions and/or site plans and/or road improvements:
$0.75 per cubic yard for all material removed from the entire project
in accordance with Village requirements for drainage, roads, recharge
basins and any other Village-required improvements
| |
Residential subdivisions and/or site plans and/or road improvements:
$3 per cubic yard for all material removed for improvements and/or
purposes other than in compliance with Village requirements for drainage,
roads, recharge basins and any other Village-required improvements
| ||
For all commercial and/or industrial subdivisions and/or site
plans and/or road improvements: $1 per cubic yard for all material
removed from the entire project in accordance with Village requirements
for drainage and other Village-required improvements
| ||
For all commercial and/or industrial subdivisions and/or site
plans and/or road improvements: $3 per cubic yard for all material
removed for any and all purposes and/or improvements other than those
required for compliance with Village drainage requirements and other
Village-required improvements
| ||
Ch. 142, Signs
| ||
§ 142-6M
|
Temporary sign permit: $4.50 per square foot, and in no instance
less than $50
| |
§ 142-12A
|
Sign permit: $4.50 per square foot or any portion thereof; in
no event shall the fee for any sign permit or any renewal thereof
be less than $50 for each year.
| |
A "for sale," "for lease" or "for rent" sign placed in the name
of a real estate broker: $25 minimum
| ||
Renewal of a permit: $2 per square foot
| ||
Ch. 150, Solid Waste
| ||
§ 150-8A
|
Garbage collectors license: annual fee of $550 including first
vehicle and $275 per each additional vehicle used in the Village
| |
Ch. 154, Streets and Sidewalks
| ||
§ 154-3
|
Highway alteration or excavation permit: $200 for each highway
opening for each building plot or lot
| |
Ch. 159, Subdivision of Land
| ||
Applications for plat approval for minor subdivisions: $350
plus $200 per acre or part thereof
| ||
Application for preliminary approval of major subdivision: $550,
plus $200 for each acre or part thereof
| ||
§ 159-8A
|
Application for major subdivision approval: $100 per acre or
fraction thereof
| |
Inspection fee: 6% of the cost of the proposed improvements
| ||
Ch. 175, Zoning
| ||
§ 175-57A
|
Building permit fee for altering size or shape of driveway or
addition of parking areas/driveways: $50
| |
§ 175-57E
|
Building permit fee for swimming pools:
| |
Inground: $325
| ||
Semi-in-ground: $225
| ||
Aboveground: $125
| ||
§ 175-58D
|
Application for certificate of existing use: $100
| |
§ 175-64
|
Appeal to the Board of Appeals: $175
| |
More than 1 variance: $325
| ||
Application for a special permit or reduced lot area: $500
| ||
Renewal of a special permit: $100
| ||
Applications to the Board of Appeals for commercial applications:
$1,200
| ||
Where an appeal to the Board of Appeals is to validate a nonconforming
structure or use which was erected or commenced prior to the application
or the application is for a special permit for a use which commenced
prior to the application, additional fees as follows:
| ||
Residential: $500
| ||
Commercial: $1,500
| ||
§ 175-69A
|
Application for site plan approval: $500, plus $200 for each
acre or major fraction thereof as shown on the proposed site plan,
including any areas to be dedicated or conveyed to the Village of
Lake Grove
| |
Inspection fee: 4% of the cost of all on-site improvements
| ||
Zone change: $2,000 up to 1 acre; $200 per additional acre or
fraction thereof for each parcel of land which will be affected by
the requested change of zone, plus all actual advertising and recording
expenses
| ||
§ 175-97
|
Amendment of covenant: $500
| |
§ 175-108A
|
One-time fee for automotive vehicle dealers displaying automotive
vehicles outside for sale: $500
| |
§ 175-113
|
Special permit fee for structures housing animals: $500
|