A. 
Location. The locations of the sidewalks shall be as established by Chapter 170, Zoning, and Chapter 152, Subdivision Control.
B. 
General.
(1) 
In general, sidewalks should be located within the public right-of-way one foot from property lines. Where not in public rights-of-way, a ten-foot-wide permanent easement shall be provided to the Township.
(2) 
Five-foot-wide sidewalks shall be constructed with concrete.
(3) 
Eight-foot-wide sidewalks shall be constructed of concrete or asphalt.
(4) 
All sidewalks shall be designed to provide eight feet of vertical clearance.
(5) 
Barrier-free ramps shall be constructed at all curb crossings per MDOT Standard Plans and Specifications and Wayne County requirements.
(6) 
Longitudinal grades shall generally follow the existing topography with a maximum grade of 5%. Where road grades exceed 5%, the longitudinal grade of the sidewalk shall be permitted to be greater than 5%, but cannot exceed the road grade.
(7) 
Transverse grades shall be provided to accommodate adequate surface drainage and be a maximum of 2%.
A. 
All construction practices shall be consistent with the 2003 MDOT Standard Specifications for Construction (or most current) or as modified by the WCDPS for locations within their jurisdiction.
B. 
Existing vegetation and topsoil shall be removed prior to placement of the surface. Subgrade shall be proof-rolled using an eight- to ten-ton roller or approved mechanical compaction device. Any unstable areas shall be undercut at the direction of the Director and filled with coarse aggregate. The subgrade shall be treated with an herbicide, application rate to be determined based on existing soils per manufacturer's recommendations. Any embankment required shall be constructed of granular material, compacted to 95% maximum unit weight.
C. 
Material and construction standards for concrete sidewalks.
(1) 
All sidewalks shall be four-inch-thick MDOT Grade P1 concrete, except where crossing concrete drive approaches, where they shall meet the drive approach standards of six inches or eight inches of MDOT Grade P1 concrete. The concrete shall be placed on a minimum four-inch-thick base of MDOT Class II granular material. Subgrade shall be proof-rolled for acceptance. In general it shall be free of organic material.
(2) 
The base material and adjacent concrete shall be wet down prior to placement of concrete to prevent water loss through the base and to form a better bond between old and new concrete. If a construction joint is required, the existing concrete surface is to be cleaned with compressed air to expose the aggregate in the concrete.
(3) 
The concrete sidewalk shall be finished in a neat and workmanlike manner, with a light, broom finish.
(4) 
Water shall not be added to the concrete surface ("blessing" the concrete) to aid in the finishing.
(5) 
Control joints shall be placed at five-foot intervals and may be tooled or sawed. The method of forming joints and spacing shall be approved by the Director prior to construction.
(6) 
One-inch-thick expansion joints shall be placed between the sidewalk and back of abutting curb or gutter.
(7) 
One-half-inch-thick expansion joints shall be placed between the juncture of two sidewalks, at the juncture of a sidewalk and a drive approach, and between the sidewalk and buildings or other rigid structures.
(8) 
After finishing operations have been completed and immediately after the free water has left the surface, the surfaces shall be completely coated and sealed with a uniform layer of white membrane curing compound. The contractor shall restore all disturbed areas to better than or equal to their existing condition within two working days.
(9) 
Any sidewalk which is marked by graffiti, cracks other than at the joints, or otherwise damaged before it has been accepted by the Public Services Director shall be replaced at the contractor's expense.
D. 
General material and construction standards for asphalt sidewalks.
(1) 
Asphalt sidewalks shall be three inches of asphalt (two inches MDOT 13A leveling and one inch MDOT 36A wearing) placed in two lifts, on a six-inch base of MDOT 22A or 21AA crushed limestone. Subgrade shall be proof-rolled for acceptance. In general it shall be free of organic material.
(2) 
Asphalt penetration values shall be 200-250 for sidewalks.
(3) 
Bituminous surfaces shall be cut with a tool (sawcut). Cutting bituminous surfaces for removal shall leave a clean, straight, vertical edge without disturbance to the adjacent pavement.
(4) 
Before placing the bond coat the existing pavement surface, including joints, cracks and edges, shall be thoroughly cleaned to a minimum depth of one inch with compressed air, vac-all type equipment, or other approved mechanical or hand methods, to remove all dirt, debris, and all foreign material.