The reclamation and restoration of the mining and quarrying site shall
be in compliance with all standards and conditions for reclamation and restoring
as provided by the applicable special land use permit.
All excavation-and-operations-in-progress areas shall
be restored to interim restoration areas within 12 months after the cessation
of mining and quarrying operations therein. For the purpose of this subsection,
operations shall be deemed to have ceased for 12 months if no more than 1,000
cubic yards of material has been removed for a 12 month period.
All interim restoration areas shall be fully restored
in accordance with the final restoration provision of the approved operations
and restoration plan within 36 months of the cessation of operations in the
entire parcel approved as a mining and quarrying special land use.
Deviations from the timetable of the restoration plan
and the uses to which the proposed areas will be put shall be permitted only
upon approval of an amended special land use permit.