The Zoning Officer shall review the submission
for completeness and accept or reject the submission as a complete
application for final approval within 45 days of such submission.
If the application is incomplete, the application shall be returned
to the applicant and the Zoning Officer shall state the reason for
the rejection.
Upon final approval, copies of the final site
plan shall be filed by the Planning Board with the following officials:
D. Such other municipal, county or state officials as
directed by the Planning Board.
After the Planning Board approves a site plan
at a public meeting of the Planning Board, such approval shall have
the following effect:
A. All improvements shown on the final site plan approval
plans shall be installed in accordance with the plans.
B. All standard minimum design elements required by this
chapter shall be provided, whether or not they were specifically enumerated
in the site plan approval and whether or not the plan approved indicated
the standard minimum design elements specifically.
C. The site plan approval shall expire two years after
the same was issued if no site plan construction was performed during
said period.
D. Performance and maintenance bonds may be required
and shall be released subject to approval by the Borough Engineer
and the Borough Council.
E. No changes shall be made with respect to any of the
construction and implementation of all improvements shown on the site
plan or required by ordinance or required by the terms and conditions
of any site plan approval and by the terms and conditions, if any,
of any variance granted.
F. Revision and amendment procedures shall be the same as specified for preliminary site plans in §
371-13 hereunder.