No waivers or mitigation plans will be considered
for land disturbance activity that disturbs one acre or greater of
land.
All applicants are required to submit actual
as-built plans for any stormwater management practices located on
site after final construction is completed. The plan must show the
final design specifications for all stormwater management facilities
and must be certified by a New York State licensed professional engineer.
A final inspection by the Town of Henrietta is required before the
release of any performance securities can occur.
All applicants are responsible for maintaining
the grading of the site so that it is consistent with the certified
as-built plans. Any postconstruction alterations to the landscape
shall receive prior approval from the Town of Henrietta. Temporary
landscape alterations, such as those associated with utility excavations
and landscaping activities, must be restored to conditions that are
consistent with the certified as-built plans.