[Ord. #585, § 903A]
Prior to the granting of final approval, the
applicant shall have installed, or furnished performance guaranties
as set forth in section 21-59 for the ultimate installation of, the
improvements described below. All improvements shall be subject to
approval and inspection by the Township Engineer, who shall be notified
by the developer at least two weeks prior to the start of construction
of any improvements and at least 48 hours prior to the completion
of any phase of an installation. No underground installation shall
be covered until inspected and approved.
a. Streets, curbs and sidewalks.
c. Underground electric, gas, telephone and CATV.
d. Surface and stormwater drainage.
k. Test borings (if required).
[Ord. #585, § 903B]
As a condition of final approval, the applicant shall have installed, or furnished performance guaranties as set forth in section 21-59 for the ultimate installation of, any required on-tract improvements as the same are described in subsection
21-60.1. In addition, where residential development is proposed, the Board may, as a condition of final site plan approval, require the installation of certain on-site improvements, as described in subsection
21-60.3 below, prior to the issuance of a construction permit and may require the furnishing of performance guaranties to insure completion of remaining improvements. All such improvements shall be subject to approval and inspection by the Township Engineer.