The Environmental Compliance Consultant shall possess the following
powers and shall perform the following duties:
A. Enter upon the land or site for which construction or
land development approval has been granted, for the purposes of inspecting
the premises and monitoring the construction or land development on the site,
to ensure that all conditions or requirements designed to protect against
or minimize adverse environmental impacts are being complied with.
B. Review approved site plans and other construction permits
and plans and assure that construction and land development conform to the
conditions of those plans.
C. Perform such other duties consistent with this chapter
as may be prescribed in any land development or construction approval or site
plan.
D. Work with and be responsible to the Village Engineer
in connection with the performance of all duties required by this chapter.
E. Where land development or construction approval requires
that, prior to disturbing the land, the holder of such approval shall physically
stake the location of construction activities, wetland boundaries and/or associated
one-hundred-twenty-foot wetland buffers, any areas in which the terrain will
be disturbed and/or the location of any other activity on the site plan, approval
and plans, such staking shall occur subsequent to the granting of a building
permit but not later than 20 days prior to the commencement of land development
or construction activity. Upon completion of the staking, the holder of the
land development or construction permit approval shall notify the Environmental
Compliance Consultant, who shall inspect the staking within 10 days of receipt
of such notification and determine whether the staking is in conformity with
the land development and construction approval and plans.
F. Recommend to the Village Engineer, or such other approval
authority having jurisdiction, the relocation or adjustment, in the field,
of the alignment and location of driveways, roads, utility lines, building
envelopes, any other construction or terrain disturbance in order to prevent
the potential loss of significant terrain functions and to prevent potential
adverse effects on the environment, consistent with the site plan and land
development or construction approval.
G. Advise the Village Engineer where there is a failure
to comply with the conditions or requirements of the land development or construction
permit approval and recommend the taking of appropriate enforcement action
to cure such violation.
If any provision of this chapter shall be held for any reason to be
invalid, such determination shall not invalidate any other provision hereof.