Type
|
Fee
| ||
---|---|---|---|
Building Fees
| |||
Minimum Building Fee
|
$70
| ||
Plan review fee (nonrefundable)
|
20% of permit fee
| ||
New/Addition
| |||
Residential
|
$0.040 per cubic foot
| ||
All other uses
|
$0.050 per cubic foot
| ||
Rehabilitation
|
$30 per $1,000
| ||
Demolition
| |||
One- and two-family
|
$300
| ||
Garage/accessory
|
$100
| ||
Multifamily 3+
|
$400
| ||
(Each unit over 3)
|
Add $50 per unit
| ||
Commercial property up to 1,000 square feet
|
$500
| ||
For each additional 1,000 square feet
|
$50
| ||
Underground storage tanks (removal, closure, install)
| |||
Up to 2,000 gallons
|
$250
| ||
Over 2,000 gallons
|
$400
| ||
Certificate of occupancy (UCC)
|
$100
| ||
Temporary certificate of occupancy renewal
|
$150
| ||
Miscellaneous
| |||
Roofing one- and two-family
|
$85
| ||
Siding one- and two-family
|
$85
| ||
All other roofing and siding (cost of job)
|
$30 per $1,000
| ||
Aboveground pool
|
$150
| ||
In-ground pool
|
$250
| ||
Asbestos
|
$150
| ||
Radon
|
$70
| ||
Retaining walls
| |||
Up to 550 square feet
|
$250
| ||
Over 550 square feet
|
$375
| ||
Signs (all) per square foot
|
$5
| ||
Awnings/canopies (cost of construction)
|
$35 per $1,000
| ||
Construction trailers
|
$150
| ||
Variation Application:
| |||
Class I structures
|
$550
| ||
Class II and Class III structures
|
$250
| ||
Resubmission of Class I through III
|
$150
|
Type
|
Fee
| |
---|---|---|
Electrical Fees
| ||
Minimum permit fee
|
$70
| |
Grouping
| ||
Fixture and devices to be counted for these items include outlets,
wall switches, lighting fixtures, convenience outlets, alarm devices,
emergency lights, exit signs, smoke/CO2 detectors, communication points,
fraction of motors, light poles greater than 8 feet or similar fixtures
and fraction of motors and devices of one kilowatt or less.
| ||
First 25 units
|
$80
| |
Increments of 25 units
|
$35
| |
Pool with lights
|
$13
| |
Spa
|
$13
| |
Calculations
| ||
For the purpose of calculating the following electrical fees,
all motors except those in plug-in appliances shall be counted, including
control equipment, generators, transformers, and all heating, cooking
or other devices consuming or generating electrical current.
| ||
Motors/electrical devices
| ||
Up to 10 HP
|
$80
| |
Up to 50 HP
|
$185
| |
50+ HP and over 100 HP
|
$650
| |
Transformers/generators
| ||
Up to 10 KW
|
$90
| |
Up to 45 KW
|
$205
| |
Up to 112.5 KW
|
$350
| |
Over 112.5 KW
|
$450
| |
Photovoltaic system
| ||
1 to 20 panels
|
$60
| |
Each additional 20 panels
|
$30
| |
1 to 10 KW
|
$60
| |
11 to 50 KW
|
$90
| |
51 to 100 KW
|
$120
| |
Greater than 100 KW
|
$576
| |
Services/panels/subpanels
| ||
Up to 200 amps
|
$150
| |
Up to 300 amps
|
$175
| |
Up to 400 amps
|
$350
| |
Up to 500 amps
|
$470
| |
Up to 800 amps
|
$920
| |
Over 800 amps
|
$1,500
| |
Temporary electric poles
|
$95
| |
Range/oven/surface unit
|
$30
| |
Dishwasher/dryer
|
$30
| |
Water heater
|
$30
| |
Garbage disposal replacement
|
$30
| |
Intercom
|
$30
| |
A/C units (residential)
|
$75
| |
A/C units (commercial)
|
$125
| |
Visual bonding
|
$50
| |
Heating unit
|
$30
| |
Pool bonding
|
$150
| |
Baseboard heat (KW size)
|
$35
| |
Outdoor lights less than 8 feet
|
$100
| |
Heat pump
|
HP size
| |
Whirlpool/spa
|
By HP
| |
Pool filter
|
By HP
|
Type
|
Fee
| ||
---|---|---|---|
Plumbing Fees
| |||
Minimum permit fee
|
$70
| ||
For the purpose of clarification, special devices include grease
traps, oil separators, water-cooled air-conditioning units, refrigeration
units, utility service connections, backflow preventers, steam boilers,
hot water boilers (excluding those for domestic water heating), gas
service piping, sewer pumps, interceptors, and fuel oil piping.
| |||
Water closet
|
$30
| ||
Bidet/urinal
|
$30
| ||
Bathtub
|
$30
| ||
Lavatory/sink
|
$30
| ||
Shower
|
$30
| ||
Floor drain
|
$30
| ||
Sink
|
$30
| ||
Dishwasher
|
$30
| ||
Washer
|
$30
| ||
Hose bib
|
$30
| ||
Fuel oil piping
|
$35
| ||
Sump pump
|
$30
| ||
Condensate drain
|
$30
| ||
Garbage disposal
|
$30
| ||
Stacks
|
$30
| ||
Gas appliance connection
|
$40
| ||
Sewer pump
|
$100
| ||
Interceptor/separator
|
$100
| ||
Hot water boiler
|
$100
| ||
Steam boiler
|
$100
| ||
Hot water heater
|
$100
| ||
Sewer connection, 4 inches to 5 inches
|
$100
| ||
Gas service connection
|
$100
| ||
Grease trap
|
$100
| ||
Water-cooled A/C
|
$100
| ||
Backflow Preventer
| |||
1/2 inch to 1 inch
| |||
Residential
|
$75
| ||
Commercial
|
$175
| ||
1 1/4 inches to 3 inches
| |||
Residential
|
$125
| ||
Commercial
|
$225
| ||
Yearly backflow certification, all types
|
$100
| ||
Water service installation/replacement
| |||
3/4 inch to 2 inches
|
$100
| ||
2+ inches to 4 inches
|
$250
| ||
All services above 4 inches
|
$400
| ||
Sewer Installation/Replacement
| |||
4 inches to 5 inches
|
$100
| ||
6 inches
|
$250
| ||
All pipe over 6 inches
|
$500
|
Type
|
Fee
| ||
---|---|---|---|
Fire Fees
| |||
Minimum permit fee
|
$70
| ||
Plan review/inspection
| |||
Residential plan review/inspection, each new unit
|
$100 base plus $100 each unit review/inspection fee plus $2
per protection/detection device plus additional fees below
| ||
Commercial use
| |||
Up to 5,000 square feet
|
$500 review/inspection fee plus $2 per fire protection/detection
device plus additional fees below
| ||
Over 5,000 square feet
|
$1,000 review/inspection fee plus $2 per fire protection/detection
device plus additional fees below
| ||
Hotel/motel, each unit
|
$100 base plus $100 each unit review/inspection fee plus $2
protection/detection device plus additional fees below
| ||
Renovation, commercial use
|
$200 review/inspection fee plus $2 per protection/detection
device plus additional fees below
| ||
Pre-engineered system
| |||
Minimum fee
|
$100
| ||
Halon, CO2, foam, wet, dry chemical fee
|
$25 per $1,000 of construction
| ||
Fire alarm control panel (FAC)
|
$500
| ||
Fire pump
|
$500
| ||
Commercial hood system
|
$300
| ||
Commercial hood suppression system
|
$300
| ||
Gas/oil appliance
|
$100
| ||
Chimney pipe liner
|
$100
| ||
Dry pipe alarm
|
$50
| ||
Standpipe
|
$350
| ||
Signaling devices
|
$85
| ||
Fuel storage tank removal, closure, installation
| |||
Up to 2K
|
$250
| ||
Over 2K
|
$400
| ||
Pre-action valve
|
$50
| ||
Supervisory devices
|
$50
| ||
Any fire protection or detection device
| |||
Smoke, carbon, sprinkler heads, exit lights, etc.
|
$2
|
Type
|
Fee
| ||
---|---|---|---|
Elevator fees
| |||
Plan review
| |||
R-2, R-3, R-4
|
$76
| ||
All other use groups
|
$365
| ||
Witnessing acceptance and performing inspection
| |||
Traction and winding drum
| |||
1 through 10 floors
|
$440
| ||
Over 10 floors
|
$570
| ||
Dumbwaiters, chairlifts
|
$180
| ||
Hydraulic elevators/escalators
|
$302
| ||
Roped hydraulic elevators
|
$340
| ||
Six-month routine cycle inspection
| |||
Traction and winding drum elevators
| |||
1 through 10 floors
|
$211
| ||
Over 10 floors
|
$271
| ||
Hydraulic elevators
|
$151
| ||
Roped hydraulic escalators, moving walks
|
$211
| ||
One-year periodic inspection and witnessing of tests, includes
six-month routine inspection
| |||
1 through 10 floors
|
$400
| ||
Over 10 floors
|
$450
| ||
Hydraulic elevators
|
$350
| ||
Roped hydraulic elevator
|
$375
| ||
Escalator, moving walks
|
$695
| ||
Manlifts, chairlifts
|
$183
| ||
Dumbwaiters
|
$182
| ||
Three- and five-year inspection
| |||
Hydraulic and roped elevators
| |||
Three-year
|
$387
| ||
Five-year
|
$425
| ||
Traction and drum winding elevators
| |||
1 through 10 floors, five-year
|
$513
| ||
Over 10 floors, five-year
|
$649
| ||
Additional charges for any of the above
| |||
Oil buffers
|
$60
| ||
Counterweights, governor safetys
|
$151
| ||
Auxiliary generators
|
$114
| ||
Inspections
| |||
Inspection of minor work
|
$76
| ||
Reinspection fee
|
$203
| ||
Type
|
Fees
| ||
Miscellaneous Fees
| |||
Business CCO
|
$400
| ||
All residential property rental certificates
|
$50 per unit
| ||
Resales
| |||
One-family, condo, co-op
|
$50
| ||
Two-family
|
$100
| ||
Multidwelling
| |||
First unit
|
$100
| ||
Each additional unit
|
$50
| ||
Zoning review letters and all other letters
|
$100
| ||
Dumpster
| |||
On public property
|
$15 per day
| ||
On private property
|
No fee
| ||
Businesses
| |||
To 5,000 square feet
|
$500
| ||
Each additional 1,000 square feet
|
$100
| ||
All reinspection fees
|
$50
| ||
Fences up to 6 feet
|
$100
| ||
Sheds up to 200 square feet
|
$100
| ||
Change of contractor
|
$100
| ||
Mechanical Fees
| |||
Minimum permit fee
|
$70
| ||
Water heaters
|
$100
| ||
Fuel oil piping connections
|
$35
| ||
Gas piping connections
|
$40
| ||
Steam boiler
|
$100
| ||
Hot water boiler
|
$100
| ||
Hot air furnace
|
$100
| ||
Oil tank installation - up to 275 gallons
|
$250
| ||
Oil tank installation - 276 through 2,000 gallons
|
$500
| ||
HVAC unit (per unit)
|
$75
| ||
Fireplace
|
$75
|