Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Clinton, NJ
Hunterdon County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Amended by Ord. No. 235-84]
A. 
The flood hazard areas of Clinton Township are subject to periodic inundation which could result in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.
B. 
These flood losses are caused by the cumulative effect of obstructions in areas of special flood hazard which increase flood heights and velocities and, when inadequately anchored, cause damage in other areas. Uses that are inadequately elevated, floodproofed, or otherwise protected from flood damage also contribute to the flood loss.
[Amended 9-9-2009 by Ord. No. 990-09]
It is the purpose of this article to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:
A. 
Protect human life and health;
B. 
Minimize expenditure of public money for costly flood control projects;
C. 
Minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
D. 
Minimize prolonged business interruptions;
E. 
Minimize damage to public facilities and utilities, such as water and gas mains, electric, telephone and sewer lines, and streets and bridges located in floodplains;
F. 
Help maintain a stable tax base by providing for the sound use and development of flood-prone areas in such a manner as to minimize future flood blight areas;
G. 
Ensure that potential home buyers are notified that property is in a flood area.
H. 
Ensure that those who occupy the areas of special flood hazard assume responsibility for their actions.
[Added 9-9-2009 by Ord. No. 990-09]
In order to accomplish its purposes, this article uses the following methods:
A. 
Restricting or prohibiting uses which are dangerous to health, safety and property due to water or erosion hazards or which result in damaging increases in erosion or in flood heights or velocities.
B. 
Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction.
C. 
Controlling the alteration of natural floodplains, stream channels and natural protective barriers which are involved in the accommodation of floodwaters.
D. 
Controlling filling, grading, dredging and other development which may increase flood damage.
E. 
Preventing or regulating the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands.
Unless specifically defined below, words or phrases used in this section shall be interpreted so as to give them the meanings they have in common usage and to give this article its most reasonable application. As used in this article, the following terms shall have the meanings indicated:
APPEAL
A request for review of the Township Engineer's interpretation of any provision of this article or a request for a variance.
AREA OF SHALLOW FLOODING
A designated AO, AH, or VO Zone on a community's Flood Insurance Rate Map (FIRM), with base flood depths from one to three feet, where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
[Amended 9-9-2009 by Ord. No. 990-09]
AREA OF SPECIAL FLOOD HAZARD
The land in the floodplain within a community subject to a one-percent or greater chance of flooding in any given year.
BASE FLOOD
The flood having a one-percent chance of being equaled or exceeded in any given year.
BASEMENT
Any area of the building having its floor subgrade (below ground level) on all sides.
BREAKAWAY WALL
A wall that is not part of the structural support of the building and is intended, through its design and construction, to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or supporting foundation system.
DEVELOPMENT
Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations located within the area of special flood hazard.
DIGITAL FLOOD INSURANCE RATE MAP
Official map on which the Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the community.
[Added 9-9-2009 by Ord. No. 990-09]
ELEVATED BUILDING
A nonbasement building which is built in the case of a building in an area of special flood hazard to have the top of the elevated floor elevated above the ground level by means of piling, columns (posts and piers) or shear walls parallel to the flow of the water, and which is adequately anchored so as not to impair the structural integrity of the building during a flood of up to the magnitude of the base flood. In an area of special flood hazard, elevated building also includes a building elevated by means of fill or solid foundation perimeter walls with openings sufficient to facilitate the unimpeded movement of floodwaters.
[Amended 9-9-2009 by Ord. No. 990-09]
FLOOD or FLOODING
A general and temporary condition of partial or complete inundation of normally dry land areas from:
A. 
The overflow of inland or tidal waters.
B. 
The unusual and rapid accumulation or runoff of surface waters from any source.
FLOOD INSURANCE RATE MAP (FIRM)
The official map on which the Federal Insurance Administration has delineated both the areas of special flood hazard and the risk premium zones applicable to the Township.
FLOOD INSURANCE STUDY
The official report in which the Federal Insurance Administration has provided flood profiles, as well as the Flood Insurance Rate Map and the water surface elevation of the base flood.
[Amended 9-9-2009 by Ord. No. 990-09]
FLOODPLAIN MANAGEMENT REGULATIONS
Zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances (such as a floodplain ordinance, grading ordinance and erosion control ordinance) and other applications of police power. The term describes such state or local regulations, in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction.
[Added 9-9-2009 by Ord. No. 990-09]
FLOODWAY
The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than 0.2 foot.
HIGHEST ADJACENT GRADE
The highest natural elevation of the ground surface, prior to construction, next to the proposed walls of a structure.
[Added 9-9-2009 by Ord. No. 990-09]
HISTORIC STRUCTURE
Any structure that is:
[Added 9-9-2009 by Ord. No. 990-09]
A. 
Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
B. 
Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;
C. 
Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or
D. 
Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either:
(1) 
By an approved state program as determined by the Secretary of the Interior; or
(2) 
Directly by the Secretary of the Interior in states without approved programs.
LOWEST FLOOR
The lowest floor of the lowest enclosed area, including basement. An unfinished or flood-resistant enclosure usable solely for the parking of vehicles, building access or storage in an area other than a basement is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other applicable nonelevation design requirements.
MANUFACTURED HOME
A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes, the term "manufactured home" also includes park trailers, travel trailers and other similar vehicles placed on a site for greater than 180 consecutive days. For insurance purposes, the term "manufactured home" does not include park trailers, travel trailers, recreational vehicles, and other similar vehicles.
[Amended 9-9-2009 by Ord. No. 990-09]
MANUFACTURED HOME PARK or MANUFACTURED HOME SUBDIVISION
A parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
NEW CONSTRUCTION
Structures for which the start of construction commenced on or after the effective date of this article and includes any subsequent improvements to such structures.
[Amended 9-9-2009 by Ord. No. 990-09]
NEW MANUFACTURED HOME PARK OR SUBDIVISION
A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of the floodplain management regulations adopted by the municipality.
[Added 9-9-2009 by Ord. No. 990-09]
RECREATIONAL VEHICLE
A vehicle which is:
[Added 9-9-2009 by Ord. No. 990-09]
A. 
Built on a single chassis;
B. 
Four hundred square feet or less when measured at the longest horizontal projections;
C. 
Designed to be self-propelled or permanently towable by a light-duty truck, car or similar vehicle; and
D. 
Designed primarily for use not as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
START OF CONSTRUCTION
For other than new construction or substantial improvements under the Coastal Barrier Resources Act, P.L. 97-348,[1] includes substantial improvement and shall mean the date the construction permit was issued, provided that the actual start of the construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement was within 180 days of the permit date. The "actual start" means either the first placement of permanent construction of a structure on a site such as the pouring of a slab or footings, the installation of piles, the construction of columns, or any work beyond the excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation such as clearing, grading, and filling, nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
[Amended 9-9-2009 by Ord. No. 990-09]
STRUCTURE
A walled and roofed building, a manufactured home, or a gas or liquid storage tank, that is principally above ground.
[Amended 9-9-2009 by Ord. No. 990-09]
SUBSTANTIAL DAMAGE
Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed 50% of the market value of the structure before the damage occurred.
[Added 9-9-2009 by Ord. No. 990-09]
SUBSTANTIAL IMPROVEMENT
Any repair, reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50% of the market value of the structure either before the improvement or repair is started or, if the structure has been damaged and is being restored, before the damage occurred. The repair of substantial damage shall be considered a substantial improvement. For the purpose of this definition, substantial improvement is considered to occur when the alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. The term does not, however, include either:
[Amended 9-9-2009 by Ord. No. 990-09]
A. 
Any project for improvement of a structure to comply with existing state of local health, sanitary or safety code specifications which are solely necessary to assure safe living conditions; or
B. 
Any alteration of an historic structure, provided that the alteration will not preclude the structure's continued designation as an historic structure.
VARIANCE
A grant of relief to a person from the requirements of this chapter which permits construction in a manner otherwise prohibited by this section where specific enforcement would result in unnecessary hardship.
[1]
Editor's Note: See 16 U.S.C. § 3501 et seq.
This article shall apply to all areas of special flood hazard within the jurisdiction of Clinton Township.
[Amended 9-9-2009 by Ord. No. 990-09]
A. 
The areas of special flood hazard for the Township of Clinton, Community No. 340505, are identified and defined on the following documents prepared by the Federal Emergency Management Agency:
(1) 
A scientific and engineering report, "Flood Insurance Study, Hunterdon County, New Jersey (All Jurisdictions)," dated September 25, 2009;
(2) 
Flood Insurance Rate Map for Hunterdon County, New Jersey (All Jurisdictions) as shown on Index and panel numbers 34019C0116F, 34019C0117F, 34019C0118F, 34019C0119F, 34019C0128F, 34019C0129F, 34019C0138F, 34019C0139F, 34019C0140F, 34019C0141F, 34019C0143F, 34019C0231F, 34019C0235F, 34019C0253F, 34019C0255F, 34019C0256F; whose effective date is September 25, 2009.
B. 
The above documents are hereby adopted and declared to be part of this ordinance. The Flood Insurance Study and maps are on file at the Township Clerk’s office, Clinton Township Municipal Building, 1225 Route 31 South, Suite 411, Building D, Lebanon, New Jersey 08833.
No structure or land shall hereafter be constructed, located, extended, converted or altered without full compliance with the terms of this section and other applicable regulations. Violation of the provisions of this article by failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor. Any person who violates this section or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than $1,000 or imprisoned for not more than 90 days in jail, or both, for each violation, and in addition shall pay all costs and expenses involved in the case. Nothing herein contained shall prevent the Township from taking such other lawful action as is necessary to prevent or remedy any violation.
This article is not intended to repeal, abrogate or impair any existing easements, covenants or deed restrictions. However, where this section and another ordinance, easement, covenant or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
In the interpretation and application of this article, all provisions shall be:
A. 
Considered as minimum requirements.
B. 
Liberally construed in favor of the governing body.
C. 
Deemed neither to limit nor repeal any other powers granted under state statutes.
[Amended 9-9-2009 by Ord. No. 990-09]
The degree of flood protection required by this section is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by man-made or natural causes. This article does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This article shall not create liability on the part of Clinton Township or by any officer or employee thereof, or on the Federal Insurance Administration, for any flood damages that result from reliance on this article or any administrative decision lawfully made thereunder.
A development permit shall be obtained before construction or development begins within any area of special flood hazard established in § 165-212. Application for a development permit shall be made to the Township Engineer on forms furnished by him/her and may include, but not be limited to, the following plans in duplicate, drawn to scale, showing the nature, location, dimensions and elevations of the area in question; existing or proposed structures, fill, storage of materials, drainage facilities; and the location of the foregoing. Specifically, the following information is required:
A. 
Elevation in relation to mean sea level of the lowest floor (including basement) of all structures.
B. 
Elevation in relation to mean sea level to which any nonresidential structure has been floodproofed.
C. 
Plan showing how any nonresidential floodproofed structure will meet the floodproofing criteria of § 165-221B and, after the structure is built, a certification by a registered professional engineer or architect that the structure as built meets the criteria of § 165-221B.
D. 
A description of the extent to which any watercourse will be altered or relocated as a result of proposed development.
[Amended by Ord. No. 345-87]
A. 
Designation. The Township Engineer is hereby appointed to administer and implement this article by granting or denying development permit applications in accordance with its provisions.
B. 
Powers and duties. Duties of the Township Engineer shall include, but not be limited to:
[Amended 9-9-2009 by Ord. No. 990-09]
(1) 
Permit review. The Township Engineer shall:
(a) 
Review all development permits to determine that the permit requirements of this article have been satisfied.
(b) 
Review all development permits to determine that all necessary permits have been obtained from those federal, state or local governmental agencies from which prior approval is required.
(c) 
Review all development permits to determine if the proposed development is located in the floodway and to ensure that the encroachment provisions of § 165-222A are met.
(2) 
Use of other base flood data. When base flood elevation and floodway data have not been provided in accordance with § 165-212, the Township Engineer shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source in order to administer § 165-221A and B.
(3) 
Information to be obtained and maintained. The Township Engineer shall:
(a) 
Verify and record the actual elevation (in relation to the mean sea level) of the lowest floor (including basement) of all new or substantially improved structures and whether or not the structure contains a basement.
(b) 
For all new or substantially improved floodproofed structures:
[1] 
Verify and record the actual elevation (in relation to mean sea level); and
[2] 
Maintain the floodproofing certifications required in § 165-217C.
(c) 
Maintain for public inspection all records pertaining to the provisions of this article.
(4) 
Interpretation of FIRM boundaries. The Township Engineer shall make interpretation, where needed, as to the exact location of the boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions). The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article.
(5) 
Alteration of watercourses. The Township Engineer shall:
(a) 
Notify adjacent communities and the New Jersey Department of Environmental Protection, Dam Safety and Flood Control Section and the Land Use Regulation Program prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administration.
(b) 
Require that maintenance is provided within the altered or relocated portion of said watercourse so the flood-carrying capacity is not diminished.
[Amended by Ord. No. 345-87]
A. 
Appeal Board.
(1) 
The Township Council shall hear and decide appeals and requests for variances from the requirements of this article.
(2) 
The Township Council shall hear and decide appeals when it is alleged that there is an error in any requirement, decision or determination made by the Township Engineer in the enforcement or administration of this article.
(3) 
Any person aggrieved by the decision of the Township Council may appeal such decision to the Superior Court of New Jersey pursuant to law and applicable rules of the court.
(4) 
In passing upon such applications, the Township Council shall consider all technical evaluations, all relevant factors, standards specified in other sections of this chapter, and:
(a) 
The danger that materials may be swept onto other lands to the injury of others;
(b) 
The danger to life and property due to flooding or erosion damage;
(c) 
The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner;
(d) 
The importance of the services provided by the proposed facility to the community;
(e) 
The necessity to the facility of a waterfront location, where applicable;
(f) 
The availability of alternative locations not subject to flooding or erosion damage for the proposed use;
(g) 
The compatibility of the proposed use with existing and anticipated development;
(h) 
The relationship of the proposed use to the Comprehensive Plan and floodplain management program for that area;
(i) 
The safety of access to the property in times of flood for ordinary and emergency vehicles;
(j) 
The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters expected at the site; and
(k) 
The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges.
(5) 
Upon consideration of the factors listed above and the purposes of this article, the Township Council may attach such conditions to the granting of variances as it deems necessary to further the purposes of this article.
(6) 
The Township Engineer shall maintain the records of all appeal actions, including technical information, and report any variance to the Federal Insurance Administration upon request.
[Amended 9-9-2009 by Ord. No. 990-09]
B. 
Conditions for variances.
(1) 
Generally, variances may be issued for new construction and substantial improvements to be erected on a lot of 1/2 acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood level, provided that provisions of Subsection A(4)(a) through (k) have been fully considered. As the lot size increases beyond the 1/2 acre, the technical justification required for issuing the variance increases.
(2) 
Variances may be issued for reconstruction, rehabilitation or restoration of historic structures without regard to the procedures set forth in the remainder of this subsection, provided that the change does not preclude the structure's continued designation as an historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure.
[Amended 9-9-2009 by Ord. No. 990-09]
(3) 
Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.
(4) 
Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief.
(5) 
Variances shall only be issued upon:
(a) 
A showing of good and sufficient cause;
(b) 
A determination that failure to grant the variance would result in exceptional hardship to the applicant; and
(c) 
A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public as identified in § 165-219A, Appeal Board, or conflict with existing local laws or ordinances.
(6) 
Any applicant to whom a variance is granted shall be given written notice that the structure will be permitted to be built with a lowest floor elevation below the base flood elevation, and that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation.
[Amended by Ord. No. 345-87]
In all areas of special flood hazard the following provisions are required:
A. 
Anchoring.
(1) 
All new construction and substantial improvements shall be anchored to prevent flotation, collapse or lateral movement of the structure.
(2) 
All manufactured homes shall be anchored to resist flotation, collapse or lateral movement. Methods of anchoring may include but are not to be limited to use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable State and local anchoring requirements for resisting wind forces.
B. 
Construction materials and methods.
(1) 
All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.
(2) 
All new construction of substantial improvements shall be constructed by methods and practices that minimize flood damage.
C. 
Utilities.
(1) 
All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system;
(2) 
New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters; and
(3) 
On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding.
(4) 
Electrical, heating, ventilation, plumbing and air-conditioning equipment and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
D. 
Subdivision proposals.
(1) 
All subdivision proposals shall be consistent with the need to minimize flood damage.
(2) 
All subdivision proposals shall have public utilities and facilities, such as sewer, gas, electrical and water systems, located and constructed to minimize flood damage.
(3) 
All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage.
(4) 
Base flood elevation data shall be provided for subdivision proposals and other proposed development which is greater than the lesser of 50 lots or five acres.
E. 
Enclosure openings. For all new construction and substantial improvements, fully enclosed areas below the lowest floor that are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or must meet or exceed the following minimum criteria:
(1) 
A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided.
(2) 
The bottom of all openings shall be no higher than one foot above grade.
(3) 
Openings may be equipped with screens, louvers or other coverings or devices, provided that they permit the automatic entry and exit of floodwaters.
[Amended by Ord. No. 345-87; 9-9-2009 by Ord. No. 990-09]
In all areas of special flood hazard where base flood elevation data has been provided as set forth in § 165-212, Basis for establishing areas of special flood hazard, or in § 165-218B(2), Use of other base flood data, the following standards are required:
A. 
Residential construction. New construction or substantial improvement of any residential structure shall:
(1) 
Have the lowest floor, including basement, together with the attendant utilities and sanitary facilities, elevated one foot above the base flood elevation;
(2) 
Within any AO Zone on the municipality's FIRM, have the lowest floor, including basement, elevated above the highest adjacent grade at least as high as the depth number specified in feet (at least two feet if no depth number is specified), and adequate drainage paths shall be required around structures on slopes to guide floodwaters around and away from proposed structures.
B. 
Nonresidential construction. New construction and substantial improvement of any commercial, industrial or other nonresidential structure shall:
(1) 
Either have the lowest floor, including basement, together with attendant utility and sanitary facilities, elevated one foot above the base flood elevation; or
(2) 
Within any AO Zone on the municipality's FIRM, have the lowest floor, including basement, elevated above the highest adjacent grade at least as high as the depth number specified in feet (at least two feet if no depth number is specified), and adequate drainage paths shall be required around structures on slopes to guide floodwaters around and away from proposed structures; or
(3) 
Floodproofing;
(a) 
Be floodproofed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water.
(b) 
Have structural components capable of resisting hydrostatic and hydrodynamic loads and effects of buoyancy.
(c) 
Be certified by a registered professional engineer or architect that the design and methods of construction are in accordance with accepted standards of practice for meeting the applicable provisions of this subsection. Such a certification shall be provided to the Township Engineer as set forth in § 165-218B(3)(b).
C. 
Manufactured homes.
(1) 
Manufactured homes shall be anchored in accordance with § 165-220A.
(2) 
All manufactured homes to be placed or substantially improved within an area of special flood hazard shall be elevated on a permanent foundation such that the top of the lowest floor is at or above the base flood elevation.
Located within areas of special flood hazard established in § 165-212 are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of floodwaters which carry debris, potential projectiles and erosion potential, the following provisions apply:
A. 
Encroachments shall be prohibited, including fill, new construction, substantial improvements and other development, unless a technical evaluation demonstrates that encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge.
B. 
If Subsection A is satisfied, all new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of §§ 165-220 through 165-222.
C. 
The placement of any mobile homes, except in an existing mobile home park or existing mobile home subdivision, shall be prohibited.
D. 
In all areas of special flood hazard in which base flood elevation data has been provided and no floodway has been designated, the cumulative effect of any proposed development, when combined with all other existing and anticipated development, shall not increase the water surface elevation of the base flood more than 0.2 foot at any point.