The Administrator shall notify, by written communication, each property owner whose septic tank requires monitoring to determine sludge accumulations in the septic tanks and/or removal of accumulated septic tank sludges. Such notice shall be provided to the affected property owner no less than two weeks prior to the date of monitoring and/or removal of sludge and shall indicate the date and associated reasoning (monitoring and/or removal of sludge) for such entrance onto the affected property easement area.
The Administrator shall conduct a sludge monitoring inspection of each property owner's septic tank at least once a year for the purpose of identifying inordinate sludge accumulations and physical conditions within the septic tank. Such an inspection will, in all cases, be preceded by notification as presented in § 121-32.
A. 
The Administrator shall develop a program to complete the sludge removal within 1/3 of the total number of septic tanks contained within the Briscoe Road Sewer District each year and 1/4 of the total number of septic tanks contained within the Loomis Sewer District and Loomis Extension Sewer District each year. Such a sludge removal program will be completed within a three-week period each year.
B. 
If the Administrator determines from monitoring inspections as described in § 121-33 that a septic tank requires sludge removals more frequently than previously mentioned, the Administrator shall complete sludge removals at those septic tanks at such time frames as shall be necessary for continued satisfactory septic tank operation.
C. 
All sludge removals shall be preceded by notification as presented in § 121-32.