All installed fixtures found unsanitary or not
properly equipped to prevent fouling of the water supply shall be
replaced, renovated, repaired or removed within 30 days upon written
notice from the Inspector.
Suitable toilet facilities shall be provided
for the use of workmen during the construction of any building. These
toilet facilities shall be maintained in a sanitary condition.