home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Town of Manchester, NY
chevron_right
2023-01-10
info
chevron_right
Index: S
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
S
add
Safety standards
§ 9-2 — Authority to issue.
§ 101-1 — Purpose.
§ 101-4 — License application procedures.
§ 101-5 — Grounds for denial or revocation of license.
§ 104-1 — Purpose.
§ 106-3 — Determination; intent.
§ 106-10 — Purpose.
§ 112-1 — Purpose.
§ 112-3 — Permit required; application.
§ 118-1 — Purpose.
123-2{10} — FIRE SAFETY AND PROPERTY MAINTENANCE INSPECTION
§ 123-3 — Code Enforcement Officer and inspectors.
§ 123-4 — Building permits.
§ 123-7 — Certificates of occupancy and certificates of compliance.
§ 123-10 — Operating permits.
§ 123-11 — Fire safety and property maintenance inspections.
§ 123-13 — Condition assessments of parking garages.
§ 123-18 — Fees.
§ 128-9 — Emergency cases.
§ 154-1 — Intent and purpose.
§ 181-2 — Purpose.
181-4B{34} — SUBSTANTIAL IMPROVEMENT
§ 181-7 — Interpretation; conflict with other laws.
§ 181-16 — Appeals Board.
§ 181-17 — Conditions for variances.
§ 217-2 — Purpose; intent.
§ 217-5 — Applicability to existing manufactured home parks.
§ 217-11 — General requirements.
§ 217-37 — Purpose.
§ 217-43 — Mobile home park standards.
§ 217-52 — Replacement mobile homes; inspection.
§ 217-70 — Revocation of license.
§ 229-2 — Purpose.
§ 246-1 — Intent and purpose.
246-4{14} — PROTECTIVE SURFACING
§ 246-5 — General requirements.
§ 246-6 — Alternative parks.
§ 246-7 — Inspection of playgrounds or recreation areas.
§ 252-2 — Intent.
§ 252-3 — Scope and applicability.
§ 252-5 — Maintenance.
§ 252-7 — Historic buildings.
§ 252-14 — Unsafe structures, premises and equipment.
§ 252-15 — Emergency measures.
§ 252-23 — Exterior structures.
§ 252-24 — Open areas and land.
§ 263-1 — Purpose.
§ 266-2 — Findings.
§ 266-3 — Purpose.
§ 266-11 — Application contents.
§ 266-12 — Application decision criteria.
§ 266-15 — Penalties for offenses; enforcement.
§ 269-1 — Findings of fact.
§ 269-2 — Purpose.
§ 269-3 — Statutory authority.
§ 269-8 — Construction inspection.
§ 275-3 — Purpose.
§ 275-19 — Lots and lot sizes.
§ 275-20 — Street system layout.
§ 275-21 — Street intersections.
§ 275-24 — Water supply.
§ 275-31 — Minimum improvements.
§ 275-33 — Streets and sidewalks.
§ 292-3 — Authority to remove.
§ 297-1 — Legislative intent.
§ 297-2 — Purpose.
297-3{3} — NUISANCE
§ 325-10.5 — Purposes.
§ 325-22.5 — Lot, area, and setback requirements.
§ 325-22.7 — REI district performance standards.
§ 325-24.2 — Purpose statements.
§ 325-30.2 — Purpose statement.
§ 325-30.5 — FPO permit application procedures.
§ 325-30.7 — FPO permit process.
§ 325-31.1 — Intent and purpose.
§ 325-31.4 — Access provisions.
§ 325-31.5 — Driveway location and design.
§ 325-40.1 — Purpose and applicability.
§ 325-40.2 — Accessory structures and uses.
§ 325-40.10 — Campgrounds.
§ 325-40.17 — Farm stands.
§ 325-40.18 — Fences.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-40.20 — Home occupations.
§ 325-40.28 — Ponds.
§ 325-40.30 — Temporary storage units.
§ 325-40.31 — Telecommunications facilities.
§ 325-40.32 — Truck and multimodal transport terminals.
§ 325-50.1 — Purpose and intent.
§ 325-50.5 — Toxic matter.
§ 325-51.5 — Access management.
§ 325-51.6 — Minimum parking space requirements.
§ 325-52.1 — Purpose and intent.
§ 325-52.2 — Applicability.
§ 325-52.7 — Safety provisions.
§ 325-52.14 — Signs authorized without a permit.
§ 325-52.18 — Nonconforming signs.
§ 325-54.1 — Purpose and intent.
§ 325-55.1 — Intent and purpose.
§ 325-55.6 — Specific requirements/standards.
§ 325-55.10 — Nonconforming lighting.
§ 325-56.6 — Transitions between nonresidential and residential uses.
§ 325-60.3 — Application submittal.
§ 325-60.5 — Action by review and decision-making bodies.
§ 325-61.6 — Review criteria.
§ 325-62.6 — Modifications to site plans.
§ 325-64.5 — Review criteria.
§ 325-65.3 — Use variances.
§ 325-65.4 — Area variances.
§ 325-67.1 — Town Board.
325-70.2{101} — ESSENTIAL SERVICES
325-70.2{139} — HAZARDOUS MATERIAL
325-70.2{167} — MANUFACTURED HOME
325-70.2{234} — SIGN
325-70.2{250} — SPECIAL USE OR SPECIALLY PERMITTED USE
325-70.2{260} — SUBSTANTIAL IMPROVEMENT
add
Salaries and compensation
§ 1-4 — Enactments saved from repeal; matters not affected.
§ DL-1 — Disposition of legislation.
add
Sales
§ 1-4 — Enactments saved from repeal; matters not affected.
§ 1-9 — Sale of Code book; supplementation.
101-2{1} — ADULT BOOKSTORE
§ 112-3 — Permit required; application.
167-3B{3} — AGRICULTURAL PRACTICES
181-4B{20} — FUNCTIONALLY DEPENDENT USE
§ 196-6 — Topsoil removal.
§ 217-35 — Sale of lots.
Ch 240 — Peddling and Soliciting
240-1{2} — HAWKER AND PEDDLER
240-1{3} — SOLICITOR
§ 240-2 — Exemptions.
§ 240-14 — Prohibited acts.
Ch 263 — Sales and Storage, Outdoor
§ 263-1 — Purpose.
§ 263-3 — Prohibited acts.
§ 263-4 — Exceptions.
§ 263-5 — Presumptive evidence.
269-7{1} — AGRICULTURAL ACTIVITY
269-7{16} — LAND DEVELOPMENT ACTIVITY
§ 275-7 — Enforcement; penalties for offenses.
275-8{78} — SUBDIVISION
Ch 297 — Vehicles, Disabled or Abandoned
§ 300-42 — Sale of water; permit required.
§ 300-43 — Sale of water outside district.
§ 325-21.3 — Permitted and specially permitted uses.
§ 325-22.3 — Permitted and specially permitted uses.
§ 325-24.4 — Manufactured home park regulations.
§ 325-25.3 — Permitted and specially permitted uses.
§ 325-40.2 — Accessory structures and uses.
§ 325-40.5 — Airports or heliports.
§ 325-40.6 — Automotive sales.
§ 325-40.7 — Automotive service or repair shops and gasoline stations.
§ 325-40.9 — Breweries, wineries, or distilleries.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-40.20 — Home occupations.
§ 325-40.25 — Outdoor recreation facilities.
§ 325-40.26 — Outdoor sales or display.
§ 325-40.32 — Truck and multimodal transport terminals.
§ 325-51.6 — Minimum parking space requirements.
325-70.2{28} — AUTOMOTIVE SALES
325-70.2{58} — COMMERCIAL USE
325-70.2{68} — DANCE, ART, PHOTO, OR MUSIC STUDIO
325-70.2{107} — FARM STAND
325-70.2{128} — GARAGE, LAWN, YARD, OR RUMMAGE SALE
325-70.2{130} — GASOLINE STATION
325-70.2{142} — HOME OCCUPATION, AGRICULTURAL
325-70.2{143} — HOME OCCUPATION, RESIDENTIAL
325-70.2{166} — LUMBERYARD
325-70.2{186} — OUTDOOR SALES OR DISPLAY
325-70.2{188} — OUTDOOR STORAGE
325-70.2{198} — PERSONAL SERVICE SHOPS
325-70.2{210} — RECREATIONAL FACILITY, INDOOR
325-70.2{211} — RECREATIONAL FACILITY, OUTDOOR
325-70.2{214} — RESEARCH AND DEVELOPMENT FACILITY OR LABORATORY
325-70.2{219} — RETAIL STORE
325-70.2{259} — SUBDIVISION
325-70.2{283} — USE, CHANGE OF
325-70.2{288} — WAREHOUSE
add
Sanitary facilities
181-4B{17} — FLOODPROOFING
§ 181-14 — Specific standards.
§ 275-25 — Septic or sewage system.
325-70.2{116} — FLOOD-PROOFING
add
Sanitation
§ 9-3 — Manner of service.
§ 252-3 — Scope and applicability.
§ 275-31 — Minimum improvements.
§ 300-3 — Restrictions.
§ 300-6 — Procedure.
§ 325-40.10 — Campgrounds.
§ 325-40.22 — Kennel.
325-70.2{88} — DWELLING UNIT
add
Schools
§ 48-4 — Distribution.
§ 101-3 — Special use permits; district regulations.
§ 123-11 — Fire safety and property maintenance inspections.
§ 240-14 — Prohibited acts.
§ 246-2 — Uses.
§ 266-14 — General regulations; bond; variances.
§ 275-3 — Purpose.
§ 325-22.5 — Lot, area, and setback requirements.
§ 325-40.32 — Truck and multimodal transport terminals.
325-70.2{100} — EDUCATIONAL INSTITUTION
add
Screens and screening
§ 101-3 — Special use permits; district regulations.
§ 181-14 — Specific standards.
§ 217-21 — Fuel supply and storage.
§ 325-22.5 — Lot, area, and setback requirements.
§ 325-22.7 — REI district performance standards.
§ 325-40.2 — Accessory structures and uses.
§ 325-40.6 — Automotive sales.
§ 325-40.7 — Automotive service or repair shops and gasoline stations.
§ 325-40.8 — Bed-and-breakfasts.
§ 325-40.9 — Breweries, wineries, or distilleries.
§ 325-40.11 — Car washes.
§ 325-40.14 — Eating and drinking establishments.
§ 325-40.21 — Keeping of farm animals, poultry, or bees.
§ 325-40.27 — Outdoor storage.
§ 325-40.29 — Swimming pools, spas and hot tubs.
§ 325-40.31 — Telecommunications facilities.
§ 325-40.32 — Truck and multimodal transport terminals.
§ 325-40.33 — Solar energy collection systems.
§ 325-51.3 — General requirements.
§ 325-52.17 — Digital signs.
Ch 325 Pt 5 Art 54 — Landscaping, Screening and Buffering Regulations
§ 325-54.1 — Purpose and intent.
§ 325-54.6 — Landscaping standards.
§ 325-54.8 — Screening of dumpsters, service areas and mechanicals.
§ 325-54.9 — Buffering of nonresidential uses.
§ 325-56.6 — Transitions between nonresidential and residential uses.
§ 325-62.4 — Site plan materials.
325-70.2{27} — ARCHITECTURAL FEATURE
325-70.2{36} — BERM
325-70.2{109} — FENCE
325-70.2{204} — PRINTING OR PUBLISHING OPERATION
add
Security standards
§ 60-5 — Award of purchase or contract other than on the basis of best value.
74-2{3} — SEXUAL HARASSMENT
106-11{1} — AT LARGE
106-11{3} — ENCLOSURE
§ 106-12 — Restrictions.
§ 112-3 — Permit required; application.
§ 128-4 — Contents of notice.
§ 128-5 — Service of notice.
§ 128-8 — Assessment of expenses.
§ 128-9 — Emergency cases.
§ 217-21 — Fuel supply and storage.
§ 240-5 — Bond requirement.
§ 246-5 — General requirements.
§ 252-14 — Unsafe structures, premises and equipment.
§ 252-15 — Emergency measures.
§ 252-24 — Open areas and land.
§ 266-14 — General regulations; bond; variances.
§ 269-9 — Performance guarantee.
275-8{9} — BOND
§ 275-27 — Comprehensive Plan requirements; community facilities; land for recreational use.
§ 300-30 — Damage to meter.
§ 325-22.7 — REI district performance standards.
§ 325-30.7 — FPO permit process.
§ 325-40.18 — Fences.
§ 325-40.22 — Kennel.
§ 325-40.31 — Telecommunications facilities.
§ 325-40.33 — Solar energy collection systems.
§ 325-55.1 — Intent and purpose.
§ 325-55.5 — General requirements/standards.
§ 325-55.6 — Specific requirements/standards.
§ 325-60.9 — Building permit required.
§ 325-62.3 — Review procedure.
§ 325-62.7 — Site plan termination.
§ 325-68.2 — Applicability.
§ 325-68.7 — Letter of credit.
325-70.2{195} — PERFORMANCE BOND
add
Seizure
Ch 106 Art I — Seizure and Redemption of Dogs
§ 106-1 — Authorized fees.
§ 106-13 — Enforcement; appearance tickets; seizure; penalties for offenses.
§ 252-8 — Duties and powers of Code Official.
add
Senior citizens
§ 266-7 — Coordination with state and local law and local, state and federal agencies.
§ 266-14 — General regulations; bond; variances.
Ch 281 Art I — Senior Citizens Tax Exemption
§ 325-40.32 — Truck and multimodal transport terminals.
add
Septic systems
§ 196-8 — Exemptions.
§ 275-16 — Minor subdivision procedure.
§ 275-30 — Clustered projects.
§ 300-20 — Service lines and septic systems.
add
Septic tanks
§ 275-12 — Preliminary plan checklist.
§ 275-35 — Public sanitary sewer system.
§ 300-3 — Restrictions.
§ 300-20 — Service lines and septic systems.
add
Service dogs
§ 106-2.8 — Guide dog, service dog, hearing dog or detection dog tag.
§ 106-2.10 — Exemptions.
add
Setbacks
§ 217-10 — Lot and setback requirements.
§ 217-25 — Garbage and refuse.
§ 217-26 — Accessory structures on individual lots.
§ 217-41 — Lot and setback requirements.
§ 217-43 — Mobile home park standards.
§ 217-52 — Replacement mobile homes; inspection.
§ 275-12 — Preliminary plan checklist.
§ 275-14 — Final plan checklist.
§ 275-30 — Clustered projects.
§ 325-20.5 — Lot, area, and setback requirements.
§ 325-21.5 — Lot, area, and setback requirements.
§ 325-22.5 — Lot, area, and setback requirements.
§ 325-22.7 — REI district performance standards.
§ 325-23.5 — Lot, area, and setback requirements.
§ 325-24.4 — Manufactured home park regulations.
§ 325-24.5 — Manufactured home requirements.
§ 325-25.5 — Lot, area, and setback requirements.
§ 325-40.2 — Accessory structures and uses.
§ 325-40.13 — Drive-through facilities.
§ 325-40.15 — Exterior furnaces or outdoor heating devices.
§ 325-40.18 — Fences.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-40.28 — Ponds.
§ 325-40.30 — Temporary storage units.
§ 325-40.31 — Telecommunications facilities.
§ 325-40.32 — Truck and multimodal transport terminals.
§ 325-40.33 — Solar energy collection systems.
§ 325-52.9 — Location.
§ 325-52.16 — Regulation by sign type.
§ 325-52.18 — Nonconforming signs.
§ 325-53.1 — Lot regulations.
§ 325-54.6 — Landscaping standards.
§ 325-56.6 — Transitions between nonresidential and residential uses.
§ 325-62.5 — Review criteria.
325-70.2{227} — SETBACK
325-70.2{228} — SETBACK REGULATIONS
325-70.2{229} — SETBACK, FRONT
325-70.2{230} — SETBACK, REAR
325-70.2{231} — SETBACK, SIDE
325-70.2{232} — SETBACK, STREET
add
Sewage disposal, individual
§ 275-14 — Final plan checklist.
add
Sewage disposal, private
§ 275-25 — Septic or sewage system.
add
Sexual harassment
Ch 22 — Ethics, Code of
Ch 74 — Sexual Harassment
§ 74-1 — Purpose.
74-2{3} — SEXUAL HARASSMENT
§ 74-3 — Policy.
§ 74-4 — Procedures.
§ 74-5 — Training.
add
Shade trees
§ 325-54.6 — Landscaping standards.
add
Sheds
112-2B{4} — STRUCTURE
§ 123-4 — Building permits.
181-4B{32} — START OF CONSTRUCTION
§ 252-19 — Accessory structures.
§ 325-40.2 — Accessory structures and uses.
325-70.2{72} — DECIDUOUS
325-70.2{262} — TELECOMMUNICATIONS FACILITIES
add
Shopping centers
§ 325-31.4 — Access provisions.
§ 325-54.6 — Landscaping standards.
325-70.2{233} — SHOPPING CENTER
325-70.2{234} — SIGN
add
Shrubs
§ 118-3 — Maintenance.
§ 217-14 — Community facilities and activities; landscaping; off-street parking.
§ 252-27 — Property under construction or repair.
§ 325-30.5 — FPO permit application procedures.
§ 325-40.18 — Fences.
§ 325-40.32 — Truck and multimodal transport terminals.
§ 325-54.3 — Landscaping plan.
§ 325-54.5 — Plant specifications.
§ 325-54.6 — Landscaping standards.
§ 325-54.7 — Landscaping maintenance.
325-70.2{109} — FENCE
325-70.2{140} — HEDGE
325-70.2{151} — LANDSCAPING
add
Signs
§ 101-3 — Special use permits; district regulations.
§ 106-2.3 — Application.
112-2B{4} — STRUCTURE
§ 112-3 — Permit required; application.
§ 123-4 — Building permits.
§ 123-6 — Stop-work orders.
§ 123-13 — Condition assessments of parking garages.
123-13A{5} — RESPONSIBLE PROFESSIONAL ENGINEER
§ 123-17 — Violations and penalties.
§ 196-10 — Permit application and process.
§ 217-23 — Street signs.
§ 217-34 — Roadway names; lot numbers.
§ 217-64 — License procedures for manufactured home park and campground.
§ 217-65 — Renewal of license.
§ 240-14 — Prohibited acts.
§ 252-10 — Transfer of ownership.
§ 252-23 — Exterior structures.
§ 263-3 — Prohibited acts.
§ 263-5 — Presumptive evidence.
§ 269-5 — Exemptions.
275-8{27} — DULY DESIGNATED OFFICER
275-8{62} — PLAT, FINAL APPROVAL
275-8{63} — PLAT, FINAL APPROVAL WITH CONDITIONS
§ 275-13 — Final plan procedural requirements.
§ 275-14 — Final plan checklist.
§ 275-16 — Minor subdivision procedure.
§ 275-46 — Waiver.
§ 292-7 — When effective.
§ 300-15 — Application for service.
§ 325-31.4 — Access provisions.
§ 325-40.11 — Car washes.
§ 325-40.31 — Telecommunications facilities.
§ 325-40.33 — Solar energy collection systems.
Ch 325 Pt 5 Art 52 — Sign Regulations
§ 325-52.1 — Purpose and intent.
§ 325-52.2 — Applicability.
§ 325-52.3 — Permits required.
§ 325-52.4 — Sign permit applications.
§ 325-52.5 — Review procedures.
§ 325-52.6 — Measurement.
§ 325-52.7 — Safety provisions.
§ 325-52.8 — Design and construction.
§ 325-52.9 — Location.
§ 325-52.10 — Illumination.
§ 325-52.11 — Maintenance and repair.
§ 325-52.12 — Removal of signs.
§ 325-52.13 — Prohibited signs.
§ 325-52.14 — Signs authorized without a permit.
§ 325-52.15 — Permitted signs by zoning district.
§ 325-52.16 — Regulation by sign type.
§ 325-52.17 — Digital signs.
§ 325-52.18 — Nonconforming signs.
§ 325-55.6 — Specific requirements/standards.
§ 325-55.11 — Prohibited lighting.
§ 325-55.14 — Expiration of approval.
§ 325-60.8 — Public hearing process.
§ 325-62.4 — Site plan materials.
§ 325-62.5 — Review criteria.
§ 325-63.2 — General provisions.
325-70.2{77} — DIGITAL SIGN
325-70.2{234} — SIGN
325-70.2{235} — SIGN AREA
325-70.2{236} — SIGN FACE
325-70.2{237} — SIGN HEIGHT
325-70.2{238} — SIGN PERMIT
325-70.2{239} — SIGN STRUCTURE
325-70.2{240} — SIGN, ALTERATION OF
325-70.2{298} — ZONING PERMIT
add
Single-family dwellings
§ 123-4 — Building permits.
§ 252-16 — General responsibilities of owners and occupants.
§ 325-20.3 — Permitted and specially permitted uses.
§ 325-24.5 — Manufactured home requirements.
§ 325-25.3 — Permitted and specially permitted uses.
§ 325-31.4 — Access provisions.
325-70.2{92} — DWELLING, SINGLE-FAMILY
325-70.2{167} — MANUFACTURED HOME
325-70.2{179} — NONRESIDENTIAL USE
325-70.2{216} — RESIDENTIAL USE
add
Site plan approval
§ 101-4 — License application procedures.
§ 217-4 — Procedure for establishment of Manufactured Home Community District and manufactured home community.
§ 217-11 — General requirements.
§ 325-22.7 — REI district performance standards.
§ 325-30.7 — FPO permit process.
§ 325-40.18 — Fences.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-40.28 — Ponds.
§ 325-40.32 — Truck and multimodal transport terminals.
§ 325-40.33 — Solar energy collection systems.
§ 325-51.5 — Access management.
§ 325-55.14 — Expiration of approval.
§ 325-62.2 — Applicability.
§ 325-62.7 — Site plan termination.
325-70.2{195} — PERFORMANCE BOND
add
Site plan review
§ 196-10 — Permit application and process.
§ 325-20.4 — Applicable standards.
§ 325-21.4 — Applicable standards.
§ 325-22.4 — Applicable standards.
§ 325-22.5 — Lot, area, and setback requirements.
§ 325-22.7 — REI district performance standards.
§ 325-23.4 — Applicable standards.
§ 325-25.4 — Applicable standards.
§ 325-25.5 — Lot, area, and setback requirements.
§ 325-31.4 — Access provisions.
§ 325-40.1 — Purpose and applicability.
§ 325-40.2 — Accessory structures and uses.
§ 325-40.5 — Airports or heliports.
§ 325-40.7 — Automotive service or repair shops and gasoline stations.
§ 325-40.9 — Breweries, wineries, or distilleries.
§ 325-40.10 — Campgrounds.
§ 325-40.17 — Farm stands.
§ 325-40.24 — Multiple-family dwellings.
§ 325-40.28 — Ponds.
§ 325-40.31 — Telecommunications facilities.
§ 325-40.33 — Solar energy collection systems.
§ 325-51.3 — General requirements.
§ 325-51.5 — Access management.
§ 325-51.6 — Minimum parking space requirements.
§ 325-52.5 — Review procedures.
§ 325-54.2 — Applicability.
§ 325-54.9 — Buffering of nonresidential uses.
§ 325-55.4 — Approvals required.
§ 325-55.10 — Nonconforming lighting.
§ 325-55.13 — Lighting plan submittal requirements.
§ 325-56.4 — Site planning standards.
§ 325-56.6 — Transitions between nonresidential and residential uses.
§ 325-60.2 — Pre-application conference.
§ 325-60.8 — Public hearing process.
Ch 325 Pt 6 Art 62 — Site Plan Review
§ 325-62.1 — Intent.
§ 325-62.2 — Applicability.
§ 325-62.3 — Review procedure.
§ 325-62.4 — Site plan materials.
§ 325-62.5 — Review criteria.
§ 325-64.3 — Review procedure.
§ 325-67.2 — Planning Board.
§ 325-68.3 — Review procedure.
§ 325-68.4 — Application requirements.
325-70.2{243} — SITE PLAN REVIEW
add
Site plan review and approval
§ 325-22.7 — REI district performance standards.
§ 325-40.28 — Ponds.
§ 325-62.5 — Review criteria.
add
Site plans
§ 101-4 — License application procedures.
§ 123-4 — Building permits.
175-6{4} — MUNICIPAL APPLICATION
196-4{2} — CLEARING, GRADING AND FILLING ACTIVITIES
§ 196-8 — Exemptions.
§ 196-10 — Permit application and process.
§ 217-4 — Procedure for establishment of Manufactured Home Community District and manufactured home community.
§ 217-10 — Lot and setback requirements.
§ 217-11 — General requirements.
§ 217-55 — Application for building permit.
§ 246-7 — Inspection of playgrounds or recreation areas.
§ 246-9 — Fee reimbursement.
§ 246-10 — Performance guaranty.
§ 269-4 — Applicability.
§ 269-6 — Compliance with other land use regulations required.
275-8{27} — DULY DESIGNATED OFFICER
§ 325-20.4 — Applicable standards.
§ 325-21.4 — Applicable standards.
§ 325-21.6 — Dimensional and bulk requirements.
§ 325-22.2 — Purpose statements.
§ 325-22.4 — Applicable standards.
§ 325-22.5 — Lot, area, and setback requirements.
§ 325-22.6 — Dimensional and bulk requirements.
§ 325-22.7 — REI district performance standards.
§ 325-23.4 — Applicable standards.
§ 325-25.4 — Applicable standards.
§ 325-25.5 — Lot, area, and setback requirements.
§ 325-30.5 — FPO permit application procedures.
§ 325-30.7 — FPO permit process.
§ 325-31.3 — Submission requirements.
§ 325-31.4 — Access provisions.
§ 325-40.1 — Purpose and applicability.
§ 325-40.2 — Accessory structures and uses.
§ 325-40.5 — Airports or heliports.
§ 325-40.7 — Automotive service or repair shops and gasoline stations.
§ 325-40.9 — Breweries, wineries, or distilleries.
§ 325-40.10 — Campgrounds.
§ 325-40.15 — Exterior furnaces or outdoor heating devices.
§ 325-40.17 — Farm stands.
§ 325-40.18 — Fences.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-40.24 — Multiple-family dwellings.
§ 325-40.28 — Ponds.
§ 325-40.31 — Telecommunications facilities.
§ 325-40.32 — Truck and multimodal transport terminals.
§ 325-40.33 — Solar energy collection systems.
§ 325-51.3 — General requirements.
§ 325-51.5 — Access management.
§ 325-51.6 — Minimum parking space requirements.
§ 325-52.4 — Sign permit applications.
§ 325-52.5 — Review procedures.
§ 325-54.2 — Applicability.
§ 325-54.4 — General requirements.
§ 325-54.9 — Buffering of nonresidential uses.
§ 325-55.1 — Intent and purpose.
§ 325-55.2 — Authority.
§ 325-55.4 — Approvals required.
§ 325-55.6 — Specific requirements/standards.
§ 325-55.10 — Nonconforming lighting.
§ 325-55.13 — Lighting plan submittal requirements.
§ 325-55.14 — Expiration of approval.
§ 325-56.3 — Objectives.
§ 325-56.4 — Site planning standards.
§ 325-56.6 — Transitions between nonresidential and residential uses.
§ 325-60.2 — Pre-application conference.
§ 325-60.8 — Public hearing process.
Ch 325 Pt 6 Art 62 — Site Plan Review
§ 325-62.1 — Intent.
§ 325-62.2 — Applicability.
§ 325-62.3 — Review procedure.
§ 325-62.4 — Site plan materials.
§ 325-62.5 — Review criteria.
§ 325-62.6 — Modifications to site plans.
§ 325-62.7 — Site plan termination.
§ 325-64.3 — Review procedure.
§ 325-64.4 — Application requirements.
§ 325-67.2 — Planning Board.
§ 325-68.1 — Purpose.
§ 325-68.3 — Review procedure.
§ 325-68.4 — Application requirements.
§ 325-68.5 — Review criteria.
§ 325-68.8 — Approval not guaranteed.
325-70.2{195} — PERFORMANCE BOND
325-70.2{242} — SITE PLAN
325-70.2{243} — SITE PLAN REVIEW
add
Sketch plans
196-4{4} — GRADING SKETCH PLAN
§ 196-10 — Permit application and process.
275-8{59} — PLAN, SKETCH
275-8{73} — SKETCH PLAN
§ 275-9 — General procedural requirements.
§ 275-10 — Sketch plan requirements.
§ 275-12 — Preliminary plan checklist.
§ 300-6 — Procedure.
§ 325-40.18 — Fences.
add
Smoke
§ 112-3 — Permit required; application.
123-2{13} — MOBILE FOOD PREPARATION VEHICLES
§ 123-7 — Certificates of occupancy and certificates of compliance.
§ 167-9 — Notice to prospective neighbors; notice of farm use.
§ 252-23 — Exterior structures.
§ 325-22.7 — REI district performance standards.
§ 325-40.1 — Purpose and applicability.
§ 325-40.10 — Campgrounds.
§ 325-40.20 — Home occupations.
§ 325-50.1 — Purpose and intent.
§ 325-50.8 — Smoke.
add
Smoking
§ 112-3 — Permit required; application.
123-2{13} — MOBILE FOOD PREPARATION VEHICLES
§ 123-7 — Certificates of occupancy and certificates of compliance.
§ 167-9 — Notice to prospective neighbors; notice of farm use.
§ 252-23 — Exterior structures.
§ 325-22.7 — REI district performance standards.
§ 325-40.1 — Purpose and applicability.
§ 325-40.10 — Campgrounds.
§ 325-40.20 — Home occupations.
§ 325-50.1 — Purpose and intent.
§ 325-50.8 — Smoke.
add
Snow and ice removal
§ 217-11 — General requirements.
§ 217-30 — Responsibilities of owner.
§ 325-24.6 — Manufactured home park administration.
§ 325-51.3 — General requirements.
add
Soil erosion and sediment control
§ 196-11 — Standards for approval or denial of permit.
§ 252-22 — Ground cover.
§ 269-1 — Findings of fact.
§ 269-2 — Purpose.
§ 275-12 — Preliminary plan checklist.
§ 275-30 — Clustered projects.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-40.31 — Telecommunications facilities.
§ 325-54.1 — Purpose and intent.
add
Solar collectors
§ 325-40.33 — Solar energy collection systems.
325-70.2{246} — SOLAR ENERGY SYSTEM, MAJOR OR SOLAR FARM
325-70.2{247} — SOLAR ENERGY SYSTEM, MINOR OR ACCESSORY
325-70.2{249} — SOLAR SKY SPACE
add
Solar energy systems
§ 325-40.2 — Accessory structures and uses.
§ 325-40.33 — Solar energy collection systems.
§ 325-62.2 — Applicability.
325-70.2{246} — SOLAR ENERGY SYSTEM, MAJOR OR SOLAR FARM
325-70.2{247} — SOLAR ENERGY SYSTEM, MINOR OR ACCESSORY
add
Special exceptions
§ 217-11 — General requirements.
add
Special permits
§ 112-3 — Permit required; application.
§ 196-20 — Excavation operations conducted under special permit.
§ 217-17 — Conformance required.
§ 269-4 — Applicability.
§ 325-20.3 — Permitted and specially permitted uses.
§ 325-21.3 — Permitted and specially permitted uses.
§ 325-21.6 — Dimensional and bulk requirements.
§ 325-22.3 — Permitted and specially permitted uses.
§ 325-22.5 — Lot, area, and setback requirements.
§ 325-22.6 — Dimensional and bulk requirements.
§ 325-22.7 — REI district performance standards.
§ 325-23.3 — Permitted and specially permitted uses.
§ 325-25.3 — Permitted and specially permitted uses.
§ 325-31.2 — Applicability.
§ 325-40.1 — Purpose and applicability.
§ 325-40.13 — Drive-through facilities.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-40.33 — Solar energy collection systems.
§ 325-50.2 — Noise associated with a use.
§ 325-51.6 — Minimum parking space requirements.
§ 325-52.5 — Review procedures.
§ 325-55.6 — Specific requirements/standards.
§ 325-64.2 — Applicability.
325-70.2{250} — SPECIAL USE OR SPECIALLY PERMITTED USE
add
Special permit uses
§ 196-20 — Excavation operations conducted under special permit.
§ 217-17 — Conformance required.
§ 325-20.3 — Permitted and specially permitted uses.
§ 325-21.3 — Permitted and specially permitted uses.
§ 325-21.6 — Dimensional and bulk requirements.
§ 325-22.3 — Permitted and specially permitted uses.
§ 325-22.6 — Dimensional and bulk requirements.
§ 325-22.7 — REI district performance standards.
§ 325-23.3 — Permitted and specially permitted uses.
§ 325-25.3 — Permitted and specially permitted uses.
§ 325-31.2 — Applicability.
§ 325-40.1 — Purpose and applicability.
§ 325-40.13 — Drive-through facilities.
§ 325-50.2 — Noise associated with a use.
§ 325-64.2 — Applicability.
325-70.2{250} — SPECIAL USE OR SPECIALLY PERMITTED USE
add
Special use permits
§ 101-3 — Special use permits; district regulations.
§ 101-4 — License application procedures.
175-6{4} — MUNICIPAL APPLICATION
§ 217-17 — Conformance required.
§ 325-20.3 — Permitted and specially permitted uses.
§ 325-21.3 — Permitted and specially permitted uses.
§ 325-22.3 — Permitted and specially permitted uses.
§ 325-23.3 — Permitted and specially permitted uses.
§ 325-24.3 — Applicability.
§ 325-25.3 — Permitted and specially permitted uses.
§ 325-40.1 — Purpose and applicability.
§ 325-40.5 — Airports or heliports.
§ 325-40.6 — Automotive sales.
§ 325-40.15 — Exterior furnaces or outdoor heating devices.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-40.29 — Swimming pools, spas and hot tubs.
§ 325-40.31 — Telecommunications facilities.
§ 325-40.33 — Solar energy collection systems.
§ 325-60.8 — Public hearing process.
§ 325-62.3 — Review procedure.
Ch 325 Pt 6 Art 64 — Special Use Permits
§ 325-64.1 — Purpose.
§ 325-64.2 — Applicability.
§ 325-64.3 — Review procedure.
§ 325-64.4 — Application requirements.
§ 325-64.6 — Conditions on special use permits.
§ 325-64.7 — Renewal of special use permits with specific time periods.
§ 325-64.8 — Authorization, amendments, and expiration.
§ 325-67.2 — Planning Board.
§ 325-67.4 — Code Enforcement Officer (CEO).
add
Special uses
§ 101-3 — Special use permits; district regulations.
§ 101-4 — License application procedures.
175-6{4} — MUNICIPAL APPLICATION
§ 217-17 — Conformance required.
275-8{69} — RIGHT-OF-WAY
§ 325-20.3 — Permitted and specially permitted uses.
§ 325-21.3 — Permitted and specially permitted uses.
§ 325-22.3 — Permitted and specially permitted uses.
§ 325-23.3 — Permitted and specially permitted uses.
§ 325-24.3 — Applicability.
§ 325-25.3 — Permitted and specially permitted uses.
§ 325-40.1 — Purpose and applicability.
§ 325-40.5 — Airports or heliports.
§ 325-40.6 — Automotive sales.
§ 325-40.15 — Exterior furnaces or outdoor heating devices.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-40.29 — Swimming pools, spas and hot tubs.
§ 325-40.31 — Telecommunications facilities.
§ 325-40.33 — Solar energy collection systems.
§ 325-60.8 — Public hearing process.
§ 325-62.3 — Review procedure.
Ch 325 Pt 6 Art 64 — Special Use Permits
§ 325-64.1 — Purpose.
§ 325-64.2 — Applicability.
§ 325-64.3 — Review procedure.
§ 325-64.4 — Application requirements.
§ 325-64.6 — Conditions on special use permits.
§ 325-64.7 — Renewal of special use permits with specific time periods.
§ 325-64.8 — Authorization, amendments, and expiration.
§ 325-67.2 — Planning Board.
§ 325-67.4 — Code Enforcement Officer (CEO).
325-70.2{250} — SPECIAL USE OR SPECIALLY PERMITTED USE
add
Speed limits
§ 246-6 — Alternative parks.
§ 325-31.4 — Access provisions.
§ 325-51.5 — Access management.
add
Steep slopes
§ 275-18 — Land requirements.
§ 275-30 — Clustered projects.
§ 325-30.5 — FPO permit application procedures.
§ 325-62.4 — Site plan materials.
add
Stop work orders
123-2{21} — STOP-WORK ORDER
§ 123-3 — Code Enforcement Officer and inspectors.
§ 123-6 — Stop-work orders.
§ 123-12 — Complaints.
§ 123-15 — Recordkeeping.
§ 123-17 — Violations and penalties.
§ 181-11 — Establishment of development permit.
§ 181-12 — Duties and responsibilities of Zoning Officer.
§ 196-15 — Stop-work orders.
269-7{29} — STOP WORK ORDER
§ 269-10 — Enforcement notices and orders.
§ 325-40.19 — Grading, excavating, clearing, filling and mining.
§ 325-67.4 — Code Enforcement Officer (CEO).
325-70.2{252} — STOP-WORK ORDER
add
Storage
101-2{8} — NET FLOOR AREA
§ 106-5 — Conditions regulating storage.
§ 106-8 — Miscellaneous provisions.
112-2B{4} — STRUCTURE
§ 112-3 — Permit required; application.
123-2{22} — SUGARHOUSE
§ 123-4 — Building permits.
§ 123-10 — Operating permits.
123-13A{3} — PARKING GARAGE
167-3B{3} — AGRICULTURAL PRACTICES
181-4B{7} — BUILDING
181-4B{20} — FUNCTIONALLY DEPENDENT USE
181-4B{22} — LOWEST FLOOR
181-4B{32} — START OF CONSTRUCTION
181-4B{33} — STRUCTURE
§ 181-11 — Establishment of development permit.
§ 217-21 — Fuel supply and storage.
§ 217-25 — Garbage and refuse.
§ 217-28 — Storage of auxiliary vehicles.
§ 217-50 — Storage of auxiliary vehicles.
§ 217-61 — Manufactured homes and camping grounds.
Ch 240 — Peddling and Soliciting
Ch 252 — Property Maintenance
§ 252-24 — Open areas and land.
§ 252-27 — Property under construction or repair.
Ch 263 — Sales and Storage, Outdoor
§ 263-1 — Purpose.
§ 266-2 — Findings.
266-5B{8} — DISPOSAL
266-5B{20} — SOLID WASTE MANAGEMENT FACILITY
266-5B{21} — TRANSFER STATION
§ 266-9 — Prohibited facilities.
§ 266-11 — Application contents.
§ 275-37 — Site and surface improvements.
§ 281-23 — Exemption.
§ 292-4 — Liability for costs.
Ch 297 — Vehicles, Disabled or Abandoned
§ 297-1 — Legislative intent.
§ 297-2 — Purpose.
297-3{2} — JUNK VEHICLE
297-3{3} — NUISANCE
§ 297-4 — Outdoor storage prohibited.
§ 297-9 — Presumption of consent.
§ 297-10 — Time limit for nonconforming uses.
§ 300-3 — Restrictions.
§ 325-20.3 — Permitted and specially permitted uses.
§ 325-21.3 — Permitted and specially permitted uses.
§ 325-22.3 — Permitted and specially permitted uses.
§ 325-22.7 — REI district performance standards.
§ 325-24.4 — Manufactured home park regulations.
§ 325-24.6 — Manufactured home park administration.
§ 325-25.3 — Permitted and specially permitted uses.
§ 325-25.5 — Lot, area, and setback requirements.
§ 325-30.6 — Establishment of FPO zones.
§ 325-31.5 — Driveway location and design.
§ 325-40.2 — Accessory structures and uses.
§ 325-40.5 — Airports or heliports.
§ 325-40.6 — Automotive sales.
§ 325-40.7 — Automotive service or repair shops and gasoline stations.
§ 325-40.10 — Campgrounds.
§ 325-40.11 — Car washes.
§ 325-40.20 — Home occupations.
§ 325-40.21 — Keeping of farm animals, poultry, or bees.
§ 325-40.26 — Outdoor sales or display.
§ 325-40.27 — Outdoor storage.
§ 325-40.30 — Temporary storage units.
§ 325-40.32 — Truck and multimodal transport terminals.
§ 325-40.33 — Solar energy collection systems.
§ 325-51.3 — General requirements.
§ 325-51.6 — Minimum parking space requirements.
§ 325-62.2 — Applicability.
§ 325-62.4 — Site plan materials.
§ 325-64.4 — Application requirements.
325-70.2{12} — AGRICULTURAL WASTE MANAGEMENT FACILITY
325-70.2{28} — AUTOMOTIVE SALES
325-70.2{62} — CONTRACTOR OR BUILDING MATERIAL STORAGE YARD
325-70.2{120} — FLOOR AREA, GROSS
325-70.2{126} — GARAGE, ATTACHED
325-70.2{127} — GARAGE, DETACHED
325-70.2{129} — GARAGE, PRIVATE
325-70.2{147} — INDUSTRIAL
325-70.2{155} — LIGHT INDUSTRIAL USE
325-70.2{166} — LUMBERYARD
325-70.2{170} — MANUFACTURING
325-70.2{185} — OUTDOOR INDUSTRIAL OPERATION
325-70.2{188} — OUTDOOR STORAGE
325-70.2{224} — SELF-SERVICE STORAGE FACILITY
325-70.2{226} — SERVICE AREA
325-70.2{245} — SOLAR ENERGY EQUIPMENT
325-70.2{247} — SOLAR ENERGY SYSTEM, MINOR OR ACCESSORY
325-70.2{258} — STRUCTURE
325-70.2{262} — TELECOMMUNICATIONS FACILITIES
325-70.2{264} — TEMPORARY STORAGE UNIT
325-70.2{280} — TRUCK OR MULTIMODAL TRANSPORT TERMINAL
325-70.2{288} — WAREHOUSE
add
Stormwater
Ch 181 — Flood Damage Prevention
§ 217-11 — General requirements.
§ 252-27 — Property under construction or repair.
§ 266-11 — Application contents.
§ 266-12 — Application decision criteria.
Ch 269 — Stormwater Management; Erosion and Sediment Control
§ 269-1 — Findings of fact.
§ 269-2 — Purpose.
§ 269-4 — Applicability.
§ 269-5 — Exemptions.
§ 269-6 — Compliance with other land use regulations required.
269-7{8} — DESIGN MANUAL
269-7{13} — INDUSTRIAL STORMWATER PERMIT
269-7{14} — INFILTRATION
269-7{18} — MAINTENANCE AGREEMENT
269-7{27} — SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MUNICIPAL SEPARATE STORMWATER SEWER SYSTEMS GP-02-02
269-7{30} — STORMWATER
269-7{31} — STORMWATER HOTSPOT
269-7{32} — STORMWATER MANAGEMENT
269-7{33} — STORMWATER MANAGEMENT FACILITY
269-7{34} — STORMWATER MANAGEMENT OFFICER
269-7{35} — STORMWATER MANAGEMENT PRACTICES (SMPs)
269-7{36} — STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
269-7{37} — STORMWATER RUNOFF
§ 269-8 — Construction inspection.
§ 269-9 — Performance guarantee.
§ 269-11 — Penalties for offenses.
Ch 275 — Subdivision of Land
275-8{24} — DRAINAGE DISTRICT
275-8{25} — DRAINAGE EASEMENT
275-8{38} — IMPROVEMENTS
§ 275-11 — Preliminary plan procedural requirements.
§ 275-12 — Preliminary plan checklist.
§ 275-13 — Final plan procedural requirements.
§ 275-18 — Land requirements.
§ 275-26 — Storm drainage.
§ 275-36 — Storm sewers and drainage.
§ 275-37 — Site and surface improvements.
Ch 300 — Water
§ 325-22.5 — Lot, area, and setback requirements.
§ 325-22.7 — REI district performance standards.
§ 325-40.28 — Ponds.
§ 325-40.32 — Truck and multimodal transport terminals.
§ 325-51.1 — Purpose and intent.
§ 325-51.3 — General requirements.
§ 325-62.2 — Applicability.
§ 325-62.4 — Site plan materials.
§ 325-62.5 — Review criteria.
325-70.2{75} — DETENTION POND
325-70.2{135} — GREEN SPACE
325-70.2{253} — STORMWATER RETENTION AREA
add
Stormwater control
§ 269-6 — Compliance with other land use regulations required.
269-7{27} — SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MUNICIPAL SEPARATE STORMWATER SEWER SYSTEMS GP-02-02
§ 275-11 — Preliminary plan procedural requirements.
§ 275-13 — Final plan procedural requirements.
add
Stormwater management
Ch 181 — Flood Damage Prevention
§ 217-11 — General requirements.
§ 252-27 — Property under construction or repair.
§ 266-11 — Application contents.
Ch 269 — Stormwater Management; Erosion and Sediment Control
§ 269-1 — Findings of fact.
§ 269-2 — Purpose.
§ 269-4 — Applicability.
§ 269-5 — Exemptions.
269-7{8} — DESIGN MANUAL
269-7{18} — MAINTENANCE AGREEMENT
269-7{32} — STORMWATER MANAGEMENT
269-7{33} — STORMWATER MANAGEMENT FACILITY
269-7{34} — STORMWATER MANAGEMENT OFFICER
269-7{35} — STORMWATER MANAGEMENT PRACTICES (SMPs)
§ 269-8 — Construction inspection.
§ 269-9 — Performance guarantee.
§ 269-11 — Penalties for offenses.
Ch 275 — Subdivision of Land
§ 275-11 — Preliminary plan procedural requirements.
§ 275-12 — Preliminary plan checklist.
§ 275-13 — Final plan procedural requirements.
§ 275-36 — Storm sewers and drainage.
§ 275-37 — Site and surface improvements.
Ch 300 — Water
§ 325-22.5 — Lot, area, and setback requirements.
§ 325-22.7 — REI district performance standards.
§ 325-40.28 — Ponds.
325-70.2{135} — GREEN SPACE
add
Swimming pools
101-2{7} — MASSAGE ESTABLISHMENT
§ 217-14 — Community facilities and activities; landscaping; off-street parking.
§ 325-40.2 — Accessory structures and uses.
§ 325-40.29 — Swimming pools, spas and hot tubs.
325-70.2{161} — LOT COVERAGE
325-70.2{217} — RESTAURANT
325-70.2{261} — SWIMMING POOL