home
Home
code
Code
Code
Index
law
Laws (7)
New Laws (7)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of Alloway, NJ
chevron_right
2023-06-15
info
chevron_right
Index: E
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
E
add
Easements
§ 1-13 — Ordinances saved from repeal.
§ 9-4 — Acquisitions by Commission.
§ 63-9 — Abrogation and greater restrictions.
§ 75-7 — Subdivision, site plan and conditional use review procedures.
75-15{32} — GROSS ACREAGE
§ 75-46.1 — Stream corridor protection.
§ 75-46.2 — Agricultural buffers.
§ 75-48 — Cluster development.
§ 75-66 — Site plan review requirements.
§ 75-67 — Site plan review standards.
§ 75-74 — Sketch plat.
§ 75-76 — Final plat.
§ 75-84 — Public use and service areas.
92-1{2} — PUBLIC PROPERTY
§ 96-2 — Connection required.
98-2{15} — ENVIRONMENTALLY CONSTRAINED AREA
§ 98-4 — Stormwater management requirements for major development.
§ A121-1 — Purpose.
add
Elevators
§ 63-2 — Findings of fact.
63-5B{1} — AH ZONE
63-5B{8} — BREAKAWAY WALL
63-5B{13} — FLOOD INSURANCE STUDY (FIS)
63-5B{17} — HIGHEST ADJACENT GRADE
63-5B{30} — VIOLATION
§ 63-12 — Establishment of development permit.
§ 63-14 — Duties and responsibilities of administrator.
§ 63-15 — Variance procedure.
§ 63-16 — General standards.
75-15{6} — BUILDING HEIGHT
75-15{76} — VILLAGE ARCHITECTURE
§ 75-23 — Height exceptions.
§ 75-39 — Flood hazard requirements.
§ 75-40 — Drainage requirements.
§ 75-46.2 — Agricultural buffers.
§ 75-55 — Historic Preservation District regulations.
§ 75-66 — Site plan review requirements.
§ 75-74 — Sketch plat.
§ 75-75 — Preliminary plat.
§ 75-76 — Final plat.
98-2{46} — TIDAL FLOOD HAZARD AREA
98-2{50} — WATER CONTROL STRUCTURE
§ 98-4 — Stormwater management requirements for major development.
§ 98-5 — Calculation of stormwater runoff and groundwater recharge.
§ 98-7 — Solids and floatable materials control standards.
§ 98-8 — Safety standards for stormwater management basins.
§ 98-9 — Requirements for a site development stormwater plan.
add
Emergencies
§ 21-4 — Overtime pay.
§ 38-5 — Access to vacant properties.
§ 42-4 — Hours of operation.
§ 42-5 — Boating, fishing, swimming, and boat ramp access.
§ 42-7 — Unlawful and prohibited activities.
§ 52-1 — Enforcing agency established; subcode officials designated; office location.
§ 63-7 — Basis for establishing areas of special flood hazard.
§ 63-15 — Variance procedure.
§ 75-36.1 — Growth share and affordable housing.
§ 75-51 — Gasoline service stations and public garages.
§ 75-67 — Site plan review standards.
§ 80-2 — Examples.
§ 80-3 — Exceptions.
§ 90-5 — Emergency conditions.
§ 98-8 — Safety standards for stormwater management basins.
§ 98-9 — Requirements for a site development stormwater plan.
§ 99-12 — Regulation of operations.
§ 99-20 — Regulations governing issuance of permits.
§ 102-1 — Adoption of standards by reference.
§ A121-14 — Commitments by company.
§ A121-15 — Emergency uses.
add
Emergency management
§ 63-7 — Basis for establishing areas of special flood hazard.
§ A121-14 — Commitments by company.
add
Emergency vehicles
§ 42-7 — Unlawful and prohibited activities.
§ 63-15 — Variance procedure.
§ 75-67 — Site plan review standards.
§ 99-20 — Regulations governing issuance of permits.
add
Encroachments
§ 75-38 — Fences, walls and hedges.
§ 75-42 — Off-street loading.
§ 75-43 — Off-street parking.
§ 75-46.1 — Stream corridor protection.
§ 98-7 — Solids and floatable materials control standards.
§ 99-1 — Removal of sidewalk and street obstructions required.
add
Environmental Commission
Ch 9 — Environmental Commission
§ 9-1 — Commission established.
§ 9-4 — Acquisitions by Commission.
§ 9-5 — Records and annual reports.
§ 9-7 — Studies and recommendations.
§ 9-8 — Development applications.
add
Environmental impact statement
75-15{19} — ENVIRONMENTAL IMPACT STATEMENT (EIS)
§ 75-66 — Site plan review requirements.
§ 75-67 — Site plan review standards.
§ 75-75 — Preliminary plat.
§ 75-80.1 — Environmental impact.
add
Erosion and sediment control
63-5B{15} — FLOODPLAIN MANAGEMENT REGULATIONS
§ 75-46.1 — Stream corridor protection.
§ 75-67 — Site plan review standards.
§ 98-3 — Design and performance standards for stormwater management measures.
§ 98-4 — Stormwater management requirements for major development.
§ 98-5 — Calculation of stormwater runoff and groundwater recharge.
add
Escrow accounts
§ 75-97 — Fees.
add
Escrow deposits
§ 75-97 — Fees.
add
Excavations
Ch 1 Art II — Ordinances Adopted During Codification
63-5B{9} — DEVELOPMENT
63-5B{25} — START OF CONSTRUCTION
75-15{40} — LAND MINING OPERATION
75-15{53} — NATURAL STREAM
§ 75-66 — Site plan review requirements.
§ 75-67 — Site plan review standards.
§ 80-2 — Examples.
§ 90-1 — Notice of placement, replacement or removal.
§ 90-2 — Restoration of property.
§ 90-5 — Emergency conditions.
98-2{11} — DEVELOPMENT
98-2{41} — STORMWATER MANAGEMENT BMP
Ch 99 Art III — Street Excavations and Openings
§ 99-12 — Regulation of operations.
add
Explosives
§ 80-2 — Examples.
§ 96-12 — Prohibited uses.