It is the intent of these specifications and
plans to obtain the best possible road of the type designed. Good
workmanship in all phases and good practice must prevail.
Work will be performed in the following order:
A. Rough grading of the road as soon as the developer
starts his construction.
B. The developer shall schedule and have installed all
sanitary storm sewers and utilities with necessary stubs beyond the
limits of the roadbed.
C. The developer shall grade all yards.
D. After two to six months, the Village Manager or his
duly designated representative shall determine that stone, penetrant
and blacktop shall be installed.
The Village Manager or his duly designated representative
may stop by written order any work or any part of the work under this
contract if, in his opinion, the methods employed or conditions are
such that unsatisfactory work might result. When work is so stopped
it shall not be resumed until the methods or conditions are revised
to the satisfaction of the Village Manager or his duly designated
representative, which must be signified in writing.