Contribution = Pro Rata Share x Estimated Cost
of Facility
|
Flow From Development
| |
Pro Rata Share =
|
_____________________
|
Capacity of Off-Tract Facility
| |
These parameters shall be quantified as follows:
|
Developed Runoff - Existing Runoff
| |
Pro Rata Share =
|
____________________________
|
Capacity of Facility
| |
The parameters shall be quantified as follows:
|
Traffic Demand
| |
Pro Rata Share =
|
_______________________
|
Capacity of Proposed Facility
| |
The parameters shall be quantified as follows:
|
Street Classification
|
Vehicles
per Day
|
---|---|
Major collectors (four-lane)
|
10,000
|
Minor collectors (two-lane)
|
6,000
|
Local streets
|
800
|