No building permit shall be issued for the construction of any new dwelling
in the Village until reasonably satisfactory proof has been furnished to the
Building Inspector that the facility or system for the disposal of sewage
or other putrescent organic wastes for said dwelling will properly operate
and function in consideration of the actual soil and topographic conditions
existing at the location where said facilities or system are to be installed.
Plans for the proposed sewage disposal system, prepared by a duly licensed
professional engineer, shall be submitted to the Building Inspector who shall
review and approve the same only after he has personally inspected the soil
conditions and has observed appropriate percolation tests at the exact location
of the proposed system.
The Building Inspector shall, during the course of construction of the
sewage disposal system, make necessary inspections to ensure that said system
is constructed (and the excavations are backfilled) in accordance with the
approved plan.