The procedure set forth in this article shall be followed by all applicants proposing to subdivide or develop land in Doylestown Township.
In order to save unnecessary work on major subdivisions and land developments, it is suggested that before preparing preliminary plans a sketch plan be submitted by the subdivider or land developer as a basis for discussion with the Township. It is suggested that the sketch plan show the following information:
A. 
The name of the subdivision or land development.
B. 
Tax Map parcel number.
C. 
Location map.
D. 
Adjoining property lines and owners, including those across streets.
E. 
Approximate net buildable site area.
F. 
The name and address of the owner/applicant.
G. 
The name and address of the applicant's engineer, surveyor, architect or landscape architect preparing the plan.
H. 
The tract boundary and location from a survey plan or deed plotting, including a notation as to which is applicable.
I. 
A north point and approximate scale.
J. 
Streets on and adjacent to the tract.
K. 
Significant topographic and physical features, including but not limited to floodplains, steep slopes, woodlands, streams and watercourses, existing structures and driveways, on or within 500 feet of the site and existing land use(s). The Planning Commission may request a greater distance where deemed necessary.
L. 
Contours (replotting and interpolation of United States Geological Survey is sufficient).
M. 
Proposed street, lot and open space layout.
N. 
Approximate tract area and present zoning.
O. 
General arrangement of proposed buildings and parking areas in land developments.
P. 
Any requested rezoning or variances required.
Q. 
The proposed method of wastewater disposal (on-site systems; public sewers).
All subdivision and land development applicants shall submit a preliminary plan conforming to the following standards and showing the following information. All plans shall be labeled with the words "Preliminary Plan - Not to be Recorded."
A. 
Drafting standards.
(1) 
The scale of the plan shall not be smaller than 100 feet to the inch. If such a scale is impractical, a lesser scale may be used, provided that prior permission is obtained from the Township Engineer. Grading and stormwater plans shall be at a scale of one inch equals 50 feet or greater.
(2) 
Dimensions shall be in feet and decimal parts thereof and bearings shall be in degrees, minutes and seconds. All radii, arc and chord lengths and central angles of curves shall be indicated.
(3) 
Where any revision is made or when the plan is a revision of a previously approved plan, dotted lines shall be used to show features or locations to be abandoned and solid lines shall show the currently proposed features.
(4) 
The sheet or sheets shall be one of the following sizes: 24 by 36 inches, 30 by 42 inches or 36 by 48 inches. If more than one sheet is necessary, each sheet shall be the same size and consecutively numbered to show its relation to the total number of sheets comprising the plan, i.e., Sheet No. 1 of 5, etc. Lettering and features shall be drawn so as to remain legible when reduced to half size.
(5) 
Where there are two or more sheets, a key map shall be provided sufficient to show their relationship.
(6) 
The plan shall be clear and legible and shall be so prepared and bear an adequate legend to indicate clearly which features are existing and which are proposed.
(7) 
The boundary line of the subdivision shall be shown as a solid heavy line.
B. 
General information.
(1) 
The name of the subdivision or land development.
(2) 
The Tax Map parcel number, and name of municipality, county and state in which the property is located.
(3) 
The name and address of the owner/applicant.
(4) 
Name, address, seal and signature of the registered engineer or surveyor responsible for the plan. If an architect or landscape architect collaborated in the preparation of the plan, his name and address shall also appear.
(5) 
Type of water supply and sewage disposal facilities proposed, with required isolation distances shown.
(6) 
Zoning district and boundaries.
(7) 
Zoning requirements, including applicable district, lot size and yard requirements, open space, impervious surface amount and ratio, buffer yards, height, resource protection standards, site capacity calculations and proof of any variance or special exceptions which may have been granted.
(8) 
A Tax Map format shall be used with owners' names and parcel numbers shown on adjoining properties, including those across streets.
(9) 
A location map for the purpose of locating the site to be subdivided, at a scale not less than 1,000 feet to the inch, showing the relation of the tract to adjoining property and to all streets, roads, sidewalks, multi-use paths and municipal boundaries existing within 1,000 feet of any part of the property proposed to be subdivided.
[Amended 11-19-2013 by Ord. No. 369]
(10) 
Original date, revised dates, north point and scale shown graphically and numerically.
(11) 
Restrictions in the deed affecting the subdivision or development of the property, including any underground, overhead or surface utility easements or rights-of-way. Copies of easements shall be submitted for review.
C. 
Existing features.
(1) 
Complete outline survey of the property to be subdivided or developed shall be provided, showing all courses, distances and area and tie-ins to all adjacent intersections. The survey shall not have an error of closure greater than one part in 10,000.
(2) 
Total acreage of the land to be developed or divided.
(3) 
The location, name and widths of all streets bordering the land to be developed or subdivided, including legislative and traffic route numbers, hierarchy as defined in § 153-24B(2)(e), and their existing and ultimate right-of-way.
[Amended 11-19-2013 by Ord. No. 369]
(4) 
The location of all existing buildings and their existing and proposed use or disposition.
(5) 
Location of all existing monuments, iron pipes or pins and spikes relative to the property.
(6) 
The location of any designated floodplain district, the one-hundred-year flood elevations and the boundaries of the floodplain districts, including those determined by soil classification or other studies.
(7) 
Contours at vertical intervals of two feet. Slopes of 15% to 25% and slopes of greater than 25% shall be mapped and shown on the plans. The total area of land within these slope characteristics shall be calculated and shown in table form on the plans. The area to be disturbed under the proposed plan application within each slope classification shall be shown and the area of proposed disturbance shall be shown and compared with the Zoning Ordinance[1] requirements on slope restrictions.
[1]
Editor's Note: See Ch. 175, Zoning.
(8) 
Datum to which contour elevations refer. Vertical datum shall be National Geodetic Vertical Datum (NGVD). The plans shall include the elevation, location and description of an NGVD bench mark for the site.
(9) 
Location, size and ownership of all underground utilities.
(10) 
The location of watercourses, wells, on-site septic systems, stormwater management facilities and similar features on and within 400 feet of any part of the land to be subdivided or developed.
(11) 
Species and size of large trees standing alone, mature trees with a diameter of 12 inches or greater as measured 14 inches above grade level, woodlands as defined herein, landfill areas, quarries, marshy areas, springs and areas subject to inundation.
(12) 
The soil classifications and boundary lines of all soils located on the tract, with specific reference to any alluvial soils boundary. Soil descriptions for all soil types shall be provided and any building restrictions due to wet soils, seasonally high water table or other restrictions shall be provided on the plans.
(13) 
Lakes, ponds and wetlands. All lakes, ponds and wetlands shall be shown. Wetland soils in Bucks County are: Bowmansville, Doylestown, Hatboro, Fallsington, Towhee and Towhee Stony, and should be considered indicators of possible wetland areas.
(14) 
Site capacity calculations as established in Article V of Chapter 175, Zoning. The following information and calculations shall be shown on the plans:
(a) 
Calculation of base site area.
(b) 
Calculation of net buildable site area.
(c) 
Area in acres affected by natural resources, including floodplains, wetlands, slopes of 15% to 25%, slopes over 25% and woodlands.
(d) 
Open space required for resource protection and/or open space preservation, as required by Chapter 175, Zoning.
(e) 
Amount of open space proposed by the plan.
(f) 
Number of dwelling units permitted according to site capacity calculations, and number of dwelling units proposed.
(g) 
Area of impervious surface proposed by the plan and impervious surface permitted by this chapter.
(15) 
The location of soil test pits or borings, and the elevation of the seasonal high-water table and/or permanent groundwater elevation, as required by § 153-44.1, Below-grade structures.
[Added 3-15-2011 by Ord. No. 359]
D. 
Proposed improvements.
(1) 
The layout, approximate dimensions, proposed use and consecutive numbering of all lots. All sheets shall show lot numbers.
(2) 
Building setback lines established by zoning or other ordinances or deed restrictions, with distances from the right-of-way line. Building setback lines from floodplains and wetlands shall be shown as chords and defined by metes and bounds.
(3) 
The location of zoning district boundary lines affecting the subdivision and an indication that each lot is equal to or in excess of the applicable zoning district requirements.
(4) 
An indication of any lots in which other than residential use is intended; the total number of lots created; and the gross lot area and net lot area for each lot.
(5) 
A reference to any land dedicated for public use or offered for dedication for playgrounds, parks, recreational areas, common areas, widening of streets or other public uses.
(6) 
The layout of all streets, alleys, sidewalks, multi-use paths, and bike lanes, including names and widths of cartways and rights-of-way.
[Amended 11-19-2013 by Ord. No. 369]
(7) 
Typical cross sections, and existing and proposed center line profile for each proposed or widened street and multi-use path shown on the preliminary plan, including the profile for proposed sanitary sewers, water mains and storm drains showing manholes, inlets and catch basins. Profiles of existing streets to be widened, extended or improved shall extend 400 feet beyond the tract boundaries. This plan(s) may be submitted as a separate sheet(s).
[Amended 11-19-2013 by Ord. No. 369]
(8) 
Tentative grades of streets extended to an existing street or to a point 400 feet beyond the boundaries of the subdivision. These plans may be submitted as separate sheets.
(9) 
The layout of all open space, including required open space and required recreation areas and the proposed ownership thereof.
(10) 
A proposed stormwater management plan, including a plan of the surface drainage system of the tract to be subdivided or developed, shall be provided along with supporting calculations showing watershed areas, inlets, pipe size and material, pipe slope, headwalls, endwalls and manholes and a statement of the design parameters utilized in arranging and sizing the system. The plan shall also include all grading and facilities proposed to control soil erosion and sedimentation during construction and proposed detention/retention facilities. Where feasible, best management practices which put the landscape to work, utilizing processes of nature to minimize or eliminate surface water discharge, shall be provided along with supporting calculations. The best management practices are to be designed by viewing components in a series, starting with runoff control at its source, seeking to infiltrate it and achieving quality improvement during conveyance.
[Amended 10-17-2000 by Ord. No. 295]
(11) 
Location and size of sanitary sewers, on-site sewage disposal facilities, gas mains, water mains, fire hydrants, streetlights, special structures and other underground conduits or structures, including all related appurtenances.
(12) 
Rights-of-way and/or easements proposed to be created for all drainage purposes, utilities and other pertinent reasons.
(13) 
The location of proposed monuments.
(14) 
Where the preliminary plan covers only a part of the applicant's entire holding, a sketch shall be submitted of the proposed street layout for the remainder.
(15) 
For all subdivision and land developments, except for single-family detached residential, the size and arrangement of buildings and parking areas, along with any length, area ratio, number or other physical characteristic referred to in Chapter 175, Zoning, as amended, shall be dimensioned or indicated on the plan.
(16) 
Within the floodplain district, any proposed lots, sites, fills, flood or erosion protective facilities and areas subject to special deed restrictions.
(17) 
The calculation of the total drainage area and the runoff characteristics of the proposed structures shall be included with the preliminary plan.
(18) 
A landscape plan for buffers as required by Chapter 175, Zoning, and for street trees and other landscape requirements as specified in § 153-34 of this chapter.
(19) 
Lighting plan. A lighting plan in accordance with the requirements of § 153-36 shall be submitted.
(20) 
Sewage facilities.
(a) 
General. The applicant shall submit the following information for review to ensure that the proposed method of sewage collection, treatment and disposal is adequate to serve the proposed subdivision or land development. The evaluation must establish that each proposed lot, building or structure will be served by an appropriate sewage system.
(b) 
Development applications not requiring revisions to the Official Sewage Facilities Plan. All plan submissions will require revisions to the Official Sewage Facilities Plan of the Township unless the Pennsylvania Department of Environmental Resources (DER) determines that a revision is not needed, based upon the criteria established in 25 Pa.Code Chapter 71 for planning module exceptions. Approval of the proposed sewage facilities plan module exception by the Pennsylvania Department of Environmental Resources shall be a condition of final subdivision or land development plan approval by the Township.
(c) 
Applications for revisions to the Act 537 Plan.[2]
[1] 
In order to be deemed a complete application, any application for preliminary subdivision or land development approval which requires a revision or exception to the Official Township Sewage Facilities Plan (Act 537 Plan) must be accompanied by a duly completed Department of Environmental Resources sewage facilities planning module. Such planning module shall also meet all the requirements contained in 25 Pa.Code Chapter 71, Subchapter D, Official Plan Requirements for Alternative Evaluations.
[2] 
Such application and planning module shall meet all the procedural and content requirements of 25 Pa.Code § 71.52 and § 71.53, including the requirement that they be accompanied by the comments on the planning module of the Bucks County Health Department and the Bucks County Planning Commission. Evidence that the sewage facilities planning module has been before these agencies for 60 days without comment shall be sufficient to satisfy this requirement.
[3] 
The Township shall review and act upon the requested revisions in accordance with the requirements and criteria set forth in 25 Pa.Code § 71.53 and may refuse to adopt a proposed revision of its Official Sewage Facilities Plan for new land development for reasons including but not limited to the following:
[a] 
The plan is not technically or administratively able to be implemented.
[b] 
Present and future sewage disposal needs of the area, remaining acreage or delineated lots are not adequately addressed.
[c] 
The plan is not consistent with the Township land use plans and ordinances, this chapter or other ordinances or plans controlling land use or development.
[d] 
The plan is not consistent with the comprehensive sewage program of the Township as contained in its Official Sewage Facilities Plan.
[e] 
The plan does not meet the consistency requirements set forth in 25 Pa.Code § 71.21(a)(5)(i) -- (iii).
[4] 
When the Township refuses to adopt a proposed revision to the Official Sewage Facilities Plan, it shall state the reasons for the refusal and forward a copy of this statement to the person making the submission and to the Department of Environmental Resources.
[5] 
When the Township adopts the proposed revisions to the Official Sewage Facilities Plan, the Township shall forward the proposed revisions to the Department with the information required by 25 Pa.Code § 71.52. Adoption of the proposed revisions of the official plan shall be by resolution.
[6] 
Approval of the proposed sewage facilities plan revision by the Pennsylvania Department of Environmental Resources shall be a condition of final subdivision or land development plan approval by the Township.
[2]
Editor's Note: See 35 P.S. § 750.1 et seq.
(d) 
Requirements for final plan approval. No final plan shall be approved for any subdivision or land development until satisfactory evidence has been presented by the applicant to the Township that the Bucks County Department of Health and/or the Pennsylvania Department of Resources have determined that the lots proposed for subdivision are generally suitable for on-lot septic systems.[3]
[3]
Editor's Note: See also Ch. 136, Sewers, § 136-4A.
(21) 
Landscape conservation plans. For developments of tracts greater than 40,000 square feet, a landscape conservation plan shall be submitted which shall show woodlands and trees as required to demonstrate that the standards set forth in Article VI, § 153-34C, Woodlands and tree preservation requirements, of this chapter are met and that the design standards of § 153-34B(6) of this chapter are met.
[Added 6-1-1993 by Ord. No. 226]
E. 
Traffic impact and pedestrian/bicycle circulation study.
[Amended 11-19-2013 by Ord. No. 369]
(1) 
Purpose and applicability.
(a) 
A transportation and pedestrian/bicycle circulation impact study shall be submitted as part of all subdivisions and land development and conditional use applications for all residential subdivisions of 20 lots or more and all commercial, office, industrial, institutional or other uses requiring land development approval. This study will enable Doylestown Township to assess the impact of proposed development or conditional use approval on the transportation and pedestrian circulation system, including pedestrian and bicycle travel, highways and public transportation in Doylestown Township. The purpose of the impact study is to ensure that proposed developments do not adversely affect the transportation network and to identify any traffic problems associated with access from the site to the existing multi-modal transportation network. The study's purpose is also to delineate solutions to potential problems and to present improvements to be incorporated into the proposed development. The study shall assist in the protection of air quality, the conservation of energy, the encouragement of pedestrian and bicycle travel, and the connection between the proposed development and schools, parks, commercial centers and public transportation.
(b) 
The Township, at its sole discretion, may require any other subdivision to be accompanied by a traffic impact study if, in the opinion of the Township, such a survey is necessary to determine the impact the proposed development will have on Township and state roads in the vicinity of the proposed development. The traffic impact study required pursuant to this subsection shall be performed in accordance with the standards as set forth hereinafter in this subsection. In those situations where the Township may require a traffic impact study, such a requirement shall be communicated in writing to the applicant immediately following the Planning Commission's first meeting to consider the proposal. Such a notification shall specify the reason for the requirement, citing the proposal's particular location or existing problems at that location or type of use (i.e., generation of heavy truck traffic).
(2) 
Definitions. As used in this subsection, the following terms shall have the meanings indicated:
LEVEL OF SERVICE
Level of service, as described in the 1985 Highway Capacity Manual, Special Report 209, indicates how well traffic moves on a particular highway facility or through a specific intersection. There are six levels of servicing ranging from A through F. Level of Service A indicates generally free movement. Level of Service E represents maximum capacity of the facility. Level F indicates congestion. Level of Service C is considered the design level of service, representing a stable traffic flow and a relatively satisfactory travel speed.
MAJOR INTERSECTION
Any intersection, either signalized or nonsignalized, where traffic generated by the proposal will have a significant impact on the operation of the intersection and/or any other intersection with an arterial or collector road. Where doubt exists, the transportation engineer shall seek guidance from the Township Manager prior to the submission of the traffic impact study.
PEDESTRIAN AND BICYCLE FACILITIES
Pedestrian and bicycle facilities shall include sidewalks, bike lanes, multi-use paths and designated bike routes on public streets including those routes identified in the Doylestown Township Comprehensive Plan and the Bike and Hike Plan which is part of the Comprehensive Plan and PennDOT designated bike routes.
PUBLIC TRANSPORTATION
Transportation service for the general public provided by a common carrier of passengers generally on a regular route basis, by the Southeastern Pennsylvania Transportation Authority or a private operator offering service to the public.
STUDY AREA
This area will extend along all Township and state roads serving the development to the nearest intersection with a major arterial road and shall, in any event, extend to all intersections along all roads within 1/2 airline mile area. Where doubt exists, the transportation engineer shall seek guidance from the Township Manager prior to the submission of the traffic impact study.
TRIP GENERATION RATES
The total count of trips to and from a study site per unit of land use as measured by parameters such as dwelling units, acres, etc., which said trip generation rates are established by the Institute of Transportation Engineers, Trip Generation Report, 4th Edition.
VOLUME/CAPACITY ANALYSIS
Procedures used to determine level of services and to evaluate the operational characteristics of a roadway or intersection. The procedures are described in the 1985 Highway Capacity Manual, Highway Research Board, and the results are expressed in level of service for roadway's, signalized and nonsignalized intersections.
WARRANTS FOR TRAFFIC SIGNAL INSTALLATION
This is a series of warrants which detail the minimum traffic or pedestrian volumes or other criteria necessary for the installation of a traffic signal. These warrants are contained in the Manual on Uniform Traffic Control Devices for Streets and Highways, United States Department of Transportation, Federal Highway Administration, 1988, as amended.
(3) 
General requirements and standards. A transportation and pedestrian/bicycle circulation impact study shall be performed by a qualified traffic engineer and/or transportation planner with previous traffic study experience and shall contain the following information:
(a) 
General site description. The site description shall include the size, location, proposed land uses, construction staging and completion date of the proposed subdivision or land development. If the development is residential, types of dwelling units shall also be included. A brief description of other major existing and proposed subdivisions and land developments within the study area shall be provided. The general site description shall also include probable socioeconomic characteristics of potential site users to the extent that they may affect the transportation needs of the site (i.e., number of senior citizens). The general site description shall also contain a demographic study which includes projections as to where new residents to be served by the development would work or shop and where employees of new commercial developments would live and the traffic generation effects of such a study. The general site description shall also include analysis of both vehicular and pedestrian/bicycle traffic projected to be generated by children in any new residential development going to and from school.
(b) 
Transportation and pedestrian/bicycle facilities description. The description shall contain a full documentation of the proposed internal and existing external transportation system. This description shall include proposed internal vehicular, bicycle and pedestrian circulation, all proposed ingress and egress locations, all internal roadway widths and rights-of-way, parking conditions, traffic channelization and any traffic signals or other intersection control devices at all intersections within the site. The site design shall be shown to maximize potential public transportation usage to and from the development, such as providing adequate turning radius at all access points to allow a bus to enter the development. Bus shelter and sign locations shall be designated where appropriate.
(c) 
The report shall describe the entire external roadway and pedestrian/bicycle system within the study area. Major intersections in the study area shall be identified and illustrated. All existing and proposed public transportation services and facilities within a one-mile radius of the site shall also be documented. All future highway improvements, including proposed construction and traffic signalization, shall be noted. This information shall be obtained from the 12-Year Highway Capital Program for the Delaware Valley Region and from the Pennsylvania Department of Transportation. Any proposed roadway improvements due to proposed surrounding developments shall be recorded.
(d) 
Existing traffic conditions. Existing traffic conditions shall be measured and documented for all roadways and intersections in the study area. Existing traffic volumes for average daily traffic, peak highway hour(s) traffic and peak development-generated hour(s) and documentation shall be included in the report. Manual traffic counts at major intersections in the study area shall be conducted, encompassing the peak highway and development-generated hour(s), and documentation shall be included in the report. All documentation shall be included in a technical appendix and consist of highway peak hour turning movement counts expressed in fifteen-minute increments, development-generated peak hour turning movement counts expressed in fifteen-minute increments, capacity analysis worksheets and all quantitative information used in the traffic analysis. A level of service analysis based upon existing volumes shall be performed during the peak highway hour(s) and the peak development-generated hour(s) for all roadways and major intersections in the study area. Levels of service shall be determined for each location. This analysis will determine the adequacy of the existing roadway system to serve the current traffic demand. Roadways and/or intersections experiencing Levels of Service D, E or F shall be noted as congested locations. The analysis shall make use of or reference the Township-wide traffic study where this study includes any analysis of roadways or intersections within the proposed study area.
(e) 
Transportation impact of the development. Estimation of vehicular trips to result from the proposal shall be completed for the average daily peak highway hour(s) and peak development-generated hour(s). Vehicular trip generation rates to be used for this calculation shall be obtained from the report entitled "Trip Generation, An Informational Report," Fourth Edition, Institute of Transportation Engineers, 1987. For all land uses proposed but not listed in the Institute report, the traffic engineer shall seek guidance from the Township Manager or his designee. All turning movements shall be calculated. These development-generated traffic volumes shall be distributed to the study area and assigned to the existing roadways and intersections throughout the study area. Documentation of all assumptions used in the distribution and assignment phase shall be provided in the technical appendix. Traffic volume shall be assigned to individual access points. Pedestrian volumes shall be calculated, if applicable. If school crossings are to be used, pedestrian volumes shall be assigned to each crossing. Any characteristics of the site that will cause particular trip generation problems shall be noted.
(f) 
Analysis of transportation impact. The total future traffic demand shall be calculated. This demand shall consist of the combination of the existing traffic expanded to the completion year (using an annual background traffic growth rate which best reflects the intensity of growth projected in Doylestown Township). The background growth rate shall reflect the consideration of other proposed developments within the study area. A list of the proposed developments may be obtained from the Township Manager and/or Township Engineer. The rates shall be based on acceptable parameters such as population and employment and be monitored to ensure that the rate accurately reflects local conditions, the development-generated traffic and the traffic generated by any other proposed developments in the study area. A second level of service analysis shall be conducted using the total future demand and the future roadway capacity. If staging of the proposed development is anticipated, calculations for each stage of completion shall be made. This analysis shall be performed during the peak highway hour(s) and peak development-generated hour(s) for all roadways and major intersections in the study area. Level of service calculations shall be completed for all major intersections. It is usually at these locations that capacity is most restricted.
(g) 
All access points and pedestrian/bicycle crossings shall be examined as to the feasibility of installing traffic signals. This evaluation shall compare the projected traffic and pedestrian volumes to the warrants for traffic signal installation.
(h) 
Analysis of existing roadway pavement conditions. Where the Subdivision and Land Development Ordinance requires the widening of existing pavement, the applicant shall:
[1] 
Take pavement cores and CBR values of the existing pavement at four-hundred-foot intervals staggered left to right in the path of the outside wheels of vehicles traveling the existing roadway.
[2] 
Submit an analysis of the existing pavement based on the foregoing core sample and analysis and the traffic volume, to determine the extent of roadway reconstruction needed.
[3] 
Submit a plan, profile and detailed road cross sections at fifty-foot intervals with existing and proposed elevations.
(i) 
Conclusions and recommended improvements.
[1] 
Levels of service for all roadways and intersections shall be listed. All roadways and/or intersections showing a level of service below C shall be considered deficient, and specific recommendations for the elimination of these problems shall be listed, unless design limitations preclude Level of Service C. Where such conditions exist, the traffic engineer shall seek guidance from the Township Manager prior to submission of the traffic impact study. This listing of recommended improvements shall include, but not be limited to, the following elements: internal circulation design, site access location and design, external roadway and intersection design and improvements, traffic signal installation and operation, including signal timing, and transit design improvements. All physical roadway improvements shall be shown in sketches.
[2] 
Other circulation conditions shall be described and analyzed, including sight distance at all proposed access points to the site; circulation of commercial vehicles (trucks, etc.) in nonresidential developments and in multifamily developments.
(j) 
Existing and/or future public transportation service shall also be addressed. A listing of all actions to be undertaken to increase present public transportation usage and improve service, if applicable, shall be included.
(k) 
The listing of recommended improvements for roadways, pedestrian/bicycle facilities and transit shall include, for each improvement, the party responsible for the improvement, the cost and funding of the improvement and the completion date for the improvement.
(4) 
Time of submission.
(a) 
The traffic impact study shall be submitted to the Township and Township Engineer as part of the preliminary plan application. The submission of the preliminary plan application shall be deemed incomplete if the required traffic impact study is not included in the submission.
(b) 
The improvement plans shall not be submitted to Pennsylvania Department of Transportation until after review by the Doylestown Township Planning Commission, the Doylestown Township Engineer and approved by the Doylestown Township Board of Supervisors. The submittal to PennDOT shall be accompanied by comments of Doylestown Township.
(5) 
Implementation. The Doylestown Township Planning Commission, Engineer and Board of Supervisors shall review the traffic impact study to analyze its adequacy in solving any traffic problems that will occur due to the subdivision or land development. The Board of Supervisors may decide that certain improvements on- or off-site are mandatory for plan approval and may attach these conditions to the approval.
F. 
Improvement construction plans. All subdivision and land development applicants shall submit improvement construction plans whenever any site improvement is planned or required. Such plans may be incorporated on the final record plan for minor land development and minor subdivision applications where feasible or required. Improvement construction plans shall consist of plan profile drawings of all proposed new streets, all existing streets proposed to be widened or improved, all easements associated with improvement construction and all proposed underground construction. Also included shall be lot grading plans, a soil erosion and sedimentation control plan in conformance with all applicable Pennsylvania Department of Environmental Resources and United Soil Conservation Service regulations and such additional drawings as required to detail the construction of all proposed subdivisions and land developments.
(1) 
The improvement construction plan shall be at any, of the following scales or other accepted design scales as approved by the Township Engineer:
Horizontal
Vertical
25 feet to the inch
5 feet to the inch
50 feet to the inch
5 feet to the inch
(2) 
Horizontal plan (streets). The horizontal plan shall show details of the horizontal layout, including:
(a) 
Center line with bearings, distances, curve data and stations corresponding to the profile; horizontal sight distances for intersections.
(b) 
Right-of-way lines and curblines with radii at intersections.
(c) 
Beginning and end of proposed construction.
(d) 
Tie-ins by course and distances to intersection of all public roads, with their names and widths.
(e) 
Location of all monuments with reference to them.
(f) 
Property lines and ownership of all properties within the site and abutting properties.
(g) 
Location and size of all drainage structures, sidewalks, public utilities, lighting standards and street name signs.
(3) 
Horizontal plan (storm drains and sanitary sewers).
(a) 
Location and size of pipeline with stations corresponding to the profile plan.
(b) 
Location of manholes or inlets with grade between and elevation of flow line and top of each manhole or inlet.
(c) 
Property lines and ownership of abutting properties and within the site lot lines and numbers, with details of easements where required.
(d) 
Beginning and end of proposed construction.
(e) 
Location of laterals.
(f) 
Location of all other drainage facilities and public utilities in the vicinity of storm and/or sanitary sewer lines, with clearance between same noted where necessary.
(g) 
Hydraulic design data for culverts and/or bridge structures.
(4) 
Profile (streets).
(a) 
Profile of existing ground surface along center line of street; profiles along cul-de-sac curblines. All profiles shall show high and low points and passing/stopping distances per PennDOT requirements.
(b) 
Proposed center-line grade with percent on tangents and elevations at fifty-foot intervals, grade intersections and either end of curb radii.
(c) 
Vertical curve data, including length, elevations and minimum sight distance as required by the Township Engineer.
(5) 
Cross section (streets) (refer to Appendix A).[4]
(a) 
Right-of-way width and location and width of paving; cross section and cross slope of paving.
(b) 
Type, thickness and crown of paving.
(c) 
Type and size of curb.
(d) 
Grading of sidewalk and multi-use path areas and adjacent slopes, including any necessary drainage facilities to prevent ponding of water or flooding of the facilities.
[Amended 11-19-2013 by Ord. No. 369]
(e) 
Location, width, type and thickness of sidewalks, multi-use paths, and driveway aprons.
[Amended 11-19-2013 by Ord. No. 369]
[4]
Editor's Note: Appendix A is on file in the Township offices.
(6) 
Profile (storm drainage and sanitary sewers).
(a) 
Typical location of sewers, storm drains and utilities with sizes.
(b) 
Detail of typical street and pedestrian/bicycle facilities cross sections.
[Amended 11-19-2013 by Ord. No. 369]
(c) 
Profile of existing ground surface with elevations at top of manholes or inlets.
(d) 
Profile of storm drain or sewer showing type and size of pipe, grade, cradle, manhole and inlet locations and elevations along flow line at fifty-foot intervals.
All subdivision and land development applicants shall submit a record plan conforming to the following standards and showing the following information:
A. 
Drafting standards. The standards required for a record plan shall be the standards required for preliminary plans as outlined in § 153-20A and also the following supplemental standards:
(1) 
(Reserved)[1]
[1]
Editor's Note: Former Subsection A(1), regarding drawing requirements for the plan, was repealed 2-16-2021 by Ord. No. 400.
(2) 
The plan shall be on sheets either 24 by 36 inches, 30 by 42 inches or 36 by 48 inches. All lettering shall be drawn so as to be legible if the plan should be reduced to fit on a sheet 11 by 17 inches.
(3) 
All plans must be acknowledged with a raised notary seal affixed; raised seal of registered engineer or land surveyor responsible for the plan; and raised seal of architect or landscape architect who collaborated in the preparation of the plan; and if the applicant is a corporation, a raised corporate seal. All plans must be approved by the Board of Supervisors, together with the raised official seal.
B. 
General information. The general information required for a record plan shall be the general information required for a preliminary plan as outlined in § 153-20B.
C. 
Existing features. The existing features required to be shown on a record plan shall be the existing features required for a preliminary plan as outlined herein.
D. 
Proposed improvements. The proposed improvements required to be shown on a record plan shall be as follows:
(1) 
Dimensions and bearings of each lot line, areas of lots and consecutive numbering of lots.
(2) 
Building setbacks, established by zoning or other ordinances or deed restrictions, with distances to the right-of-way line.
(3) 
An indication of any lots on which a use other than the zoned use is planned.
(4) 
A reference to any land dedicated for public use or offered for dedication for parks, playgrounds, recreational areas, widening of streets or other public uses.
(5) 
The layout of streets, alleys and walkways, including names and widths of cartways and rights-of-way, curblines, radius on right-of-way lines and curblines, courses and distances on right-of-way lines, and center line stationing and other such information.
(6) 
Rights-of-way and/or easements for any use, including drainage, utilities or other such pertinent requirements, by bearings, dimensions and width.
(7) 
Location of all proposed monumentation.
(8) 
location of any proposed lots, sites, fills or protective structures within the floodplain and location of areas subject to special deed restrictions relating to flooding.
(9) 
The layout of all open space areas, including the proposed ownership.
(10) 
The lighting plan as required in § 153-36 herein.
(11) 
Improvement construction plans as required by § 153-20F herein.
E. 
Notes and certificates. The record plan must include the required notes and certificates:
(1) 
On all applications where improvement construction plans are required, the following note shall appear on the record plan: "Sheets 2 through _____ inclusive, on record at Doylestown Township, shall be considered a part of the approved final plan as if recorded with same." These shall be listed by sheet number and title on the record plan.
(2) 
The signature of the registered land surveyor certifying that the plan represents a survey made by him; that the monuments shown hereon exist as located; and that the dimensional and geodetic details are correct.
(3) 
An acknowledgment as follows:
(a) 
Where the owner(s) are individuals, all shall join as follows:
Commonwealth of Pennsylvania:
SS.
County of
On the _____ day of ____________________, 19_____, before me the subscriber, a Notary Public of the Commonwealth of Pennsylvania, residing in ____________________, ____________________ personally appeared (name or names of all owners), known to me (or satisfactorily proven) to be the persons whose names (is/are) subscribed to the foregoing plan, and acknowledge that (he/she/they) (is/are) the registered (owner/owners) of the designated plan, that all necessary approval of the plan has been obtained and is endorsed thereon, and that (he/she/they) desire that the foregoing plan be recorded according to law.
Witness my hand and notarial seal, the day and year aforesaid.
Notary Public
My Commission Expires
(SEAL)
(b) 
Where the owner is a corporation:
Commonwealth of Pennsylvania:
SS.
County of
On the _____ day of ____________________, 19_____, before me the subscriber, a Notary Public of the Commonwealth of Pennsylvania, residing in ____________________, ____________________ personally appeared (name of officer of corporation), who acknowledged (himself/herself) to be the (president/ secretary) of (name of the corporation), a corporation, and that as such (president or secretary), being authorized to do so, (he/she) executed the foregoing plan by signing that the said corporation is the registered owner of the designated land, that all necessary approval of the plan has been obtained and is endorsed thereon, and that (he/she/they) desire that the foregoing plan be recorded according to law.
Witness may hand and notarial seal, the day and year aforesaid.
Notary Public
My Commission Expires
(SEAL)
(4) 
Approved notation by the Township shall be as follows:
Board of Supervisors:
Approved by the Board of Supervisors of the Township of Doylestown this _____ day of ____________________, 19_____.
Township Engineer:
(5) 
Recording notation:
Recorded in the office of the Recorder of Deeds, Bucks County, Pennsylvania, in Plan Book _______ Page _____ on the ____ day of ____________________, 19_____.
(6) 
Signatures to appear on plan. The following signatures shall be placed directly on the plan in black ink:
(a) 
The owner or owners of the land. If the owner of the land is a corporation, the signatures of the president and secretary and the corporate seal shall appear.
(b) 
The notary public acknowledging the owner's statement of intent.
(c) 
The licensed engineer or surveyor who prepared the plan. If an architect or a landscape architect collaborated in the preparation of the plan, his signature shall also appear.
(d) 
The Supervisors of Doylestown Township.
(7) 
The plan shall indicate that it has been reviewed by the Bucks County Planning Commission, in accordance with the Pennsylvania Municipalities Planning Code, Act 247, as amended,[2] and shall include the following notation:
Bucks County Planning Commission Notation
BCPC No.
PROCESSED AND REVIEWED. Report prepared by the Bucks County Planning Commission in accordance with the Municipalities Planning Code. Certified this date
Executive Director, Bucks County Planning Commission
[2]
Editor's Note: See 53 P.S. § 10101 et seq.