Rock shall be removed to the slopes and lines shown on the construction
details or as directed by the Town Engineer and shall be replaced with suitable
materials in such a manner as to provide a compacted earth cushion at least
12 inches below the subgrade of the pavement and at least eight inches below
the bottom of any drainage pipe. Blasting shall be done by competent personnel
with the necessary local permits. All blasts shall be properly covered and
safety precautions taken, all in accordance with the Safety Code of the State
of New York governing storage and use of explosives.