In the event that a person fails to comply with the requirements of
this chapter or fails to conform to the requirements of any permit issued
hereunder, the Borough shall provide written notification of the violation.
Such notification shall state the nature of the violation(s) and establish
a time limit for correction of these violation(s). Failure to comply within
the time specified shall subject such person to the penalty provisions of
this chapter. All such penalties shall be deemed cumulative and shall not
prevent the Borough from pursuing any and all remedies. It shall be the responsibility
of the owner of the real property on which any regulated activity is proposed
to occur, is occurring, or has occurred to comply with the terms and conditions
of this chapter.
The Borough governing body is hereby authorized and directed to enforce
all of the provisions of this chapter. All inspections regarding compliance
with the drainage plan shall be the responsibility of the Borough Engineer
or other qualified persons designated by the Borough.
A. A set of design plans approved by the Borough shall be
on file at the site throughout the duration of the construction activity.
Periodic inspections may be made by the Borough or designee during construction.
B. It shall be unlawful for any person, firm, or corporation to undertake any regulated activity under §
276-5 on any property except as provided for in the approved drainage plan and pursuant to the requirements of this chapter. It shall be unlawful to alter or remove any control structure required by the drainage plan pursuant to this chapter or to allow the property to remain in a condition which does not conform to the approved drainage plan.
C. At the completion of the project and as a prerequisite
for the release of the performance guarantee, the owner or his representatives
shall:
(1) Provide a certification of completion from an engineer,
architect, surveyor, or other qualified person verifying that all permanent
facilities have been constructed according to the plans and specifications
and approved revisions thereto.
(2) Provide a set of as-built (record) drawings.
D. After receipt of the certification by the Borough, a
final inspection shall be conducted by the Borough Engineer or designated
representative to certify compliance with this chapter.
E. Prior to revocation or suspension of a permit and at
the request of the applicant, the governing body will schedule a hearing to
discuss the noncompliance if there is no immediate danger to life, public
health, or property. The expense of a hearing shall be the applicant's
responsibility.
F. Occupancy permit. An occupancy permit shall not be issued unless the certification of completion pursuant to Subsection
C(1) has been secured. The occupancy permit shall be required for each lot owner and/or applicant for all subdivisions and land developments in the Borough.