License application fees:
| |
Sexually-oriented business license: $1,000.
| |
Renewal of sexually-oriented business license:
$500.
| |
Sexually-oriented business employee license:
$1,000.
| |
Chapter 73, Buildings
[Amended 5-10-2018 by Res. No. 2018-008] | |
Building permit: $50, plus $2 per thousand on
the value of the project
| |
Chapter 94, Flood Damage Prevention
[Amended 5-10-2018 by Res. No. 2018-008] | |
Building permit: $50, plus $2 per thousand on
the value of the project.
| |
Chapter 100, Grading
| |
Permit
|
Amount of Material to be Graded
(cubic yards)
|
Fee
|
500 to 1,000
|
$50.00
|
1,000 to 10,000
|
$100.00
|
10,000 to 100,000
|
$250.00
|
More than 100,000
|
$250.00, plus $25.00 for each $100,000 in excess
of the first $100,000
|
Chapter 108, Junk and Junk Dealers
| |
Junk dealer's license: $200
| |
Junk dealer's license transfer: $10
| |
Chapter 148, Peddling and Soliciting
| |
Permit: $25 per person
| |
Sewer tap-ins: $350
| |
Septic permit for on-lot systems: $50
| |
Deposit for new sewer account customers (present
accounts exempt): $50
| |
Letter of compliance: $15
| |
Municipal lien letter: $30
| |
Expedition fee for municipal lien letter: $10
| |
Posting for delinquent sewer bill: $25
| |
Dye test and compliance letter: $130
| |
Chapter 164, Streets and Sidewalks
| |
Street opening permits: $50
|
Chapter 167, Subdivision and Land Development
[Adopted 2-8-2001 by Res. No. 2001-002] | ||||||
A.
|
Planned residential developments.
| |||||
(1)
|
Township application fee: tentative approval:
| |||||
(a)
|
Filing fee: $300.
| |||||
(b)
|
Additional fee for the first three lots/dwelling
units: $500, plus for each additional lot/dwelling unit above three,
add the amount per lot as follows:
| |||||
[1]
|
Four to 60 lots/dwelling units: $50 per lot/dwelling
unit.
| |||||
[2]
|
Sixty-one to 150 lots/dwelling units: $40 per
lot/dwelling unit.
| |||||
[3]
|
One hundred fifty-one lots/dwelling units and
above: $35 per lot/dwelling unit.
| |||||
(c)
|
Revised tentative approval: $750.
| |||||
(2)
|
Township Engineer fees for tentative application:
| |||||
(a)
|
Actual costs to the Township of plan review,
report preparation, other services performed by the Township Engineer
and/or the Township Solicitor as billed to the Township at the normal
rate charged the Township for similar services.
| |||||
(b)
|
Method of payment.
| |||||
[1]
|
Upon initial submission of tentative application,
in addition to the application fee, the applicant shall make a deposit
to the Township as follows:
| |||||
[a]
|
Zero to 20 dwelling units: $2,500.
| |||||
[b]
|
Twenty-one to 40 dwelling units: $3,000.
| |||||
[c]
|
Forty-one to 60 dwelling units: $4,000.
| |||||
[d]
|
Sixty-one to 80 dwelling units: $4,500.
| |||||
[e]
|
Eighty-one to 100 dwelling units: $5,500.
| |||||
[f]
|
One hundred one to 150 dwelling units: $6,000.
| |||||
[g]
|
One hundred fifty-one to 200 dwelling units:
$6,500.
| |||||
[h]
|
Greater than 200 dwelling units: $9,000.
| |||||
[i]
|
Revised tentative plan: $2,000.
| |||||
[2]
|
From this amount shall be deducted any fees
accruing from the Township Engineer and/or Solicitor reviews. If at
any time during the progression of an application it is determined
by the Township that the balance available is or will be inadequate
to fully cover anticipated review costs, the applicant will be notified
that an additional deposit is required equal to the first deposit.
At the completion of the tentative application process, any of these
monies remaining on deposit with the Township after all fees are deducted
may be returned to the applicant upon written request.
| |||||
(3)
|
Township application fee: final PRD approval:
| |||||
(a)
|
Filing fee: $300.
| |||||
(b)
|
Additional fee for the first three lots/dwelling
units: $1,000, plus for each additional lot/dwelling unit above three,
add the amount per lot as follows:
| |||||
[1]
|
Four to 60 lots/dwelling units: $50 per lot/dwelling
unit.
| |||||
[2]
|
Sixty-one to 150 lots/dwelling units: $40 per
lot/dwelling unit.
| |||||
[3]
|
One hundred fifty-one lots/dwelling units and
above: $35 per lot/dwelling unit.
| |||||
(c)
|
Revision to final PRD approval: $750.
| |||||
(4)
|
Township Engineer fees for final application:
| |||||
(a)
|
Actual cost to the Township of plan review,
report preparation and other services performed by the Township Engineer
and/or the Township Solicitor as billed to the Township at the normal
rate charged the Township for similar services.
| |||||
(b)
|
Method of payment.
| |||||
[1]
|
Upon initial submission of final application,
in addition to the application fee, the applicant shall make a deposit
to the Township as follows:
| |||||
[a]
|
Zero to 20 dwelling units: $1,000.
| |||||
[b]
|
Twenty-one to 40 dwelling units: $1,500.
| |||||
[c]
|
Forty-one to 60 dwelling units: $2,500.
| |||||
[d]
|
Sixty-one to 80 dwelling units: $3,000.
| |||||
[e]
|
Eighty-one to 100 dwelling units: $4,000.
| |||||
[f]
|
One hundred one to 150 dwelling units: $4,500.
| |||||
[g]
|
One hundred fifty-one to 200 dwelling units:
$5,000.
| |||||
[h]
|
Greater than 200 dwelling units: $6,000.
| |||||
[i]
|
Revised final PRD plan: $1,000.
| |||||
[2]
|
From this amount shall be deducted any fees
accruing from the Township Engineer and/or Solicitor reviews. If at
any time during the progression of an application it is determined
by the Township that the balance available is or will be inadequate
to fully cover anticipated review costs, the applicant will be notified
that an additional deposit is required equal to the first deposit.
At the completion of any project, and after the final bond release
request has been granted by the Board of Commissioners, any of these
monies remaining on deposit with the Township after all fees are deducted
shall be returned to the applicant upon written request.
| |||||
B.
|
Subdivision.
| |||||
(1)
|
Application fee: preliminary approval:
| |||||
(a)
|
Filing fee: $300.
| |||||
(b)
|
For subdivisions of two or three lots, applicant
must submit an additional three-hundred-dollar fee. Any subdivision
in excess of three lots shall include an additional fee of $1,000,
plus the following:
| |||||
[1]
|
Four to 60 lots/dwelling units: $50 per lot/dwelling
unit.
| |||||
[2]
|
Sixty-one to 150 lots/dwelling units: $40 per
lot/dwelling unit.
| |||||
[3]
|
One hundred fifty-one lots/dwelling units and
above: $35 per lot/dwelling unit.
| |||||
(c)
|
Revised preliminary plan: $1,000.
| |||||
(2)
|
Township Engineer and Solicitor fees for preliminary
application:
| |||||
(a)
|
Actual costs to the Township of plan review,
report preparation and other services performed by the Township Engineer
and/or the Township Solicitor as billed to the Township at the normal
rate charged.
| |||||
(b)
|
Method of payment: application deposit:
| |||||
[1]
|
Upon initial submission of preliminary application,
in addition to the application fee, the applicant shall deposit the
following sum:
| |||||
[a]
|
Zero to five dwelling units: no deposit.
| |||||
[b]
|
Six to 20 dwelling units: $2,500.
| |||||
[c]
|
One to 40 dwelling units: $3,000.
| |||||
[d]
|
Forty-one to 60 dwelling units: $4,000.
| |||||
[e]
|
Sixty-one to 80 dwelling units: $4,500.
| |||||
[f]
|
Eighty-one to 100 dwelling units: $5,500.
| |||||
[g]
|
One hundred one to 150 dwelling units: $6,000.
| |||||
[h]
|
One hundred fifty-one to 200 dwelling units:
$6,500.
| |||||
[i]
|
Greater than 200 dwelling units: $9,000.
| |||||
[j]
|
Revised preliminary plan: $2,000.
| |||||
[2]
|
From this amount shall be deducted any fees
accruing from the Township Engineer and/or Solicitor reviews. If at
any time during the progression of an application it is determined
by the Township that the balance available is or will be inadequate
to fully cover anticipated review costs, the applicant will be notified
that an additional deposit is required equal to the first deposit.
At the completion of the preliminary application process, any of these
monies remaining on deposit with the Township after all fees are deducted
may be returned to the applicant upon written request.
| |||||
(3)
|
Application fee: final:
| |||||
(a)
|
Filing fee: $300.
| |||||
(b)
|
For subdivisions of two or three lots, applicant
must submit an additional three-hundred-dollar fee. Any subdivision
in excess of three lots shall include an additional fee of $1,000,
plus the following:
| |||||
[1]
|
Four to 60 lots/dwelling units: $50 per lot/dwelling
unit.
| |||||
[2]
|
Sixty-one to 150 lots/dwelling units: $40 per
lot/dwelling unit.
| |||||
[3]
|
One hundred fifty-one lots/dwelling units: $40
per lot dwelling unit.
| |||||
(c)
|
Revised final subdivision plan: $1,000.
| |||||
(4)
|
Township Engineer and Solicitor fees for final
application:
| |||||
(a)
|
Actual costs to the Township of plan review,
report preparation and other services performed by the Township Engineer
and/or the Township Solicitor as billed to the Township at the normal
rate charged.
| |||||
(b)
|
Method of payment: application of deposit:
| |||||
[1]
|
Upon initial submission of final application,
in addition to the application fee, the applicant shall deposit the
following sums:
| |||||
[a]
|
Zero to five dwelling units: no deposit.
| |||||
[b]
|
Six to 20 dwelling units: $1,000.
| |||||
[c]
|
Twenty-one to 40 dwelling units: $1,500.
| |||||
[d]
|
Forty-one to 60 dwelling units: $2,500.
| |||||
[e]
|
Sixty-one to 80 dwelling units: $3,000.
| |||||
[f]
|
Eighty-one to 100 dwelling units: $4,000.
| |||||
[g]
|
One hundred one to 150 dwelling units: $4,500.
| |||||
[h]
|
One hundred fifty-one to 200 dwelling units:
$5,000.
| |||||
[i]
|
Greater than 200 dwelling units: $6,000.
| |||||
[j]
|
Revised final plan: $1,000.
| |||||
[2]
|
From this amount shall be deducted any fees
accruing from the Township Engineer and/or Solicitor reviews. If at
any time during the progression of an application it is determined
by the Township that the balance available is or will be inadequate
to fully cover anticipated review costs, the applicant will be notified
that an additional deposit is required equal to the first deposit.
At the completion of any project and after the final bond release
request has been granted by the Township Board of Commissioners, any
of these monies remaining on deposit with the Township after all fees
are deducted shall be returned to the applicant upon written request.
| |||||
C.
|
Site plans and land development plans.
| |||||
(1)
|
Application fee: preliminary approval:
| |||||
(a)
|
Filing fee: $300.
| |||||
(b)
|
For site plans or land development plans in
excess of one acre and less than five acres, an additional fee of
$1,000. Any site plan or land development plan in excess of five acres
shall require the payment of a fee equal to $1,000 per acre in excess
of the five acres.
| |||||
(c)
|
Revised preliminary plan: $1,000.
| |||||
(2)
|
Township Engineer and Solicitor fees for preliminary
approval:
| |||||
(a)
|
Actual cost to the Township of plan review,
report preparation and other services performed by the Township Engineer
and(or the Township Solicitor, as billed to the Township at the normal
rate charged.
| |||||
(b)
|
Method of payment: application deposit.
| |||||
[1]
|
Upon initial submission of the preliminary application,
in addition to the application fee, the applicant shall deposit the
following sum:
| |||||
[a]
|
For site plans or land development plans of
one acre or less, the sum of $1,000.
| |||||
[b]
|
For site plans or land development plans in
excess of one acre, the sum of $1,000 per acre.
| |||||
[2]
|
From these amounts shall be deducted any fees
accruing from the Township Engineer and/or Solicitor reviews. If at
any time during the progression of an application it is determined
by the Township that the balance available is or will be inadequate
to fully cover anticipated review costs, the applicant will be notified
that an additional deposit is required equal to the first deposit.
At the completion of any project and after the final bond release
request has been granted by the Township Board of Commissioners, any
of these monies remaining on deposit with the Township after all fees
are deducted shall be returned to the applicant upon written request.
| |||||
(3)
|
Application fee: final:
| |||||
(a)
|
Actual costs to the Township of plan review,
report preparation and other services performed by consultants and/or
the Township Solicitor, as billed to the Township at the normal rate
charged.
| |||||
(b)
|
Method of payment: application deposit.
| |||||
[1]
|
Upon initial submission of the final application,
in addition to the application fee, the applicant shall deposit the
following sum:
| |||||
[a]
|
For site plans or land development plans of
one acre or less, the sum of $1,000.
| |||||
[b]
|
For site plans or land development plans in
excess of one acre, the sum of $1,000 per acre.
| |||||
[2]
|
From these amounts shall be deducted any fees
accruing from the Township Engineer and/or Solicitor reviews. If at
any time during the progression of an application it is determined
by the Township that the balance available is or will be inadequate
to fully cover anticipated review costs, the applicant will be notified
that an additional deposit is required equal to the first deposit.
At the completion of any project and after the final bond release
request has been granted by the Township Board of Commissioners, any
of these monies remaining on deposit with the Township after all fees
are deducted shall be returned to the applicant upon written request.
| |||||
D.
|
Bond release requests: $50, plus actual costs
of Engineer's inspection.
| |||||
E.
|
Reservation. The Township of Patterson reserves
the right to reserve building permits and/or occupancy permits until
such time as the account balance of fees due for the applicant has
been reconciled.
|
Chapter 190, Zoning
| ||
Mobile homes
| ||
Placement: $50
| ||
Removal: $25
| ||
Conditional use permits: $100, plus legal fees
| ||
Sign permits
| ||
Permanent signs: $15
| ||
Temporary signs: $10
| ||
Zoning variances: $250, plus legal fees
| ||
Miscellaneous
| ||
Swimming pools
| ||
Aboveground pools with a five-hundred-gallon
minimum capacity (each new pool requires a new permit): one-time permit
fee of $25
| ||
In-ground pool permit fee: $50
| ||
Wireless telecommunications towers and antennas
[Added 10-14-2021 by Res. No. 2021-009] | ||
Permit fee: $500 per application for no more than five co-located
wireless communication facilities plus $100 for each co-located wireless
communication facility in excess of five
| ||
Annual right-of-way fee: $270 per wireless communication facility
| ||
Permit fee: $1,000
| ||
Reimbursement for right-of-way use: $270 per telecommunication
tower per year
|