Any subdivider who proposes to develop a subdivision
in the Town of Stillwater shall follow the procedures specified in
this article.
[Amended 6-4-2020 by L.L. No. 1-2020]
The review and approval procedure for a lot-line
adjustment will be the same as the review and approval procedure for
a minor subdivision, unless the following conditions are met, in which
case the Building and Planning Department may waive the requirements
for Planning Board review and the public hearing on such proposal
and approve such lot-line adjustment:
A. The area of the proposed land exchange or transfer
does not exceed the minimum requirements of the area of the zoning
district in which the affected lands are located.
B. No additional lots will be created.
C. Such exchange or transfer of lands does not preclude
the proper future development, subdivision, or resubdivision of the
affected properties and will not impede the maintenance of existing
or development of future access or utility service to either lot.
D. Such exchange or transfer of lands shall not create any nonconformity with the terms and regulations of Chapter
210, Zoning, or this chapter.
E. The subdividers(s) has prepared and submitted for
approval by the Building and Planning Department a final plat, prepared
to the specifications set forth in this chapter, except for plat details
that are specifically waived by the Building and Planning Department.
F. The subdivider has submitted the application for the
lot-line adjustment, paid the application fee and paid the final plat
fee as set forth in this chapter.