A. 
Notice for final inspection shall be given to the County for all private sewage systems installed, modified or reconnected. Notice for inspection shall be given 24 hours in advance. Failure to notify the Zoning Department 24 hours in advance will result in an additional fee under § 518-24B(7).
B. 
Private sewage systems shall be inspected by the County for compliance with Chapters SPS 382, SPS 383, SPS 384, and SPS 391, Wisconsin Administrative Code, other appropriate Wisconsin Statutes and Administrative Codes and this chapter.
C. 
Notification for final inspection shall be given in accordance with the requirements of Chapter SPS 383, Wisconsin Administrative Code.
D. 
When a private sewage system is ready for inspection, the plumber in charge shall make arrangements to enable the inspector to inspect all parts of the system. The plumber shall provide the proper apparatus, equipment and necessary assistance to make a proper inspection.
E. 
Private sewage systems may be inspected periodically, after the initial installation inspection(s) and/or after the system is operative, as deemed necessary by the County.
A. 
All site-constructed holding tanks shall be inspected after the floor is poured and the keyway and water stop are installed or after the forms for the tank walls have been set but in all instances before any concrete for the walls has been poured.
B. 
Concrete walls may be poured only after it has been determined that the tank, as formed, complies with the approved plans.
C. 
This inspection shall not eliminate the need for an inspection after the installation has been completed.
A. 
All nonplumbing sanitary systems installed shall be inspected for compliance with Chapter SPS 391, Wisconsin Administrative Code, as amended, and this chapter. Nonplumbing sanitary systems serving uses other than one- and two-family dwellings shall also be inspected for compliance with the Wisconsin Administrative Code.
[Amended 4-21-2015 by Ord. No. 1-15]
B. 
The property owner shall notify the County for inspection immediately after the nonplumbing sanitary system has been constructed or installed.
For experimental systems and systems not recognized by § SPS 383.61, Wisconsin Administrative Code:
A. 
The plumber installing the system shall:
(1) 
Coordinate any required preconstruction meeting(s).
(2) 
Notify the County at least two workdays prior to beginning the installation of the system to schedule the inspection(s) and shall notify the state as may be required by the approved plans.
B. 
Inspections shall be done pursuant to the approved plan requirements and as deemed necessary by the County to assure compliance with appropriate codes and the plan approval.
A. 
A reinspection fee may be assessed when a reinspection of a private sewage system is required because the initial inspection disclosed that the installation is incomplete at the scheduled inspection time or does not comply with applicable Wisconsin Statutes, Administrative Codes, the approved plans or this chapter [see § 518-24B(2)]. Each additional reinspection required at the site will require a fee.
B. 
The reinspection fee shall be due within 10 workings days of written notification by the County. Failure to pay this fee within that period shall constitute a violation of this chapter.
A. 
If testing of new systems or new system components is required by Chapter SPS 382, SPS 383 or SPS 384, Wisconsin Administrative Code, or as a condition of plan approval, notice shall be given to the County as specified in § 518-25C so that the County may make an inspection during the test.
B. 
The County shall verify that required testing has been completed by:
(1) 
Performing an inspection during the test;
(2) 
Requiring written verification from the responsible person; or
(3) 
Both Subsection B(1) and (2).