This section shall apply to nonresidential development.
No street that is paved with macadam or bituminous
macadam or is unpaved, in whole or in part, shall be accepted by the
Township.
[Amended 11-2-1987]
If the street is to be sewered, a written contract
by the constructors of the sewer shall be filed with the Township
Engineer, wherein the constructors shall agree with the Township that
they will fill in, to the satisfaction of the Township Engineer, any
depressions or settlings of ground over the sewer which may occur
within one year from the date of the contract and that they will complete
any such filling in within 10 days after notice to do so is given
to them by the Township Engineer.
Sewer connections with the public sewers shall not be permitted from any street hereafter laid out by property owners other than in compliance with the provisions of this article and Chapter
454, Article
I, nor shall sewer connections be permitted unless the sewer in the street is laid out and built under the supervision of the Township Engineer and according to their instructions.
[Added 11-2-1987; 5-5-2008 by Ord. No. 08-18]
Any person who violates any provision of this article shall, upon conviction thereof, be subject to a penalty as provided by §
1-15, General penalty, of this Code.