[NOTE: Applications for construction or reconstruction of driveways
leading onto U.S. 9 should be made to NYS Dept. of Transportation,
County Resident Engineer, Hudson, New York.]
Fee: $5.00
|
|
|
|
A sketch of the proposed driveway shall be submitted with each
permit application using the diagram indicated on the reverse side.
The drainage flow involved shall also be indicated.
|
Where curbs occur it is necessary to provide curb cuts with
tapered sections at ends. Where drainage is carried along the curb,
the driveway shall be constructed with a short upgrade at start of
same.
|
A driveway must be constructed so that it does not adversely
affect the street or highway drainage. The drainage collected by ditches,
gutters or pipes on private property shall not be discharged in highway
drainage system.
|
Where the construction of a driveway necessitates crossing a
highway ditch, a culvert pipe made of corrugated metal may be installed
in the ditch by the permittee. Under no circumstances will existing
ditches or gutters be filled without adequate provisions for alternate
drainage being provided. Culvert pipe shall be of a size adequate
to carry the anticipated flow in the ditch; the culvert shall not
be smaller than 12 inches I.D.
|
Removal and replacement of sidewalks, if required, will be done
at the owner's expense.
|
I hereby apply for a permit to construct or reconstruct a driveway
as set forth above.
|
The permit must be exercised within 6 months or it will be considered
void.
|
Signature of applicant:
|
|
|
Owner
|
Contractor
|
Date ________________________________, 20_____
|
Any additional conditions required by the Village Highway Superintendent
for approval shall be stated on the application.
|
|
|
![A134 Application.tif A134 Application.tif](/attachment/KI0572/KI0572-A134 Application.tif.SM.png) |