No.
|
Item Description
|
Prior to Certificates of Occupancy
|
After Certificates of Occupancy Issued
| |
---|---|---|---|---|
1
|
Mobilization and general conditions
|
X
| ||
2
|
Clearing site/demolition
|
X
| ||
3
|
Excavation
|
X
| ||
3A
|
Roadway excavation (existing road)
|
X
| ||
3B
|
Roadway excavation (new road)
|
X
| ||
3C
|
Parking lot excavation
|
X
| ||
4
|
Class I roadway
| |||
4A
|
Subbase
|
X
| ||
4B
|
Base course
|
X
| ||
4C
|
Top course
|
X
| ||
4D
|
Parking lot
|
X
| ||
4E
|
Striping
|
X
|
X (with temporary)
| |
5
|
Storm drainage
| |||
5A
|
Drainage pipe and culverts
|
X
| ||
5B
|
Drainage inlets
|
X
| ||
5C
|
Sedimentation basin
|
X
| ||
5D
|
Soil erosion control
|
X
| ||
6
|
Sanitary sewer
| |||
6A
|
Gravity sanitary sewer
|
X
| ||
6B
|
Sewer force main
|
X
| ||
6C
|
Sewer service connections
|
X
| ||
6D
|
Sewage pump station
|
X
| ||
6E
|
Treatment plant improvements
|
X
|
X (punch list)
| |
7
|
Manholes and inlets
| |||
7A
|
Precast sanitary/storm manholes
|
X
| ||
7B
|
Reset inlets and manhole covers
|
X
| ||
8
|
Water service
| |||
8A
|
Water main and valves
|
X
| ||
8B
|
Hydrant installations
|
X
| ||
8C
|
Water service connections
|
X
| ||
8D
|
Water treatment plant improvements
|
X
|
X (punch list)
| |
9
|
Landscaping
| |||
9A
|
Topsoil and seed
|
X
| ||
9B
|
Shade trees
|
X
| ||
9C
|
Other landscaping
|
X
| ||
10
|
Concrete curb
|
X
| ||
11
|
Sidewalk
|
X
| ||
12
|
Guide rail
|
X
| ||
13
|
Streetlighting
|
X
| ||
14
|
Monumentation
|
X
| ||
15
|
Cleanup and demobilization
|
X
|
Engineer's Estimate
|
Multiplier
|
Bond Amount
| |
---|---|---|---|
$0 to $100,000
|
2.0
|
Up to $200,000
| |
$100,001 to $500,000
|
1.5
|
Up to $750,000
| |
Greater than $500,000
|
1.3
|
From $650,000
|