For the purposes of this chapter, certain terms and words used herein shall be interpreted as follows:
A. 
Words used in the present tense include the future tense; the singular number includes the plural, and the plural number includes the singular; words of masculine gender include feminine gender, and words of feminine gender include masculine gender.
B. 
The word "includes" or "including" shall not limit the term to the specific example but is intended to extend its meaning to all other instances of like kind and character.
C. 
The words "shall" and "must" are mandatory; the words "may" and "should" are permissive.
As used in this chapter, the following terms shall have the following meanings indicated:
ACCELERATED EROSION
The removal of the surface of the land through the combined action of human activities and the natural processes, at a rate greater than would occur because of the natural process alone.
AGRICULTURAL OPERATION
The cultivating of soil, the raising of livestock or poultry, and the harvesting of products of the soil, including, but not limited to, nurseries, horticulture and forestry.
APPLICANT
A landowner, developer or other person who has filed an application for approval to engage in any earth disturbance activity at a project site in the municipality.
BOROUGH
The Borough of Trappe, Montgomery County, Pennsylvania.
BOROUGH DESIGNATED OFFICIAL
Person or persons designated by the Borough Council to carry out the responsibilities of this chapter.
CONSERVATION DISTRICT
The Montgomery County Conservation District.
DEVELOPER
A person that seeks to undertake any earth disturbance activities at a project site in the municipality.
DEVELOPMENT
See "earth disturbance activity." The term includes redevelopment.
DEVELOPMENT SITE
The specific tract of land where any earth disturbance activities in the municipality are planned, conducted or maintained.
EARTH DISTURBANCE ACTIVITY
A construction or other human activity which disturbs the surface of the land, including, but not limited to, clearing and grubbing, grading, excavation, fill, embankments, road maintenance, building construction and the moving, depositing, stockpiling or storing of soil, rock or earth materials.
EROSION
The natural process by which the surface of the land, including channels, is worn away by water, wind or chemical action.
EROSION AND SEDIMENT CONTROL PLAN
A plan for a project site which identifies the activities, facilities, designs, measures or procedures to be employed that minimize erosion and sedimentation resulting in negative environmental impacts.
GRUBBING
To clear by digging up roots and stumps.
MUNICIPALITY
Borough of Trappe, Montgomery County, Pennsylvania.
PADEP
The Pennsylvania Department of Environmental Protection.
PERSON
An individual, partnership, public or private association or corporation, or a governmental unit, public utility or any other legal entity whatsoever which is recognized by law as the subject of rights and duties.
PROJECT SITE
The specific area of land within a development site where any earth disturbance activities in the municipality are planned, conducted or maintained.
REDEVELOPMENT
Earth disturbance activity on land which has previously been disturbed or developed.
REGULATED EARTH DISTURBANCE ACTIVITY
Earth disturbance activity of 2,000 square feet or more with a point source discharge to surface waters of the municipality's storm sewer system, or one acre or more regardless of the planned runoff. Regulated earth disturbance activity includes earth disturbance on any portion of, part of or during any stage of a larger common plan of development.
ROAD (STREET) RIGHT-OF-WAY
The legal cross section of land with which state or municipal access exists for conveyance of public vehicular traffic. Roads/streets may be asphalt paved, gravel or as yet undeveloped such as paper streets.
ROAD MAINTENANCE
Earth disturbance activity within the existing right-of-way cross section, such as grading and repairing existing unpaved road surfaces, cutting road banks, cleaning or clearing drainage ditches and other similar activities. Where the road maintenance activity maintains the original configuration and topography of the road and does not disturb the surface of the land, such activity shall not constitute earth disturbance activity.
SCOUR
To clear, dig or remove by a powerful current of water.
WATERCOURSE
A channel or conveyance of surface water, such as a stream or creek, having defined bed and banks, whether natural or artificial, with perennial or intermittent flow.