Prior to the granting of final approval, the applicant shall have installed or furnished a performance guaranty, pursuant to Article 57 of this chapter, for the on-tract improvements specified in Subsections A through M below. All such improvements shall be subject to approval and inspection by the Borough Engineer or other authorized persons, who shall be notified by the developer at least two weeks prior to the start of construction of any such improvements and at least 48 hours prior to the completion of any phase of an installation. No underground installation shall be covered until inspected and approved. Applicable improvements shall include but not be limited to the following:
A. 
Streets, curbs and sidewalks.
B. 
Street signs.
C. 
Underground electric, gas, telephone and cable television service lines.
D. 
Surface and stormwater drainage.
E. 
Grading.
F. 
Streetlights.
G. 
Sanitary sewers.
H. 
Shade trees.
I. 
Screening and buffering.
J. 
Topsoil and seeding.
K. 
Monuments.
L. 
Test borings, if required.
M. 
Other improvements as required.
Prior to the granting of final approval, the applicant shall have installed or furnished a performance guaranty, pursuant to Article 57 of this chapter, for the on-site improvements, as specified in Subsections A through G below, prior to the issuance of a zoning permit for buildings. All such improvements shall be subject to approval and inspection by the Borough Engineer or other authorized persons and the posting of a maintenance guaranty pursuant to Article 58 of this chapter. Applicable improvements shall include but not be limited to the following:
A. 
Driveway and parking lot pavement.
B. 
Lighting.
C. 
Driveway and parking lot curbing.
D. 
Walkways.
E. 
Landscaping.
F. 
Retaining walls, guardrails, safety fencing and traffic barricades.
G. 
Other improvements as required.