[Adopted 11-21-2006 by Ord. No. 2120-06]
If a property owner who is participating in
the Homeowner Housing Rehabilitation Program, after the expenditure
of funds by the Township, either fails to sign the documents necessary
for participation in said program or withdraws from said program after
the project has been publicly bid and a contract awarded, then such
property owner shall be required to reimburse the Township for all
professional consultant fees actually incurred in the preparation
of the construction documents for public bidding along with any other
subconsultant fees related to preparation of the bid documents.
Upon failure of the property owner to reimburse
the Township for the professional consultant fees or subconsultant
fees due, the Township shall place a lien on the subject property
to recover any and all professional consultant fees, subconsultant
expenses and other charges incurred by the Township.
[Adopted 1-20-2009 by Ord. No. 2175-09]