Street improvements and the installation of water lines, sanitary
sewers, and storm drainage facilities within the limits of the Borough
shall be made in full compliance with specifications and requirements
of those regulations and shall be subject to the approval of the Borough
Engineer. Installation of water lines, individual wells, private water
supply systems, sanitary sewers and individual or collective sewage
disposal facilities shall be made in accordance with the standards
and requirements of the state and other authorities having jurisdiction
over such installments.
Monuments shall be placed in all subdivisions as determined
by the Borough Engineer. Monuments shall be permanent reference monuments
of a size and material according to Borough specifications. Iron pins
shall be placed at all subdivision boundary corners, angle points,
points of curvature, lot corners, and intermediate points as determined
by the Borough Engineer.
Should the subdivider plan to provide trees, their proposed
location, spacing and species must be submitted for approval to the
Council.