Any downstream or off-site hydraulic capacity analysis conducted
in accordance with this chapter shall use the following criteria for
determining adequacy:
A. Natural or man-made channels or swales must be able to convey the
postdevelopment runoff associated with a bankfull event (or two-year
storm event) at velocities consistent with protection of the channels
from erosion. Acceptable velocities shall be based upon criteria included
in the PADEP Erosion and Sediment Pollution Control Program Manual.
B. Natural or man-made channels or swales must be able to convey the
postdevelopment twenty-five-year design storm runoff without creating
any hazard to persons or property.
C. Culverts, bridges, storm sewers or any other facilities which must
pass or convey flows from the tributary area must be designed in accordance
with PADEP, Chapter 105, regulations (if applicable) and, at a minimum,
pass the postdevelopment twenty-five-year design storm runoff.
D. It must be demonstrated that the downstream conveyance channel, other
stormwater facilities, roadways, or overland areas are capable of
safely conveying the one-hundred-year design storm without causing
additional damage to buildings or other infrastructure.
E. Proposed projects must be consistent with regulations from the National
Flood Insurance Program and all ordinances and sections of the Mahoning
Township Code adopted in conformance therewith.