A grading or building permit may not be issued for any parcel
or lot unless the final erosion and sediment control and stormwater
management plan has been approved by the Town as meeting all the requirements
of this chapter and the Design Manual. Where appropriate, a building
permit may not be issued without:
A. Recorded easements for the stormwater management facility and easements
to provide adequate access for inspection and maintenance from a public
right-of-way.
B. A recorded stormwater management maintenance agreement as described in Article
X, §
146-27, of this chapter.
C. A performance bond, an irrevocable letter of credit or other surety
as described in this chapter.
D. Permission from adjacent property owners as may be required.
Any grading or building permit issued by Galena may be suspended
or revoked after written notice is given to the permittee for any
of the following reasons:
A. Any violation(s) of the conditions of the stormwater management plan
approval.
B. Changes in site runoff characteristics upon which an approval or
waiver was granted.
C. Construction is not in accordance with the approved plans.
D. Noncompliance with correction notice(s) or stop-work order(s) issued
for the construction of the stormwater management practice.
E. An immediate danger exists in a downstream area in the opinion of
the Town.
In granting the plan approval, the Town may impose such conditions
thereto as may be deemed necessary to ensure compliance with the provisions
of this chapter and the preservation of the public health and safety.