[Ord. 621, 2/22/1993, § 401; as amended by Ord.
741, 12/30/2002, § 1]
1. General Requirements. The following information shall be submitted
prior to final approval:
A. All information pertaining to stormwater management from the preliminary
plan along with any changes.
B. Final maps showing the exact nature and location of all temporary
and permanent stormwater management controls along with design and
construction specifications.
C. A schedule for the installation of all temporary and permanent stormwater
control measures and devices.
D. An accurate survey showing all current and proposed easements and
rights-of-ways and copies of all proposed deed restrictions.
E. A maintenance program establishing ownership and maintenance responsibilities
for all stormwater control facilities (identify specific person or
entity) and detailing financial requirements and sources of funding.
Submit any legal agreements required to implement the maintenance
program and copies of the maintenance agreement as specified by this
Part.
F. Financial guarantees, to ensure that all stormwater controls are
installed properly and functioning satisfactorily.
G. Anything else within reason that might be required by the Borough
Engineer and/or Borough of Jefferson Hills to effectuate the purposes
of this Part.