No construction or installation of improvements shall commence
in a proposed subdivision or land division until the final plat or
certified survey map has been approved by the Common Council and recorded
with the Grant County Register of Deeds.
No building permits shall be issued for erection of a structure
on any lot not of record until the final plat or certified survey
map has been approved by the Common Council and recorded with the
Grant County Register of Deeds.
The following plans and accompanying construction specifications
may be required by the Common Council before authorization of construction
or installation of improvements:
A. Street plans and profiles showing existing and proposed grades, elevations
and cross sections of required improvements.
B. Sanitary sewer plans and profiles showing the locations, grades,
sizes, elevations and materials of required facilities.
C. Storm sewer plans and profiles showing the locations, grades, sizes,
cross sections, elevations and materials of required facilities.
D. Water main plans and profiles showing the locations, sizes, elevations
and materials of required facilities.
E. Erosion and sedimentation control plans showing those structures
required to retard the rate of runoff water and those grading and
excavating practices that will prevent erosion and sedimentation.
F. Additional special plans or information as required.
The subdivider agrees to abide by all of the terms and provisions
of any and all applicable rules, orders, laws, and provisions of the
Wisconsin Statutes, the Wisconsin Administrative Code, the Municipal
Code of the City of Lancaster and any other governing or administrative
agency having authority over site erosion.
The subdivider shall make every effort to protect and retain
all existing trees, shrubbery, vines, and grasses not actually lying
in public roadways, drainage ways, building foundation sites, private
driveways, soil absorption waste disposal areas, paths, and trails.
Such trees are to be protected and preserved during construction in
accordance with sound conservation practices, including the preservation
of trees by well islands or retaining walls whenever abutting grades
are altered.
The subdivider, prior to commencing any work within the subdivision
or land division, shall make arrangements with the City Engineer to
provide for adequate inspection. The City Engineer shall approve all
completed work prior to release of sureties.