[R.O. 2011 §510.010; Ord. No. 028-87 §4-19.1, 5-6-1987]
The work of sewer mains shall consist of furnishing materials
for, and installing sanitary sewer lines including all piping, manholes,
and related appurtenances in conformity with the lines and grades
required. Complete installation drawings including all elevations,
slopes and special details shall be furnished for approval to the
Building Commission.