As a condition to the approval of a site plan, the Planning Board may require the dedication of an additional right-of-way in accordance with the Master Plan adopted by the Mayor and Council or an Official Borough Map adopted by the Mayor and Council. On an existing road, the additional right-of-way shall be that portion of the site which abuts a road and which lies between the existing right-of-way and the proposed future right-of-way line for the road as set forth on the duly adopted Borough Master Plan or Official Borough Map. However, where the proposed future right-of-way lines for the existing county road are drawn so that the total additional right-of-way is to be secured from just one side of the road, only 1/2 of that additional right-of-way shall be required to be dedicated as a condition to the approval of the site plan. Also, the Planning Board may require the reservation of the remaining area of future right-of-way for future acquisition. The building setback line shall be measured from the future right-of-way line. In order to effect dedications required by this section, a deed for such lands shall be furnished to the Borough in a form approved by the Borough Attorney.
[Amended 12-8-1993 by Ord. No. 93:19]
A. 
As a condition of final site plan approval, the Planning Board may require and shall accept, for the purpose of assuring the installation and maintenance of on-tract improvements:
(1) 
The furnishings of a performance guarantee in favor of the Borough in an amount not to exceed 120% of the cost of installation, which cost shall be determined by the Borough Engineer according to the method of calculation set forth in N.J.S.A. 40:55D-53.4, or any amendatory statute thereto, for improvements which the Planning Board may deem necessary or appropriate, including streets, grading, pavement, gutters, curbs, sidewalks, streetlighting, shade trees, surveyor's monuments as shown on the final map and required by the Map Filing Law (N.J.S.A. 46:23-9.9 et seq.), water mains, culverts, storm sewers, sanitary sewers or other means of sewage disposal, drainage structures, erosion control and sedimentation control devices, public improvements of open space and other on-site improvements and landscaping. The Borough Engineer shall prepare an itemized cost estimate of the improvements covered by the performance guarantee, which itemized cost estimate shall be appended to each performance guarantee posted by the obligor.
(2) 
Provision for a maintenance guarantee to be posted with the governing body for a period not to exceed two years after final acceptance of the improvement, in an amount not to exceed 15% of the cost of the improvement, which cost shall be determined by the Borough Engineer according to the method of calculation set forth in N.J.S.A. 40:55D-53.4. In the event that other governmental agencies or public utilities automatically will own the utilities to be installed or the improvements are covered by a performance or maintenance guarantee to another governmental agency, no performance or maintenance guarantee, as the case may be, shall be required by the Borough for such utilities or improvements.
B. 
The time allowed for installation of the improvements for which the performance guarantee has been provided may be extended by the governing body by resolution. As a condition or as part of any such extension, the amount of any performance guarantee shall be increased or reduced, as the case may be, to an amount not to exceed 120% of the cost of the installation, which cost shall be determined by the Borough Engineer according to the method of calculation set forth in N.J.S.A. 40:55D-53 as of the time of the passage of the resolution.
C. 
If the required improvements are not completed or corrected in accordance with the performance guarantee, the obligor and surety, if any, shall be liable thereon to the Borough for the reasonable cost of the improvements not completed or corrected, and the Borough may, either prior to or after receipt of the proceeds thereof, complete such improvements. Such completion or correction of improvements shall be subject to the public bidding requirements of the Local Public Contracts Law, N.J.S.A. 40A:11-1 et seq. The obligor shall also be liable for reasonable attorney fees incurred to enforce a performance guaranty.
[Amended 1-12-1994 by Ord. No. 93:20]
D. 
The performance and maintenance guarantees shall be approved by the governing body, upon the advice of the Borough Attorney as to form, sufficiency and execution.
[Amended 12-8-1993 by Ord. No. 93:19]
A. 
Upon substantial completion of all required street improvements (except for the top course) and appurtenant utility improvements, and the connection of same to the public system, the obligor may request of the governing body in writing, by certified mail addressed in care of the Borough Clerk, that the Borough Engineer prepare, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee, a list of all uncompleted or unsatisfactory completed improvements. If such a request is made, the obligor shall send a copy of the request to the Borough Engineer. The request shall indicate which improvements have been completed and which improvements remain uncompleted in the judgment of the obligor. Thereupon the Borough Engineer shall inspect all improvements covered by the obligor's request and shall file a detailed list and report, in writing, with the governing body, and shall simultaneously send a copy thereof to the obligor not later than 45 days after receipt of the obligor's request.
B. 
The list prepared by the Borough Engineer shall state, in detail, with respect to each improvement determined to be incomplete or unsatisfactory, the nature and extent of the incompleteness of each incomplete improvement or the nature and extent of and remedy for, the unsatisfactory state of each completed improvement determined to be unsatisfactory. The report prepared by the Borough Engineer shall identify each improvement determined to be complete and satisfactory, together with a recommendation as to the amount of reduction to be made in the performance guarantee relating to the completed and satisfactory improvement, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee.
C. 
The governing body, by resolution, shall either approve the improvements determined to be complete and satisfactory by the Borough Engineer, or reject any or all of these improvements upon the establishment in the resolution of cause for rejection, and shall approve and authorize the amount of reduction to be made in the performance guarantee relating to the improvements accepted, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee. This resolution shall be adopted not later than 45 days after receipt of the list and report prepared by the Borough Engineer. Upon adoption of the resolution by the governing body, the obligor shall be released from all liability pursuant to its performance guarantee, with respect to those approved improvements, except for that portion adequately sufficient to secure completion or correction of the improvements not yet approved; provided that 30% of the amount of the performance guarantee posted may be retained to ensure completion of all acceptability of all improvements.
D. 
In the event that the obligor has made a cash deposit with the Borough or approving authority as part of the performance guarantee, then any partial reduction granted on the performance guarantee pursuant to this section shall be applied to the cash deposit in the same proportion as the original cash deposit bears to the full amount of the performance guarantee.
E. 
If any portion of the required improvements is rejected, the approving authority may require the obligor to complete or correct such improvements and, upon completion or correction, the same procedure of notification as set forth in this section shall be followed.
F. 
The obligor shall reimburse the Borough for all reasonable inspection fees paid to the Borough Engineer for the foregoing inspection of improvements, provided that the Borough may require of the developer a deposit for the inspection fees in an amount not to exceed, except for extraordinary circumstances, the greater of $500 or 5% of the cost of improvements, which cost shall be determined pursuant to N.J.S.A. 40:55D-53. For those developments for which the reasonably anticipated fees are less than $10,000, fees may, at the option of the developer, be paid in two installments. The initial amount deposited by a developer shall be 50% of the reasonably anticipated fees. When the balance on deposit drops to 10% of the reasonably anticipated fees because the amount deposited by the developer has been reduced by the amount paid to the Borough Engineer for inspection, the developer shall deposit the remaining 50% of the anticipated inspection fees. For those developments for which the reasonably anticipated fees are $10,000 or greater, fees may, at the option of the developer, be paid in four installments. The initial amount deposited by a developer shall be 25% of the reasonably anticipated fees. When the balance on deposit drops to 10% of the reasonably anticipated fees because the amount deposited by the developer has been reduced by the amount paid to the Borough Engineer for inspection, the developer shall make additional deposits of 25% of the reasonably anticipated fees. The Borough Engineer shall not perform any inspection if sufficient funds to pay for those inspections are not on deposit.
G. 
In the event that final approval is by stages or sections of development pursuant to N.J.S.A. 40:55D-38, the provisions of this section shall be applied by stage or section.
H. 
To the extent that any of the improvements have been dedicated to the Borough on the subdivision plat or site plan, the governing body shall be deemed, upon the release of any performance guarantee required pursuant to this section, to accept dedication for public use of streets or roads and any other improvements made thereon according to site plans and subdivision plats approved by the approving authority, provided that such improvements have been inspected and have received final approval by the Borough Engineer.
[Added 12-8-1993 by Ord. No. 93:19]
The approving authority shall accept a performance guarantee or maintenance guarantee which is an irrevocable letter of credit if it:
A. 
Constitutes an unconditional payment obligation of the issuer running solely to the Borough for an express initial period of time in the amount determined pursuant to N.J.S.A. 40:55D-53;
B. 
Is issued by a banking or savings institution authorized to do and doing business in the State of New Jersey;
C. 
Is for a period of time at least one year; and
D. 
Permits the Borough to draw upon the letter of credit if the obligor fails to furnish another letter of credit which complies with the provisions of this section 30 days or more in advance of the expiration date of the letter of credit or such longer period in advance thereof as is stated in the letter of credit.
In instances where the provisions of this Part 2 allow or require a cash contribution to the Borough to cover a share of the cost of all improvements, the approval of a site plan shall be further conditioned on the receipt of such contribution in the form of a certified check made out to the Borough of Somerdale and deposited in an account reserved for such improvements.