All building permit application fees for small-scale photovoltaic
systems on residential and nonresidential structures shall be waived,
provided the installation has not been commenced or completed before
a permit has been applied for or issued.
Prior to the issuance of a certificate of completion or compliance,
a sign (or decal) shall be affixed by the property owner to the utility
meter and at any alternating current (AC) disconnect switch indicating
the existence of an operating solar electric cogeneration system on
site.