A sketch plat is required of all applicants, as herein defined,
seeking a subdivision. It is for the purposes of classification and
initial discussion so that the applicants may obtain the advice of
the Joint Land Use Board and governing body in the formative stages
of the design and assure maximum coordination with the Master Plan.
The preliminary plat and supporting documents for a proposed
subdivision are intended to show the design of the subdivision and
its public improvements so that the Joint Land Use Board and governing
body can indicate their approval or disapproval of the subdivision
prior to the time that the final plat, including the design and detailing
of the public improvements and utilities, is completed.
[Amended 10-4-2018 by Ord. No. 11-18]
The Joint Land Use Board shall be empowered to require that the applicant furnish a performance bond for off-site and on-site improvements shown on its site plan for the purpose of guarantying the completion of said improvements in accordance with Articles
III and
IV of this chapter. An estimate of improvement cost shall be prepared by the Borough Engineer in order to determine the amount of the performance guaranty, which shall be reviewed and have the approval of the Borough Attorney as to both form and amount prior to the issuance of any permits. Posting of the performance guaranty shall be in accordance with the provisions of this chapter.
The purpose of the final plat is to have drawings in proper
form for filing with the county as well as detailed plans for all
installations, both of the above in accordance with local ordinances.
Approval of the final plat shall be the basis for filing with the
county.