New Impervious Area1, 2
(square feet)
|
Applicant Must Provide
| |
---|---|---|
0 to 2,500
|
No submission
| |
2,500 to 5,000
|
Documentation of impervious surfaces (small project SWM application)3
| |
>5,000
|
Rate controls, volume controls and SWM site plan
|
NOTES:
| ||
---|---|---|
1
|
New impervious area since the date of adoption of this chapter.
| |
2
|
Gravel in existing condition shall be considered pervious, and
gravel in proposed condition shall be considered impervious.
| |
3
|
The first page of the small project stormwater management application
included in Appendix E[1] may be used to document new impervious surfaces.
|
Pollutant Load
|
Units
|
Required Reduction
(%)
| |
---|---|---|---|
Total suspended solids (TSS)
|
Pounds
|
85
| |
Total phosphorous (TP)
|
Pounds
|
85
| |
Total nitrate (NO3)
|
Pounds
|
50
|