[HISTORY: Adopted by the Town Board of the Town of LaFayette
6-1984; amended 11-26-2001. Subsequent
amendments noted where applicable.]
As used in this chapter, the following terms shall have the
meanings indicated:
Written approval of the Highway Superintendent.
The granular material placed on the subgrade.
The transfer of the road to the Town of LaFayette.
Grading to a tolerance of 1/2 inch in 10 feet.
The elected LaFayette Town Highway Superintendent or his
duly appointed agent.
New York State Department of Transportation.
The LaFayette Town Planning Board appointed by the LaFayette
Town Board.
The total width of property to be deeded to the Town; minimum
of 60 feet wide.
The entire area disturbed for highway construction, from
top of slope to the toe of slope, including ditches.
That portion of the highway included between the outside
edges of the pavement.
The bottom of the granular base material.
The pavement on which traffic travels.
All tests, cores, inspections, etc. mentioned in these specifications
shall be performed without cost to the Town of LaFayette, and written
results of the same shall be filed with the Town.
The granular material placed on the base course.
Plans showing original and finished center-line profiles, a
typical cross-section and proposed drainage facilities shall be submitted
to the Town Planning Board and the Town Superintendent of Highways
before final subdivision plat approval can be given. No construction
shall be commenced until such approval has been given.
A.Â
General. The roadway shall be graded to subgrade as shown on the
approved plans by excavating the areas above the approved grades,
including ditch lines and back slopes, and by filling the areas below
the approved grades. The fill material shall consist of material from
the excavated areas after removal of all boulders, topsoil, stumps,
roots or other deleterious material, or from approved borrow pits.
B.Â
Stripping. Prior to the commencement of excavation or filling, stripping
shall be conducted to remove all topsoil, stumps, roots, organic matter
or other deleterious material for the full width of the right-of-way;
provided, however, that stripping is not required under fills where
the original grade is more than five feet below finished center-line
grade.
C.Â
Excavation. All excavation shall be executed in a workmanlike manner,
keeping the ditch lines below the cut to provide positive drainage
at all times throughout the excavating operation.
D.Â
Embankment. The material for embankment shall come either from the
cuts or approved borrow pits. The material shall consist of natural
soil free from large boulders, roots, topsoil or other deleterious
material and shall be of such gradation and moisture content that
it is capable of being compacted to the required density. The embankment
shall be built in a workmanlike manner. No embankment shall be placed
on frozen earth. It should be placed in horizontal layers of such
thickness to allow proper compaction and of such cross-section as
to permit proper drainage. "Proper compaction" is defined as an embankment
which does not weave, rut or displace in any manner under three consecutive
passes of a ten-wheel (three-axle) self-propelled dump truck loaded
to the maximum legal load traveling at a maximum speed of five miles
per hour. No stones over six inches in maximum dimension will be allowed
in the embankment closer than four feet of center-line finish grade.
E.Â
Preparation of subgrade. The subgrade shall be constructed to the
cross-sections and grades shown on the approved plans. The Highway
Superintendent shall be notified at least five days prior to the placing
of any granular material above the subgrade. He or his agent will
be present and the entire roadway shall be tested for proper compaction
as hereinbefore defined. Any areas in either cut or fill which weave,
rut or distort shall be repaired until they do not weave, rut or distort.
When the subgrade is satisfactory to the Highway Superintendent, he
will issue a written approval. No base course shall be placed above
subgrade until this written approval is obtained.
F.Â
Culverts and subsurface drainage and underground utilities.
(1)Â
All underground utilities, culverts and storm sewers, except driveway
pipes, shall be installed prior to placing the base course. All culverts
crossing the center line of the roadway shall be of a size 18 inches
in diameter or larger. All driveway culverts shall have a minimum
diameter of 12 inches. The material for all pipes shall conform to
the latest NYSDOT specifications and shall be installed according
to the manufacturer's specifications. Where catch basins or drop inlets
or manholes are called for, they shall be constructed of concrete
or masonry conforming to the latest NYSDOT specifications and shall
be of a size shown on their standard sheets. The frames and grates
or covers shall also conform to state specifications. Manufacturer's
certificates certifying that all pipe meets these specifications shall
be given to the Highway Superintendent before final acceptance of
the road. All pipes must be installed so that they have positive drainage
as shown on the approved plans.
(2)Â
Where the approved plans call for underdrain, or field conditions
require the installation of the same, the underdrain shall be six-inch-diameter
perforated pipe meeting the latest NYSDOT specifications. The underdrain
pipe shall be surrounded by a minimum of six inches of filter material
consisting of one part concrete sand, one part No. 1 stone and one
part No. 2 stone uniformly mixed together, or material conforming
to the latest NYSDOT specifications.
(3)Â
All exposed ends of pipes 12 inches or larger, including driveway
pipes, shall have end sections installed in conformance with NYSDOT
specifications.
(4)Â
All pipes and drainage structures are to be protected and maintained
and, if necessary, shall be cleaned, repaired or replaced before final
acceptance at no cost to the Town of LaFayette.
G.Â
Base course. Before any base course material is placed, the subgrade
shall be shaped to the cross-sections shown on the approved plans
and rolled with a flat-wheel roller to seal the surface. At any time
that the subgrade becomes rutted or out of shape ahead of the placing
of the base course, it shall be reshaped and sealed before any base
material is placed upon it.
(1)Â
Material. The granular material acceptable for this course may be
run-of-bank gravel or processed material complying with the NYSDOT
Specifications Section 304, Type 3, as follows: All particles shall
pass a four-inch square hole; not less than 30% by weight shall pass
the 1/4-inch sieve; not more than 40% by weight shall pass the No.
40 mesh sieve and not more than 10% by weight shall pass the No. 200
mesh sieve as determined by washing through the sieve in accordance
with ASTM Designation D422. The particles retained on the 1/4-inch
sieve shall have a loss, after four cycles of the Magnesium Sulfate
Soundness Test, not exceeding 30% by weight. The particles passing
the No. 40 mesh sieve shall have a maximum plasticity index of five.
(2)Â
Construction.
(a)Â
The material shall be spread so that no appreciable segregation
of particle sizes occurs. The material shall be placed in horizontal
layers not exceeding eight inches in thickness after compaction, to
a total maximum depth of 14 inches. Compaction may be done with approved
vibrating compaction equipment, a flat-wheel roller weighing approximately
10 tons or rubber-tired rollers or equipment if approved by the Highway
Superintendent. Each layer shall be compacted to at least 95% of the
maximum density determined in accordance with ASTM D1557.
(b)Â
Before the top course is placed on top of the base course, a
sample shall be taken under the direction of the Highway Superintendent
for a compaction test. Using an approved testing laboratory, the material
must have a minimum dry density of 95% of the maximum dry weight density
in pounds per cubic foot as determined by the American Association
of State Highway and Transportation Officials (AASHTO) standard density
test or the Proctor compaction test. A certification of this test
shall be given to the Highway Superintendent before final acceptance.
[Amended 12-8-2020 by L.L. No. 2-2020]
(c)Â
Any material not meeting the specifications shall be removed
and replaced. No material shall be placed when either fill material
or previous layer is frozen. In the event that any fill which has
already been placed or the subgrade shall become frozen, it shall
be scarified and recompacted, or removed, to the approval of the Highway
Superintendent.
H.Â
Top course.
(1)Â
Material. The material acceptable for this course shall be run-of-crusher
hard, durable limestone complying with the latest NYSDOT Specification,
Section 703, and shall be size designation No. 2.
(2)Â
Construction.
(a)Â
The installation of this course shall take place immediately
preceding the installation of the surface course. The base course
shall be clean and free of objectionable material. Objectionable base
course material shall be removed and replaced with suitable material.
(b)Â
Construction of this course shall be the same as the base course
except that the minimum thickness shall be four inches. Before the
surface course is placed, an in-place sample of the top course shall
be taken under the direction of the Highway Superintendent and tested
by an approved testing laboratory and a certification of this test
shall be filed with the Highway Superintendent before final acceptance.
(c)Â
The top course of asphalt on any road designated for dedication
to the Town shall not be installed for at least one full winter following
acceptable installation of the asphalt binder course, and until a
majority of the building construction has been completed (minimum
eight months, maximum 20 months).
(d)Â
The Town of LaFayette Highway Superintendent shall determine
the actual time when the top course can be placed.
I.Â
Surface course. After the top course is completed to a tolerance
of 1/2 inch in 10 feet as shown on the approved plans and cross-sections
and sealed with a flat-wheel roller weighing approximately 10 tons
and approved by the Highway Superintendent, the surface course shall
be applied.
(1)Â
Material. The surface course shall consist of a two-course bituminous
concrete plant mix complying with NYSDOT Specification Section 403,
Type 3 Binder and Type 7 Top.
(2)Â
Construction. The bituminous concrete plant mix shall be placed with
an approved spreader to the thickness shown on the plans or approved
by the Town Planning Board. Immediately following placing of the hot
mix, it shall be rolled with a flat-wheel roller weighing approximately
10 tons equipped with a device to keep the rollers wet so that no
mix adheres to the rollers. The rolling shall continue until the roller
does not leave any ruts or tracks. Bituminous concrete pavement shall
have a crown of 1/4 inch per foot. No bituminous concrete paving shall
be done over a wet surface or when the temperature is below 50°
F. All bituminous concrete pavement shall be cored under the direction
of the Highway Superintendent. The cores shall be taken at not more
than 500-foot intervals. Any core found to be more than 1/8 of an
inch short of the specified thickness shall be unacceptable and the
area represented by it shall be covered with another layer of bituminous
concrete.
J.Â
Binder course. The owner is responsible for maintaining and repairing
the binder course as directed by the Town Highway Superintendent until
placement of the top course.
K.Â
Curbs, curbs and gutters or gutters. Curbs, curbs and gutters or
gutters may be installed if a detailed plan is submitted and approved.
All curbs, curbs and gutters or gutters shall have a six-inch perforated
underdrain as hereinbefore specified placed under them, and the flow
line of the underdrain shall be a minimum of four inches below subgrade
at the edge of the shoulder, and must drain to a positive drainage
system.
L.Â
Guide rails.
(1)Â
Guide rails shall be installed as required by the NYSDOT Highway
Design Manual Volume 1 or as required by the Town Superintendent of
Highways.
(3)Â
All guide rail materials and installation methods shall be in accordance
with the latest NYSDOT standards Because guide rails are also a roadside
hazard, the designer should review all proposed installations with
the intention of eliminating, where possible, the factors that warrant
the guide rail installation.
[Added 12-8-2020 by L.L.
No. 2-2020]
Anyone who desires to conduct work within the Town's highway
right-of-way is required to complete a highway work permit application
form and obtain a valid highway work permit from the Town's Highway
Department.